381 East 160 Street
Bronx, NY 10451BBL 2-02407-0029Map
Owner of record: 381 East 160th LLC
381 East 160 Street is a walk-up apartment building built in 1914 in Bronx, 10451. It has 26 residential units across 5 floors. The owner of record is 381 East 160th LLC. HPD has recorded 666 housing violations here, most recently on October 1, 2026. 34 of the 50 most recent violations are still open. City tax records listed 25 rent-stabilized apartments here in 2024.
- HPD violations
- 666
- DOB violations
- 6
- ECB violations
- 1
- HPD complaints
- 723
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 666
- BHazardous
Properly repair or replace the broken or defective bell buzzer intercom system from the building entrance door to panel at east wall located at apt 18, 1st story
Oct 1, 2026 · Apt 18
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 7, 2nd story, 2nd apartment from west at north
Sep 18, 2026 · Apt 7
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the bathroom located at apt 7, 2nd story, 2nd apartment from west at north
Sep 18, 2026 · Apt 7
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 2nd room from east located at apt 7, 2nd story, 2nd apartment from west at north
Sep 18, 2026 · Apt 7
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st door frame from south at west wall, west wall in the 1st room from east at north located at apt 7, 2nd story, 2nd apartment from west at north
Sep 18, 2026 · Apt 7
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the kitchen located at apt 7, 2nd story, 2nd apartment from west at north
Sep 18, 2026 · Apt 7
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the bathroom located at apt 7, 2nd story, 2nd apartment from west at north
Sep 18, 2026 · Apt 7
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 2nd room from east located at apt 7, 2nd story, 2nd apartment from west at north
Sep 18, 2026 · Apt 7
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st door frame from south at west wall, west wall in the 1st room from east at north located at apt 7, 2nd story, 2nd apartment from west at north
Sep 18, 2026 · Apt 7
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the kitchen located at apt 7, 2nd story, 2nd apartment from west at north
Sep 18, 2026 · Apt 7
Open — Certification postponment granted
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 7, 2nd story, 2nd apartment from west at north
Sep 18, 2026 · Apt 7
Open — Civ14 mailed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic tiles wall in the bathroom located at apt 7, 2nd story, 2nd apartment from west at north
Sep 18, 2026 · Apt 7
Open — Civ14 mailed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 7, 2nd story, 2nd apartment from west at north
Sep 18, 2026 · Apt 7
Open — Civ14 mailed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east located at apt 7, 2nd story, 2nd apartment from west at north
Sep 18, 2026 · Apt 7
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at north located at apt 7, 2nd story, 2nd apartment from west at north
Sep 18, 2026 · Apt 7
Open — Nov sent out - BHazardous
Abate the nuisance consisting of pests. evidence of flies in the entire apartment located at apt 7, 2nd story, 2nd apartment from west at north
Sep 18, 2026 · Apt 7
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, north wall in the bathroom located at apt 7, 2nd story, 2nd apartment from west at north
Sep 18, 2026 · Apt 7
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 2nd room from north located at apt 24, 5th story, 1st apartment from east at south
Aug 22, 2026 · Apt 24
Open — Civ14 mailed - BHazardous
Repair the roof so that it will not leak at ceiling in the 2nd room from north located at apt 24, 5th story, 1st apartment from east at south
Aug 22, 2026 · Apt 24
Open — Civ14 mailed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at east wall and ceilung less than 10sq.ft in the bathroom located at apt 24, 5th story, 1st apartment from east at south
Aug 22, 2026 · Apt 24
Open — Notice of issuance sent to tenant - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Aug 22, 2026
Open — Nov certified on time - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the .. at public hall
Aug 22, 2026
Open — Nov certified on time - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the yard 1st yard from east
