286 East 149 Street
Bronx, NY 10451BBL 2-02330-0014Map
Owner of record: 286 E 149th St Realty Corp
286 East 149 Street is a walk-up apartment building built in 1905 in Bronx, 10451. It has 12 residential units across 5 floors. The owner of record is 286 E 149th St Realty Corp. HPD has recorded 245 housing violations here, most recently on June 17, 2026. 9 of the 50 most recent violations are still open. City tax records listed 12 rent-stabilized apartments here in 2024.
- HPD violations
- 245
- DOB violations
- 22
- ECB violations
- 24
- HPD complaints
- 236
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 245
- ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing , 1st story
Jun 17, 2026
Open — Invalid certification - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 6, 3rd story, 1st apartment from east at south
Jun 17, 2026 · Apt 6
Closed — Violation dismissed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 6, 3rd story, 1st apartment from east at south
Jun 17, 2026 · Apt 6
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6, 3rd story, 1st apartment from east at south
Jun 17, 2026 · Apt 6
Open — Not complied with - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 6, 3rd story, 1st apartment from east at south
Jun 17, 2026 · Apt 6
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door to west yard at public hall, 1st story
May 20, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch and its assemblies at bulkhead door at 1st public hall bulkhead from north, 5th story
May 1, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at bulkhead door at 1st public hall bulkhead from north, 5th story
May 1, 2026
Open — False certification - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at bulkhead door at 1st public hall bulkhead from north, 5th story
May 1, 2026
Open — False certification - BHazardous
Provide unlockable slide bolt or hook installed on door that allows re-entry from roof to public hall at 1st public hall bulkhead from north, 5th story
May 1, 2026
Closed — Violation closed
Show 40 more ↓
- CImmediately hazardous
M/d law abate the nuisance consisting of a wooden deck erected at building rear obstructing 2nd means of egress for building #288 and 286 ( per section of law 1rcny §15-10(n) , 1st story
Jan 8, 2026
Closed — Violation closed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wood deck erected approx 12'l x 8'd x 6'h at 1st story level at building rear. , 1st story
Jan 8, 2026
Closed — Violation dismissed - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at at all yards
Jan 3, 2026
Open — Not complied with - BHazardous
Make safe by properly repairing the structural defect vertical cracks in brick and mortar at south exterior wall (rear of bldg) extending from 1st to 2nd stories
Jan 3, 2026
Closed — Violation dismissed - BHazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at rear of building at fire escape, 1st story
Jan 3, 2026
Closed — Violation dismissed - CImmediately hazardous
Fire escape defective. properly secure 15th tread up from bottom at rear of building at fire escape, 1st story
Jan 3, 2026
Closed — Violation closed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing 3rd tread up from bottom at rear of building at fire escape, 1st story
Jan 3, 2026
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 5, 2025
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective lower sash spring balance at the 1st window from south at west wall in the 2nd room from north located at apt 9, 4th story, 1st apartment from south at west
Dec 11, 2024 · Apt 9
Open — Not complied with - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 9, 4th story, 1st apartment from south at west
Dec 11, 2024 · Apt 9
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Dec 11, 2024
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the bathroom located at apt 9, 4th story, 1st apartment from south at west
Dec 11, 2024 · Apt 9
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective marble threads 2nd and 4th from bottom up , 1st story
Aug 30, 2024
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items, rug , paint buckets black garbage bags at bulkhead , 5th story
Aug 30, 2024
Closed — Violation closed - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at ceiling light fixture at public hall, 5th story
Jul 11, 2024
Closed — Violation closed - BHazardous
Provide approved type mesh under skylight at 1st public hall bulkhead from north, 5th story
Jul 11, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective exit door leading to west yard at public hall, 1st story
Jul 2, 2024
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Jul 2, 2024 · Apt 2
Open — Not complied with - CImmediately hazardous
Provide ready access to buildings heating system locked door. at boiler room
Jul 2, 2024
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective door knob at vestibule door at public hall, 1st story
Jul 2, 2024
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Jul 2, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective at suffit beneath 5th story public staircase at public hall stairs
Jun 28, 2024
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked room at boiler room
Jun 28, 2024
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 2nd story, 1st apartment from east at south
Jun 28, 2024 · Apt 1
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective threads pulling away from stringer at 5th story at public hall stairs
Jun 28, 2024
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at lower window sash in the 1st room from north at west located at apt 4, 3rd story, 1st apartment from east at south
Jun 28, 2024 · Apt 4
Open — Not complied with - BHazardous
Properly secure the loose door knob at door from vestibule to 1st story at public hall
