1267 Sheridan Avenue
Bronx, NY 10456BBL 2-02457-0052Map
Owner of record: 1267 Sheridan LLC
1267 Sheridan Avenue is a walk-up apartment building built in 1923 in Bronx, 10456. It has 66 residential units across 5 floors. The owner of record is 1267 Sheridan LLC. HPD has recorded 2,121 housing violations here, most recently on October 3, 2026. 46 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 2,121
- DOB violations
- 10
- ECB violations
- 10
- HPD complaints
- 1,728
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 2,121
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1f, 1st story, 1st apartment from north at east
Oct 3, 2026 · Apt 1F
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1f, 1st story, 1st apartment from north at east
Oct 3, 2026 · Apt 1F
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 20sqft at ceiling in the bathroom located at apt 1f, 1st story, 1st apartment from north at east
Oct 3, 2026 · Apt 1F
Open — Notice of issuance sent to tenant - BHazardous
Provide adequate supply of hot water for the fixtures at bathtub in the bathroom located at apt 1f, 1st story, 1st apartment from north at east
Oct 3, 2026 · Apt 1F
Open — Nov sent out - BHazardous
Repair the broken or defective connection at drain line at washbasin in the bathroom located at bsmt-apt n4, 2nd bsmt-apt from south at west
Sep 30, 2026 · Apt N4
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the bathroom located at apt n4, 2nd apartment from south at west
Sep 30, 2026 · Apt N4
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in at drain line at bathtub in the bathroom located at bsmt-apt n4, 2nd bsmt-apt from south at west
Sep 30, 2026 · Apt N4
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from east located at bsmt-apt n4, 2nd bsmt-apt from south at west
Sep 30, 2026 · Apt N4
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at bsmt-apt n4, 2nd bsmt-apt from south at west
Sep 30, 2026 · Apt N4
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective cracked riser at ceiling in the bathroom located at bsmt-apt n4, 2nd bsmt-apt from south at west
Sep 30, 2026 · Apt N4
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective cracked riser at ceiling in the bathroom located at bsmt-apt n4, 2nd bsmt-apt from south at west
Sep 30, 2026 · Apt N4
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tile at north wall in the bathroom located at bsmt-apt n4, 2nd bsmt-apt from south at west
Sep 30, 2026 · Apt N4
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt n4, 2nd apartment from south at west
Sep 30, 2026 · Apt N4
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tile floor in the bathroom located at apt 3a, 3rd story, 2nd apartment from east at south
Sep 17, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from east located at apt 3a, 3rd story, 2nd apartment from east at south
Sep 17, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 3a, 3rd story, 2nd apartment from east at south
Sep 17, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 3a, 3rd story, 2nd apartment from east at south
Sep 17, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 3a, 3rd story, 2nd apartment from east at south
Sep 17, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3a, 3rd story, 2nd apartment from east at south
Sep 17, 2026 · Apt 3A
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft at ceiling in the bathroom located at apt 3a, 3rd story, 2nd apartment from east at south
Sep 17, 2026 · Apt 3A
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3a, 3rd story, 2nd apartment from east at south
Sep 17, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 16, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 16, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at floor landing at public hall, 3rd story, section ''1269''
Sep 9, 2026
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt n1, 1st story, 1st apartment from south at west
Aug 22, 2026 · Apt N1
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq ft at ceiling in the bathroom located at apt n1, 1st story, 1st apartment from south at west
Aug 22, 2026 · Apt N1
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the baseboard at east wall, 1st closet from south at west wall door, 1st door from east at south wall in the 1st room from east at north located at apt 3a, 3rd story, 2nd apartment from west at north
Aug 22, 2026 · Apt 3A
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east at south located at apt 3a, 3rd story, 2nd apartment from west at north
Aug 22, 2026 · Apt 3A
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 3a, 3rd story, 2nd apartment from west at north
Aug 22, 2026 · Apt 3A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall, 1st window frame from north at east wall in the 1st room from east at north located at apt 3a, 3rd story, 2nd apartment from west at north
Aug 22, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective base cabinet at sink in the kitchen located at apt 3a, 3rd story, 2nd apartment from west at north
Aug 22, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in waste line at sink in the kitchen located at apt 3a, 3rd story, 2nd apartment from west at north
Aug 22, 2026 · Apt 3A
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective vinyl tiles at floor in the kitchen located at apt 3a, 3rd story, 2nd apartment from west at north
Aug 22, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 3a, 3rd story, 2nd apartment from west at north
