1280 Sheridan Avenue
Bronx, NY 10456BBL 2-02453-0055Map
Owner of record: Bronx Preservation Housing Development F Und Corp.
1280 Sheridan Avenue is an elevator apartment building built in 1925 in Bronx, 10456. It has 57 residential units across 6 floors. The owner of record is Bronx Preservation Housing Development F Und Corp.. HPD has recorded 299 housing violations here, most recently on August 1, 2026. 11 of the 50 most recent violations are still open. City tax records listed 57 rent-stabilized apartments here in 2024.
- HPD violations
- 299
- DOB violations
- 43
- ECB violations
- 18
- HPD complaints
- 493
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 299
- BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet flush handle defective in the bathroom located at apt 5b, 5th story, 1st apartment from south at west
Aug 1, 2026 · Apt 5B
Open — First no access to re- inspect violation - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0, wg to replace = 0, wg to repair = 2 in the entire apartment located at apt 5b, 5th story, 1st apartment from south at west , section ''north''
Jul 19, 2026 · Apt 5B
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 5b, 5th story, 1st apartment from south at west , section ''north''
Jul 19, 2026 · Apt 5B
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5b, 5th story, 1st apartment from south at west , section ''north''
Jul 19, 2026 · Apt 5B
Open — First no access to re- inspect violation - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at west exterior wall at 1st fire escape from north, 3rd story
Jul 19, 2026
Open — False certification - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5b, 5th story, 1st apartment from south at west , section ''north''
Jul 19, 2026 · Apt 5B
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at observed droopings at south court yard
May 20, 2026
Open — Defect letter issued - BHazardous
Properly repair or replace the broken or defective latchset and assemblies at door in the entrance located at apt 5b, 5th story, 1st apartment from south at west
May 18, 2026 · Apt 5B
Closed — Violation closed - ANon-hazardous
Cleanse to the satisfaction of this department the caulking at the joint around the bathtub, in the bathroom located at apt 5b, 5th story, 1st apartment from south at west
May 18, 2026 · Apt 5B
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective cracked radiator cover at north wall in the 1st room from north located at apt 5b, 5th story, 1st apartment from south at west
May 18, 2026 · Apt 5B
Closed — Violation closed
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective wooden cabinet doors at lower sink in the kitchen located at apt 5b, 5th story, 1st apartment from south at west
May 18, 2026 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5b, 5th story, 1st apartment from south at west
May 18, 2026 · Apt 5B
Open — False certification - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5b, 5th story, 1st apartment from south at west
May 18, 2026 · Apt 5B
Open — False certification - BHazardous
Properly repair with similar material the broken or defective sagging plywood floor in the 1st room from north located at apt 5b, 5th story, 1st apartment from south at west
May 18, 2026 · Apt 5B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 3rd room from east located at apt 4d, 4th story, 1st apartment from north at east
Apr 29, 2026 · Apt 4D
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4d, 4th story, 1st apartment from north at east
Apr 29, 2026 · Apt 4D
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4d, 4th story, 1st apartment from north at east
Apr 29, 2026 · Apt 4D
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at lobby
Mar 5, 2026
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at lobby
Mar 5, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door, leading from center section to north section at public hall, 6th story
Feb 1, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at fire exit door leading to west court yard (from public hall to court yard) , 2nd story
Feb 1, 2026
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at noth wall ceiling in the kitchen located at apt 2j, 2nd story, 1st apartment from south at west , section ''south''
Feb 1, 2026 · Apt 2J
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of door sweep in the entrance located at apt 6d, 6th story, 1st apartment from north at east
Feb 1, 2026 · Apt 6D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at 2nd window from west at north wall ceiling in the 1st room from north at west located at apt 6d, 6th story, 1st apartment from north at east
Feb 1, 2026 · Apt 6D
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at 2nd window from west at north, ceiling in the 1st room from north at west located at apt 6d, 6th story, 1st apartment from north at east
Feb 1, 2026 · Apt 6D
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 6d, 6th story, 1st apartment from north at east
Feb 1, 2026 · Apt 6D