Jul 29, 2026
Closed — Violation closed - BHazardous
Abate the nuisance consisting of pests. evidence of flies at public hall, 1st story
Jul 29, 2026
Closed — Violation closed - BHazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods ,, at 1st fire escape from east at south
Jul 29, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective door at east 1 closet in the 1st room from north located at apt 8, 2nd story, 1st apartment from north at east
Jul 29, 2026 · Apt 8
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective entrance door in the 1st room from north located at apt 8, 2nd story, 1st apartment from north at east
Jul 29, 2026 · Apt 8
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood subfloor ( near radiator) in the 1st room from north located at apt 8, 2nd story, 1st apartment from north at east
Jul 29, 2026 · Apt 8
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective lower sash spring balance at east 1 window in the 2nd room from north located at apt 8, 2nd story, 1st apartment from north at east
Jul 29, 2026 · Apt 8
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective sash lock at east 1 window ( fire escape window) in the 5th room from north located at apt 8, 2nd story, 1st apartment from north at east
Jul 29, 2026 · Apt 8
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective sash lock at east window ( fire escape window) in the kitchen located at apt 8, 2nd story, 1st apartment from north at east
Jul 29, 2026 · Apt 8
Open — Not complied with - BHazardous
Replace with new the missing doors at wall cabinet at north wall in the kitchen located at apt 8, 2nd story, 1st apartment from north at east
Jul 29, 2026 · Apt 8
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the kitchen located at apt 8, 2nd story, 1st apartment from north at east
Jul 29, 2026 · Apt 8
Closed — Violation closed - BHazardous
Abate the nuisance consisting of pests. evidence of flies in the entire apartment located at apt 8, 2nd story, 1st apartment from north at east
Jul 29, 2026 · Apt 8
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 8, 2nd story, 1st apartment from north at east
Jul 29, 2026 · Apt 8
Open — Not complied with - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at , in the entire apartment located at apt 8, 2nd story, 1st apartment from north at east
Jul 29, 2026 · Apt 8
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch and its assemblies at building entrance door (street to vestibule)
Jul 23, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door (street to vesibutle)
Jul 23, 2026
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt 18, 4th story, 1st apartment from north at east
Jul 15, 2026 · Apt 18
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 18, 4th story, 1st apartment from north at east
Jul 15, 2026 · Apt 18
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall in the private hallway located at apt 18, 4th story, 1st apartment from north at east
Jul 15, 2026 · Apt 18
Open — Civ14 mailed - ANon-hazardous
Properly repair or replace the broken or defective inoperable intercom system from the building front door to intercom panel at east wall in the foyer located at apt apt23, 5th story, 1st apartment from north at east
Jul 7, 2026 · Apt APT23
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 18, 4th story, 1st apartment from north at east
Jul 7, 2026 · Apt 18
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 18, 4th story, 1st apartment from north at east
Jul 7, 2026 · Apt 18
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north located at apt apt23, 5th story, 1st apartment from north at east
Jul 7, 2026 · Apt APT23
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish glaze at bathtub in the bathroom located at apt apt23, 5th story, 1st apartment from north at east
Jul 7, 2026 · Apt APT23
Open — Civ14 mailed - BHazardous
Remove all obstructions and repair all defects in waste line at bathtub in the bathroom located at apt apt23, 5th story, 1st apartment from north at east
Jul 7, 2026 · Apt APT23
Open — Civ14 mailed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ,,,, in the bathroom located at apt apt23, 5th story, 1st apartment from north at east
Jul 7, 2026 · Apt APT23
Open — Civ14 mailed - CImmediately hazardous