Jun 28, 2024
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of rodents (rats) at south court yard of building
Jun 24, 2024
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of vermin (waterbugs) at public hall, 1st story
Jun 24, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door leading from (lobby) to the south court yard of building at public hall, 1st story
Jun 24, 2024
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Jun 24, 2024 · Apt 1
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective locking device at 2nd door leading from street (building vestibule door) at public hall, 1st story
Jun 24, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system (door locked) at boiler room
Jun 24, 2024
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room, 1st story
Jun 21, 2024
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Jun 21, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Jun 21, 2024 · Apt 2
Open — Not complied with - CImmediately hazardous
Properly repair or replace the broken or defective locking device at building vestibule door at public hall, 1st story
Jun 20, 2024
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 5th story
Jun 20, 2024
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 5th story
Jun 20, 2024
Closed — Violation dismissed
DOB building violations · 22
- Immediate emergency anythingoptional
Immediately remove the entire wood deck at exposure#3
Jan 8, 2026
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 28, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 7, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 28, 2016
Dob violation - dismissed
Show 12 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Electric signs none
Es-electric signs none
Oct 5, 1993
Dob violation - active - Electric signs none
Es-electric signs none
Oct 5, 1993
Dob violation - active - Electric signs none
Es-electric signs none
Oct 5, 1993
Dob violation - active
ECB violations · 24
- Class - 1
W/o a permit. noted: at exposure 3/rear yard - wood deck erected apprx. 12'x8'x6' with wood posts & railings (apprx a 4' section of railing missing): attached to bldg in an unsafe manner., obtain permit; immedi
Jan 8, 2026
Resolve - Class - 1
Failure to maintain building wall(s) or appurtenances. noted: at exposure 3 - fire escape steps between 2nd & 1st flrs observed with 1 missing tread & 2 treads loose & hanging; forks of drop ladder not attached
Jan 8, 2026 · Penalty $5,000
Active - Class - 2
At time of inspection observed missing/spalling mortar joints at multiple locations exp1 and 4 (right side of building) along with vertical and horizontal cracks at 2nd sty level, right side of exp.1 (front of
Jan 4, 2026 · Penalty $1,250
Active - Class - 2
Failure to comply with commissioner's order contained in summons#39056628l issued on 2/23/2022,and failure to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2).an acceptable certifica
Aug 26, 2024 · Penalty $1,250
Resolve - Class - 2
Exposed oil lines, draft stat need to be changed, need air gap and drain for backflow, holes in ceiling and walls. need to clean out chimney base, service oil burner ý lot of soot in boiler room.
Feb 23, 2022 · Penalty $625
Active - Class - 2
Work w/o permit. at time of inspection found:at expose 2 installed advertising sign/banner approx 20'x'25' which advertise "burns and harris" law firm. no permit and/or filing found on dob record for work which
Nov 6, 2019
Resolve - Class - 2
Zr 32-63 advertising signs not permitted in c4 district. at time of inspection found advertising sign approx 20'x25'. "burns and harris". note:no law firm located in this building. remedy:comply to zoning resol
Nov 6, 2019 · Penalty $1,250
Active - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35333292y issued on 08-28-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Oct 10, 2018 · Penalty $1,250
Resolve - Class - 2
Work w/o permit. note at time of inspection i observed sidewalk shed in place without a valid permit. rmdy: comply with code obtain permit.
Sep 13, 2018 · Penalty $500
Resolve - Class - 2
Failure to provide information panel. note at time of inspection i observed sidewalk shed in place w/o information panel on parapet. rmdy: comply with code provide information panel.
Sep 13, 2018 · Penalty $625
Resolve
Show 14 more ↓
- Class - 1
Failure to maintain building walls or appurtenances. noted: at time ofinspection observed at window sill at 5th flr loose deteriorating bricks that have fallen to sidewalk below. cornice has holes throughout at
Aug 28, 2018 · Penalty $2,500
Active - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35296780n issued on 12/24/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to maintain exterior bldg walls or appurtenances @ rear
Apr 13, 2018 · Penalty $6,250
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35296780h issued on 12/14/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.rem:comply with commissi
Mar 1, 2018 · Penalty $4,000
Resolve - Class - 1
Failure to maintain exterior bldg walls or appurtenances at exp#2/3 a metal chimney in rear courtyard that was from cellar to roof,thats properly attached to bldg,numerous straps are broken. remedy: maintain
Dec 14, 2017 · Penalty $10,000
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/vio # 35212720k issued on 10/07/16 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. @ rear yard letal chimney runs from cellar to roof
Oct 28, 2017 · Penalty $4,000
Resolve - Class - 2
Failure to comply w/the comm's order contained in sum/vio#35212720k issued on 10/07/16 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. note: no document file for failure to maintain bldg in code complia
Sep 16, 2017 · Penalty $4,000