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set and it's assemblies at fire exit door leading to west court yard (from public hall to court yard) , 2nd story
Feb 1, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2j, 2nd story, 1st apartment from south at west , section ''south''
Feb 1, 2026 · Apt 2J
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2j, 2nd story, 1st apartment from south at west , section ''south''
Feb 1, 2026 · Apt 2J
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Feb 1, 2026
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall ceiling in the kitchen located at apt 2j, 2nd story, 1st apartment from south at west , section ''south''
Feb 1, 2026 · Apt 2J
Closed — Violation dismissed - BHazardous
Provide adequate supply of cold water for the fixtures at bathtub in the bathroom located at apt 2j, 2nd story, 1st apartment from south at west , section ''south''
Feb 1, 2026 · Apt 2J
Closed — Violation closed - BHazardous
Provide adequate supply of hot water for the fixtures at bath tub in the bathroom located at apt 2j, 2nd story, 1st apartment from south at west , section ''south''
Feb 1, 2026 · Apt 2J
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6d, 6th story, 1st apartment from north at east
Feb 1, 2026 · Apt 6D
Closed — Violation closed - CImmediately hazardous
Remove all obstructions and repair all defects in sink wasteline in the kitchen located at apt 2j, 2nd story, 1st apartment from south at west , section ''south''
Feb 1, 2026 · Apt 2J
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system lock door at boiler room
Jan 28, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch to vestibule door at public hall, 1st story
Jan 28, 2026
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings defective
Jan 28, 2026 · Apt 6B
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch set and assembly to vestibule door at public hall, 1st story
Jan 28, 2026
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 6b, 6th story, 1st apartment from south at west
Jan 28, 2026 · Apt 6B
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... mold less than 10sq feet at ceiling and all walls in the bathroom located at apt 6b, 6th story, 1st apartment from south at west
Jan 28, 2026 · Apt 6B
Closed — Violation dismissed - BHazardous
Properly secure the loose wash basin faucet in the bathroom located at apt 5b, 5th story, 1st apartment from south at west
Jan 28, 2026 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 5b, 5th story, 1st apartment from south at west
Jan 28, 2026 · Apt 5B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5b, 5th story, 1st apartment from south at west
Jan 28, 2026 · Apt 5B
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5b, 5th story, 1st apartment from south at west
Jan 28, 2026 · Apt 5B
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6b, 6th story, 1st apartment from south at west
Jan 28, 2026 · Apt 6B
Closed — Violation closed - BHazardous
Repair the leaky and/or defective water supply pipe at wash basin in the bathroom located at apt 2j, 3rd story, 1st apartment from south at west , section at south
Jan 27, 2026 · Apt 2J
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in waste pipe of the sink in the kitchen located at apt 2j, 3rd story, 1st apartment from south at west , section at south
Jan 27, 2026 · Apt 2J
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 2nd room from east at south located at apt 2j, 3rd story, 1st apartment from south at west , section at south
Jan 27, 2026 · Apt 2J
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Jan 27, 2026
Closed — Violation dismissed
DOB building violations · 43
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 8, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 19, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 3, 2014
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 26, 2013
Dob violation - resolved
Show 33 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Jan 20, 2012
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 23, 2011
Dob violation - resolved - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 25, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 22, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 17, 2007
Dob violation - resolved - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 17, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 10, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 25, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 28, 2003
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Elevator elevatorrequired
2p5183
Dec 10, 2002
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Elevator elevatorrequired
Device #2p5183
Mar 22, 1991
Vp*-violation unserved ecb- dismissed - Elevator elevatorrequired
(51)replace missing dust covers where necessary(52)clean car top (53)replace missing splice box covers where necessary(54)provide light under car
Aug 9, 1988
Dob violation - resolved
ECB violations · 18
- Class - 3
Observed in apt#5b minor cracks on sheetrock plaster work on ceiling and walls., repair and or replace; repair ceiling and walls.