Aug 22, 2026 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 3rd story, 2nd apartment from west at north
Aug 22, 2026 · Apt 3A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3a, 3rd story, 2nd apartment from west at north
Aug 22, 2026 · Apt 3A
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish glaze at bathtub in the bathroom located at apt 3a, 3rd story, 2nd apartment from west at north
Aug 22, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in waste line at bathtub in the bathroom located at apt 3a, 3rd story, 2nd apartment from west at north
Aug 22, 2026 · Apt 3A
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective vinyl tiles at floor in the 2nd room from east at south located at apt 3a, 3rd story, 2nd apartment from west at north
Aug 22, 2026 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt n1, 1st story, 1st apartment from south at west
Aug 22, 2026 · Apt N1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, north wall, baseboard at east wall, west wall in the 2nd room from east at south located at apt 3a, 3rd story, 2nd apartment from west at north
Aug 22, 2026 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from south at west wall in the 2nd room from east at south located at apt 3a, 3rd story, 2nd apartment from west at north
Aug 22, 2026 · Apt 3A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the 1st room from east at south located at apt 3a, 3rd story, 2nd apartment from west at north
Aug 22, 2026 · Apt 3A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from south at west wall in the 2nd room from east at south located at apt 3a, 3rd story, 2nd apartment from west at north
Aug 22, 2026 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). baseboard at east wall, 1st closet from south at west wall door, 1st door from east at south wall in the 1st room from east at north located at apt 3a, 3rd story, 2nd apartment from west at north
Aug 22, 2026 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame, 1st door frame from east at south wall, north wall in the 1st room from east at north located at apt 3a, 3rd story, 2nd apartment from west at north
Aug 22, 2026 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). east wall in the 1st room from east at south located at apt 3a, 3rd story, 2nd apartment from west at north
Aug 22, 2026 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north located at apt n1, 1st story, 1st apartment from south at west
Aug 22, 2026 · Apt N1
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt n1, 1st story, 1st apartment from south at west
Aug 22, 2026 · Apt N1
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt n1, 1st story, 1st apartment from south at west
Aug 22, 2026 · Apt N1
Open — Notice of issuance sent to tenant
DOB building violations · 10
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 6, 2024
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)
Jun 29, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2019
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2018)
Mar 18, 2019
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2017
Mar 27, 2018
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2016
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 10
- Class - 2
Failure to comply with commissioner's order contained in summons #39101915y issued on 12/20/2023, and failure to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2). an acceptable cert
Feb 11, 2025 · Penalty $1,250
Active - Class - 2
Failure to comply with commissioner's order contained in summons #39101444r issued on 12/14/2023, and failure to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2). an acceptable cert
Feb 11, 2025 · Penalty $1,250
Resolve - Class - 1
Observed on second floor apartment 2f in the bathroom bathtub spot is constantly running water not shutting off also bathroom sink waste line is clogged which is contrary to code section pc 301.3, repair and/re
Jan 5, 2024 · Penalty $625
Resolve - Class - 3
Failure to provide access to heating system as per hmc 23-2033.; misc-27
Dec 20, 2023 · Penalty $500
Resolve - Class - 2
Failure to maintain building in code compliant manner. noted : observed on the second,third, and fourth floor, there are multiple cracks on the floor and wall, also in apartment #n3 there are cracks on the floo
Dec 14, 2023 · Penalty $625
Resolve - Class - 3
Work without a permit.noted:at front of apartment full height partition walls erected created an additional bedroom with a door.rem:obtain permit or restore to prior legal condition.
May 18, 2018 · Penalty $250
Resolve - Hazardous
Sidewalk shed does not meet bldg dep code. noted: shed at time of inspection is missing decking & lighting on sheridan ave bldg entrance w/ suspended scaffolds not tied in on top shed. remedy: maintain shed as
Apr 15, 2007 · Penalty $2,000
Resolve - Hazardous
Failure to post contractors sign. noted: no contractors sign observed at the sheridan ave side or the e 168 st side. remedy: post contractors sign as per dob code.
Apr 15, 2007
Resolve - Non-hazardous
Sec 27-1021. no permit holder sign posted on sidewalk shed. noted: no permit holder sign posted on sidewalk shed on sheridan ave or e 168 stsides. remedy: post permit holder sign as per dob code.
Apr 15, 2007 · Penalty $200
Resolve - Hazardous
Exit passageway: total obstruction. at the north east fire escape at front of premises 1269 sheridan ave. plywood is covering the drop ladder. remedy: remove obstruction.