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35212720f issued on 10/07/16 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for failure to maintain
Jul 18, 2017 · Penalty $8,000
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio #35212720k issued on 10/07/16 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01.rem:comply w/comm's order &/or file a cert of corre
May 27, 2017 · Penalty $4,000
Resolve - Class - 2
Failure to comply w/ the commissioner's order contained in summons/violation# 35212720k issued on 10/7/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. no c of c on file. rem: comply w/ commissioner's
Mar 31, 2017 · Penalty $4,000
Resolve - Class - 2
Failure to comply w/the comm's order contain in summons/vio#35212720k issued on 10-7-16 & to file a c of c pursuant to 28-201.1;28-204.4 & 1rcny 102-01. failure to maintain exterior bldg wall or appurtenances;
Feb 15, 2017 · Penalty $2,000
Resolve - Class - 2
Failure to comply w/the comm's order contained in nov #35212720k issued on 10/07/16 & to file a c of c pursuant to 28-201.1;28-204.4 & 1rcny102-01. for failure to maintain,at rear ciurt yard metal chimney not
Jan 4, 2017 · Penalty $4,000
Resolve - Class - 2
Failure to comply w/the comm's order contained in nov #35212720k issued on 10/07/16 & to file a c of c pursuant to 28-201.1;28-204.4 & 1rcny102-01. note: no document filed for failure to maintain exterior bldg
Dec 4, 2016 · Penalty $4,000
Resolve - Class - 1
Failure to maintain exterior bldg wall or appurtenances in that there is a metal chimney in rear court yard that runs from cellar to roof that is not properly attached to bldg,numerous straps are broken,chimney
Oct 7, 2016 · Penalty $5,000
Resolve - Class - 2
Failure to maintain bldg wall(s) or appurtenances. deteriorating cornice at front of bldg between the 4th and the 5th flr. west side of the of the front facade. remedy: maintain bldg: make all necessary repairs
Nov 17, 2010 · Penalty $2,500
Resolve
Complaints
- Heat/hot water
Entire building
Oct 14, 2026 · Apt BLDG
Close - General
Cabinet
Jun 24, 2026 · Apt 6
Open - Plumbing
Toilet
Jun 24, 2026 · Apt 6
Open - Unsanitary condition
Pests
Jun 24, 2026 · Apt 6
Open - Plumbing
Toilet
Mar 30, 2026 · Apt 6
Close - Heat/hot water
Apartment only
Nov 17, 2025 · Apt 2
Close - Heat/hot water
Entire building
Nov 17, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 12, 2025 · Apt 2
Close - Heat/hot water
Entire building
Dec 14, 2024 · Apt BLDG
Close - General
Bell/buzzer/intercom
Dec 10, 2024 · Apt 9
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Dec 10, 2024 · Apt 9
Close - Door/window
Window frame
Dec 10, 2024 · Apt 9
Close - Electric
Wiring
Dec 10, 2024 · Apt 9
Close - Heat/hot water
Entire building
Jul 12, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 2, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 1, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 30, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 29, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 28, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 27, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 23, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 19, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Jun 19, 2024 · Apt 2
Close - Heat/hot water
Entire building
Jun 17, 2024 · Apt BLDG
Close - Unsanitary condition
Mold
Jun 15, 2024 · Apt 9
Close - Heat/hot water
Entire building
Jun 15, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
May 11, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 29, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 22, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 15, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 10, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 9, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 5, 2024 · Apt 9
Close - Heat/hot water
Entire building
Mar 30, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 17, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 16, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 14, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 7, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 7, 2024 · Apt 9
Close - Heat/hot water
Entire building
Feb 27, 2024 · Apt 9
Close - Heat/hot water
Entire building
Feb 22, 2024 · Apt 9
Close - Heat/hot water
Entire building
Feb 22, 2024 · Apt BLDG
Close - General
Bell/buzzer/intercom
Feb 22, 2024 · Apt 9
Close - Heat/hot water
Entire building
Feb 20, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Feb 15, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 15, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 12, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 5, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 5, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 29, 2024 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1905
- Floors
- 5
- Residential units
- 12
- Building area
- 7,980 ft²
- Lot area
- 2,163 ft²
- Zoning
- C4-4
- Community board
- 201
- Council district
- 17
- Block / lot
- 2330 / 14
- Assessed value
- $431,100
- Landmark / historic district
- No
HPD registration #220562, last renewed Dec 1, 2025.
Questions about 286 East 149 Street
Who owns 286 East 149 Street?
The owner of record in NYC Department of City Planning PLUTO data is 286 E 149th St Realty Corp.
Does 286 East 149 Street have violations?
Yes. NYC HPD has recorded 245 housing violations at this property.
Is 286 East 149 Street rent stabilized?
NYC Department of Finance tax bills listed 12 rent-stabilized units here in 2024 (about 100% of its 12 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 286 East 149 Street built?
City records list 1905 as the year it was built.
How many apartments are in 286 East 149 Street?
It has 12 residential units and 13 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.