Remove all obstructions from water closet in the bathroom located at apt apt23, 5th story, 1st apartment from north at east
Jul 7, 2026 · Apt APT23
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 22, 5th story, 2nd apartment from west at north
Jun 30, 2026 · Apt 22
Closed — Violation closed
DOB building violations · 6
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed
ECB violations · 1
- Class - 2
Observed at exposure#2, 3 and 4 stucco peeling of bricks, step cracks in various locations and paint peeling., repair and/or replace; make repairs
Jun 27, 2025
Resolve
Complaints
- Electric
Lighting
Oct 14, 2026 · Apt 2
Open - Water leak
Damp spot
Oct 14, 2026 · Apt 2
Open - Electric
Lighting
Oct 14, 2026 · Apt 2
Open - Electric
Lighting
Oct 14, 2026 · Apt 2
Open - Unsanitary condition
Mold
Oct 14, 2026 · Apt 2
Open - Electric
Lighting
Oct 14, 2026 · Apt 2
Open - Door/window
Door
Sep 28, 2026 · Apt 18
Close - General
Bell/buzzer/intercom
Sep 28, 2026 · Apt 18
Close - Flooring/stairs
Floor
Sep 28, 2026 · Apt 18
Close - General
Mailbox
Sep 28, 2026 · Apt 18
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Sep 18, 2026 · Apt 7
Close - Water leak
Slow leak
Sep 18, 2026 · Apt 7
Close - Paint/plaster
Wall
Sep 18, 2026 · Apt 7
Close - Paint/plaster
Wall
Sep 18, 2026 · Apt 7
Close - Unsanitary condition
Mold
Sep 18, 2026 · Apt 7
Close - Unsanitary condition
Pests
Sep 18, 2026 · Apt 7
Close - Unsanitary condition
Pests
Sep 18, 2026 · Apt 7
Close - Unsanitary condition
Mold
Sep 8, 2026 · Apt 3
Close - Paint/plaster
Ceiling
Aug 20, 2026 · Apt 24
Close - Water leak
Heavy flow
Aug 20, 2026 · Apt 24
Close - Unsanitary condition
Mold
Aug 20, 2026 · Apt 24
Close - General
Cabinet
Aug 17, 2026 · Apt 13
Close - Water leak
Heavy flow
Aug 17, 2026 · Apt 13
Close - Unsanitary condition
Garbage/recycling storage
Jul 30, 2026 · Apt 23
Close - Unsanitary condition
Garbage/recycling storage
Jul 30, 2026 · Apt 23
Close - General
Bell/buzzer/intercom
Jul 30, 2026 · Apt 23
Close - Unsanitary condition
Pests
Jul 30, 2026 · Apt 23
Close - Unsanitary condition
Pests
Jul 16, 2026 · Apt 8
Close - Unsanitary condition
Pests
Jul 16, 2026 · Apt 8
Close - Unsanitary condition
Pests
Jul 16, 2026 · Apt 8
Close - Water leak
Heavy flow
Jul 12, 2026 · Apt 18
Close - Plumbing
Steam pipe/riser
Jul 12, 2026 · Apt 18
Close - Water leak
Slow leak
Jul 2, 2026 · Apt 18
Close - Plumbing
Toilet
Jun 29, 2026 · Apt APT23
Close - Plumbing
Toilet
Jun 29, 2026 · Apt APT23
Close - Heat/hot water
Entire building
Jun 8, 2026 · Apt BLDG
Close - Water leak
Heavy flow
May 15, 2026 · Apt 18
Close - Water leak
Slow leak
May 15, 2026 · Apt 18
Close - Unsanitary condition
Mold
May 15, 2026 · Apt 18
Close - Paint/plaster
Ceiling
Apr 29, 2026 · Apt 25
Close - Appliance
Electric/gas range
Apr 29, 2026 · Apt 25
Close - Plumbing
Water supply
Apr 29, 2026 · Apt 25
Close - Paint/plaster
Ceiling
Apr 29, 2026 · Apt 25
Close - Plumbing
Water supply
Apr 29, 2026 · Apt 25
Close - Paint/plaster
Ceiling
Apr 29, 2026 · Apt 25
Close - Unsanitary condition
Pests
Apr 29, 2026 · Apt 25
Close - Outside building
Roofing
Apr 29, 2026 · Apt 25
Close - General
Cooking gas
Mar 31, 2026 · Apt 24
Close - Water leak
Slow leak
Mar 29, 2026 · Apt 25
Close - Appliance
Electric/gas range
Mar 29, 2026 · Apt 25
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1914
- Floors
- 5
- Residential units
- 26
- Building area
- 17,320 ft²
- Lot area
- 5,000 ft²
- Zoning
- R7-2
- Community board
- 203
- Council district
- 17
- Block / lot
- 2407 / 29
- Assessed value
- $797,850
- Landmark / historic district
- No
HPD registration #200320, last renewed Mar 27, 2026.
Questions about 381 East 160 Street
Who owns 381 East 160 Street?
The owner of record in NYC Department of City Planning PLUTO data is 381 East 160th LLC.
Does 381 East 160 Street have violations?
Yes. NYC HPD has recorded 666 housing violations at this property.
Is 381 East 160 Street rent stabilized?
NYC Department of Finance tax bills listed 25 rent-stabilized units here in 2024 (about 96% of its 26 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 381 East 160 Street built?
City records list 1914 as the year it was built.
How many apartments are in 381 East 160 Street?
It has 26 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.