Mar 10, 2005
Resolve
Complaints
- Water leak
Heavy flow
Oct 5, 2026 · Apt 2A
Open - Door/window
Window frame
Oct 5, 2026 · Apt 2A
Open - Heat/hot water
Apartment only
Oct 2, 2026 · Apt 1F
Close - Flooring/stairs
Floor
Oct 2, 2026 · Apt 1F
Open - Unsanitary condition
Mold
Oct 2, 2026 · Apt 1F
Open - Plumbing
Basin/sink
Oct 2, 2026 · Apt 1F
Open - Paint/plaster
Wall
Sep 29, 2026 · Apt N4
Close - Plumbing
Basin/sink
Sep 29, 2026 · Apt N4
Close - Plumbing
Bathtub/shower
Sep 29, 2026 · Apt N4
Close - Paint/plaster
Ceiling
Sep 29, 2026 · Apt N4
Close
Show 40 more ↓
- Appliance
Electric/gas range
Sep 8, 2026 · Apt 3A
Close - Door/window
Window frame
Sep 1, 2026 · Apt 3J
Open - Water leak
Slow leak
Sep 1, 2026 · Apt 3J
Open - Flooring/stairs
Floor
Sep 1, 2026 · Apt 3J
Open - Water leak
Heavy flow
Aug 28, 2026 · Apt 2A
Close - Water leak
Heavy flow
Aug 20, 2026 · Apt N1
Close - Paint/plaster
Ceiling
Aug 20, 2026 · Apt N1
Close - Water leak
Heavy flow
Aug 20, 2026 · Apt N1
Close - Appliance
Electric/gas range
Aug 7, 2026 · Apt 3A
Close - Plumbing
Basin/sink
Jul 13, 2026 · Apt 1F
Close - Paint/plaster
Wall
Jul 13, 2026 · Apt 1F
Close - Flooring/stairs
Floor
Jul 13, 2026 · Apt 1F
Close - Paint/plaster
Ceiling
Jul 13, 2026 · Apt 1F
Close - Plumbing
Toilet
Jul 13, 2026 · Apt 1F
Close - Plumbing
Water supply
Jul 2, 2026 · Apt BLDG
Close - Paint/plaster
Ceiling
Jun 13, 2026 · Apt N4
Close - Paint/plaster
Ceiling
Jun 11, 2026 · Apt N1
Close - Water leak
Damp spot
Jun 11, 2026 · Apt N1
Close - Paint/plaster
Ceiling
Jun 11, 2026 · Apt N1
Close - Unsanitary condition
Sewage
Jun 3, 2026 · Apt 1F
Close - Water leak
Slow leak
Jun 3, 2026 · Apt 1F
Close - Unsanitary condition
Pests
Jun 3, 2026 · Apt 1F
Close - Plumbing
Toilet
Jun 3, 2026 · Apt 1F
Close - Flooring/stairs
Floor
Jun 3, 2026 · Apt 1F
Close - Plumbing
Basin/sink
Jun 3, 2026 · Apt 1F
Close - Paint/plaster
Wall
Jun 3, 2026 · Apt 1F
Close - Paint/plaster
Ceiling
Jun 3, 2026 · Apt 1F
Close - Unsanitary condition
Mold
May 24, 2026 · Apt 3F
Close - Water leak
Heavy flow
May 24, 2026 · Apt 3F
Close - Plumbing
Toilet
May 24, 2026 · Apt 1F
Close - Water leak
Slow leak
May 24, 2026 · Apt 1F
Close - Heat/hot water
Apartment only
May 22, 2026 · Apt N4
Close - Heat/hot water
Entire building
May 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 21, 2026 · Apt BLDG
Close - Plumbing
Bathtub/shower
May 11, 2026 · Apt 1B
Close - Water leak
Heavy flow
Apr 24, 2026 · Apt APT1L
Close - Paint/plaster
Ceiling
Apr 24, 2026 · Apt APT1L
Close - Unsanitary condition
Mold
Apr 24, 2026 · Apt APT1L
Close - Paint/plaster
Ceiling
Apr 21, 2026 · Apt 1L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1923
- Floors
- 5
- Residential units
- 66
- Building area
- 59,800 ft²
- Lot area
- 14,217 ft²
- Zoning
- R8
- Community board
- 204
- Council district
- 16
- Block / lot
- 2457 / 52
- Assessed value
- $1,500,750
- Landmark / historic district
- No
HPD registration #208644, last renewed Jun 8, 2026.
Questions about 1267 Sheridan Avenue
Who owns 1267 Sheridan Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 1267 Sheridan LLC.
Does 1267 Sheridan Avenue have violations?
Yes. NYC HPD has recorded 2,121 housing violations at this property.
Is 1267 Sheridan Avenue rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 9% of its 66 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1267 Sheridan Avenue built?
City records list 1923 as the year it was built.
How many apartments are in 1267 Sheridan Avenue?
It has 66 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.