Mar 4, 2025
Resolve - Class - 2
Failure to maintain building wall(s)or appurtenances.note:at time of inspection observed at exp #2 east elevation deteriorating brick masonry/spalling stucco.exp #4 west elevation crack brick masonry joints.rem
Jan 24, 2023 · Penalty $620
Resolve - Class - 1
Filed a certificate of correction or other related materials containing material false statement.note:respondent filed certificate of correction for ecb #35647144y dated 4/15/22 required respondent to correct d
Oct 31, 2022 · Penalty $10,000
Resolve - Class - 2
Failure to submit acceptable required cycle8c report of critical exam documenting condition of exterior wall&appurtenances required by28-302.4 for control807550.submit acceptable req tech report
Oct 19, 2022
Resolve - Class - 1
Failure to comply with commissioner's order.note:ecb violation #35663804k issued 6/29/22 at time of inspection conditions observed non provided.remedy:comply with commissioner's order.
Aug 17, 2022
Resolve - Class - 1
Failure to comply with an order of the commissioner's.note:at present time no.acceptable structural stability evaluation report of building facade was submitted to dob as directed in the commissioner's order nu
Jun 29, 2022 · Penalty $2,500
Resolve - Class - 1
Failure to maintain building exterior walls/facade and appurenances.attime of inspection observed crack at 2 floor corner of 1 and 2 and 1 &4 at exposure 1 north elevation.also cracks at entrance canopy.exposur
Apr 15, 2022 · Penalty $6,250
Resolve - Class - 1
Failure to maintain exterior building facade and appurtenances.at west elevation exp #4 observed bulged masonry and inadequate repairs at 7th floor also at east elevation exposure #2 observed cracked stucco and
Feb 8, 2022 · Penalty $2,500
Resolve - Class - 2
96m07,16m07,13i10,03x10,60x10,60x10,56y10,05l10,70o02. 96m07-in case of fire signs missing provide; 16m07-braille bags missing outside hoistway doors provide; 13i10-emergency light damage must repair;03x10-
Sep 9, 2014 · Penalty $500
Resolve - Class - 2
Fail to maintain ext bldg.east elevation expo 2,3rd fl vert crack in masonry.south elevation expo 3 spalled masonry,vertical crack w/open mortar joints.rem:maintain ext bldg,provide safety measures repair facad
May 30, 2014 · Penalty $250
Resolve
Show 8 more ↓
- Class - 2
24-l-10/35-q-03/90-q-03/67-m-07/70-o-02/71-q-03/24-l-10-repair hall p.i.where necessary/35-q-03-install guard for electrical wiring in shaftway @ lobby flr(greenfield)67-m-07-provide communication in car(teleph
Jun 8, 2011
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations
Oct 23, 2009
Resolve - Class - 2
Failure to submit an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 & the dob rules & regulations
Jan 23, 2009 · Penalty $800
Resolve - Non-hazardous
5702/1806/802/3002 - secure 1st fl. innerlock where needed.
Sep 19, 2000
Resolve - Non-hazardous
57o 30o 73x 8l 32m 55x 35p 14m 74d restore elevator to secure to be insp property d o b proeprty replace hoisty door sill in lobby wire in shaftway provide duct cover glass missing from frame secure toe guard u
Aug 10, 1999
Resolve - Non-hazardous
Failure to file a report of compliance for local law 16/84 certifying to the installation of required fire protection systems. remedy: file report.
Apr 12, 1999 · Penalty $400
Resolve - Non-hazardous
73x.73-restore elev to severice so a proper inspection can be made of this dept.
Sep 12, 1995
Resolve - Non-hazardous
03i;21l;28h;37r;40# 40.perform test and label
Mar 22, 1991
Resolve
Complaints
- Plumbing
Radiator
Sep 18, 2026 · Apt 2C
Open - Flooring/stairs
Floor
Sep 18, 2026 · Apt 2C
Open - Unsanitary condition
Pests
Sep 18, 2026 · Apt 2C
Open - Door/window
Door
Sep 18, 2026 · Apt 2C
Open - Unsanitary condition
Pests
Aug 13, 2026 · Apt 2C
Open - General
Cabinet
Aug 13, 2026 · Apt 2C
Open - Door/window
Door
Aug 13, 2026 · Apt 2C
Open - Paint/plaster
Wall
Aug 10, 2026 · Apt 2E
Close - Flooring/stairs
Floor
Aug 10, 2026 · Apt 2E
Close - Paint/plaster
Wall
Aug 10, 2026 · Apt 2E
Close
Show 40 more ↓
- Flooring/stairs
Floor
Aug 10, 2026 · Apt 2E
Close - General
Cabinet
Jul 16, 2026 · Apt 5B
Open - Plumbing
Toilet
Jul 16, 2026 · Apt 5B
Open - Unsanitary condition
Mold
Jul 16, 2026 · Apt 5B
Close - Plumbing
Bathtub/shower
Jul 16, 2026 · Apt 5B
Close - Unsanitary condition
Pests
Jul 16, 2026 · Apt 5B
Close - Paint/plaster
Wall
Jul 16, 2026 · Apt 5B
Close - Door/window
Door
Jul 16, 2026 · Apt 5B
Close - Unsanitary condition
Pests
Jul 16, 2026 · Apt 5B
Close - General
Cabinet
Jul 16, 2026 · Apt 5B
Close - Unsanitary condition
Mold
May 16, 2026 · Apt 5B
Close - Plumbing
Steam pipe/riser
May 16, 2026 · Apt 5B
Close - Plumbing
Bathtub/shower
May 16, 2026 · Apt 5B
Close - Flooring/stairs
Floor
May 16, 2026 · Apt 5B
Close - General
Cabinet
May 16, 2026 · Apt 5B
Close - Unsanitary condition
Pests
May 16, 2026 · Apt 5B
Close - Unsanitary condition
Pests
May 16, 2026 · Apt 5B
Close - Unsanitary condition
Pests
May 11, 2026 · Apt 2E
Close - Unsanitary condition
Mold
Apr 23, 2026 · Apt 4D
Close - Heat/hot water
Apartment only
Apr 20, 2026 · Apt 5B
Close - Unsanitary condition
Pests
Feb 24, 2026 · Apt 5B
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 1, 2026 · Apt 5B
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt 2J
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 29, 2026 · Apt 2J
Close - Heat/hot water
Apartment only
Jan 28, 2026 · Apt 5B
Close - Line of travel
Line of travel
Jan 27, 2026 · Apt BLDG
Close - Line of travel
Line of travel
Jan 27, 2026 · Apt 6F
Close - Line of travel
Line of travel
Jan 27, 2026 · Apt 6J
Close - Line of travel
Line of travel
Jan 27, 2026 · Apt BLDG
Close - Line of travel
Line of travel
Jan 27, 2026 · Apt 3F
Close - Line of travel
Line of travel
Jan 27, 2026 · Apt BLDG
Close - Line of travel
Line of travel
Jan 27, 2026 · Apt 1D
Close - General
Cabinet
Jan 27, 2026 · Apt 6H
Close - Heat/hot water
Apartment only
Jan 27, 2026 · Apt 6H
Close - Plumbing
Basin/sink
Jan 27, 2026 · Apt 2J
Close - Plumbing
Basin/sink
Jan 27, 2026 · Apt 2J
Close - Heat/hot water
Apartment only
Jan 27, 2026 · Apt 2J
Close - Line of travel
Line of travel
Jan 27, 2026 · Apt 2F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1925
- Floors
- 6
- Residential units
- 57
- Building area
- 65,130 ft²
- Lot area
- 13,531 ft²
- Zoning
- R7-1
- Community board
- 204
- Council district
- 16
- Block / lot
- 2453 / 55
- Assessed value
- $2,475,450
- Landmark / historic district
- No
HPD registration #208958, last renewed Aug 14, 2025.
Questions about 1280 Sheridan Avenue
Who owns 1280 Sheridan Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Bronx Preservation Housing Development F Und Corp..
Does 1280 Sheridan Avenue have violations?
Yes. NYC HPD has recorded 299 housing violations at this property.
Is 1280 Sheridan Avenue rent stabilized?
NYC Department of Finance tax bills listed 57 rent-stabilized units here in 2024 (about 100% of its 57 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1280 Sheridan Avenue built?
City records list 1925 as the year it was built.
How many apartments are in 1280 Sheridan Avenue?
It has 57 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.