535 East 148 Street
Bronx, NY 10455BBL 2-02275-0035Map
Owner of record: 535 East 148, LLC
535 East 148 Street is a walk-up apartment building built in 1918 in Bronx, 10455. It has 17 residential units across 5 floors. The owner of record is 535 East 148, LLC. HPD has recorded 736 housing violations here, most recently on October 2, 2026. 24 of the 50 most recent violations are still open. City tax records listed 16 rent-stabilized apartments here in 2024.
- HPD violations
- 736
- DOB violations
- 1
- ECB violations
- 1
- HPD complaints
- 497
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 736
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north, the kitchen , the bathroom , the private hallway , the foyer located at apt b, 1st story, 1st apartment from north at east
Oct 2, 2026 · Apt B
Open — Nov sent out - CImmediately hazardous
Remove all obstructions and repair all defects in drain line at bathtub in the bathroom located at apt b, 1st story, 1st apartment from north at east
Oct 2, 2026 · Apt B
Open — Violation will be reinspected - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, south wall in the 1st room from north at east located at apt c, 1st story, 3rd apartment from south at west
Sep 7, 2026 · Apt C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, 1st window frame from west at north wall in the 1st room from north at west located at apt c, 1st story, 3rd apartment from south at west
Sep 7, 2026 · Apt C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the bathroom located at apt c, 1st story, 3rd apartment from south at west
Sep 7, 2026 · Apt C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective dry rotted wood cabinet base at sink in the kitchen located at apt c, 1st story, 3rd apartment from south at west
Sep 7, 2026 · Apt C
Open — Violation will be reinspected - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt c, 1st story, 3rd apartment from south at west
Sep 7, 2026 · Apt C
Open — Violation will be reinspected - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt c, 1st story, 3rd apartment from south at west
Sep 7, 2026 · Apt C
Open — Violation will be reinspected - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt c, 1st story, 3rd apartment from south at west
Sep 7, 2026 · Apt C
Open — Violation will be reinspected - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt c, 1st story, 3rd apartment from south at west
Sep 7, 2026 · Apt C
Open — Violation will be reinspected
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective cracked lifting ceramic tile floor in the bathroom located at apt c, 1st story, 3rd apartment from south at west
Sep 7, 2026 · Apt C
Open — Violation will be reinspected - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt c, 1st story, 3rd apartment from south at west
Sep 7, 2026 · Apt C
Open — Violation will be reinspected - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall in the 1st room from north at east located at apt c, 1st story, 3rd apartment from south at west
Sep 7, 2026 · Apt C
Open — Violation will be reinspected - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall, 2nd window frame from west at north wall in the 1st room from north at west located at apt c, 1st story, 3rd apartment from south at west
Sep 7, 2026 · Apt C
Open — Violation will be reinspected - BHazardous
Properly repair with similar material the broken or defective eroded mortar joints around bricks at south exterior wall , 5th story
Jul 27, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door at vestibule at public hall, 1st story
Jul 27, 2026
Closed — Violation closed - BHazardous
Provide glass at door leading to east yard at public hall, 1st story
Jul 15, 2026
Open — False certification - BHazardous
M/d law abate the nuisance consisting of plexiglass installed at door to east yard that is creating a fire hazard at public hall, 1st story
Jul 15, 2026
Open — False certification - BHazardous
Provide glass at door [ vestibule to public hall] , 1st story
Jul 15, 2026
Open — False certification - BHazardous
M/d law abate the nuisance consisting of plexiglass installed at door [vestibule to public hall] that is creating a fire hazard , 1st story
Jul 15, 2026
Open — False certification - BHazardous
Properly secure the loose 3rd tread up from bottom at exterior stairs leading to basement
Jul 15, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set and it's assembly at vestibule door at public hall, 1st story
Jul 1, 2026
Open — False certification - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jul 1, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule door at public hall, 1st story
Jul 1, 2026
Open — Not complied with - BHazardous
Provide glass in place of plexiglass installed at upper pane at vestibule door at public hall, 1st story
May 28, 2026
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of plexiglass installed at upper pane at vestibule door at public hall, 1st story
May 28, 2026
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch and its assemblies at vestibule door at public hall, 1st story
May 28, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at vestibule door at public hall, 1st story
May 28, 2026
Open — False certification - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2a, 3rd story, 2nd apartment from south at west
Apr 21, 2026 · Apt 2A
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection at wash basin in the bathroom located at apt 2a, 3rd story, 2nd apartment from south at west
Apr 21, 2026 · Apt 2A
Closed — Violation dismissed - BHazardous
Replace the broken or defective shower body at bathtub in the bathroom located at apt 2a, 3rd story, 2nd apartment from south at west
Apr 21, 2026 · Apt 2A
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 2a, 3rd story, 2nd apartment from south at west
Apr 21, 2026 · Apt 2A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective grout of the tiles on south wall tiles in the bathroom located at apt 2a, 3rd story, 2nd apartment from south at west
Apr 21, 2026 · Apt 2A
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is defective in the entire apartment located at apt 2a, 3rd story, 2nd apartment from south at west
Apr 21, 2026 · Apt 2A
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is defective in the entire apartment located at apt 2a, 3rd story, 2nd apartment from south at west
Apr 21, 2026 · Apt 2A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt fb, 1st apartment from south at west
Apr 14, 2026 · Apt FB
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt fb, 1st apartment from south at west
Apr 14, 2026 · Apt FB
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the bathroom located at bsmt-apt fb, 1st bsmt-apt from south at west
Apr 14, 2026 · Apt FB
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective ceiling light fixture in the bathroom located at bsmt-apt fb, 1st bsmt-apt from south at west
Apr 14, 2026 · Apt FB
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrnance door , 1st story
Feb 27, 2026
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall intermediate landing at public hall, 2nd story
Feb 27, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at east wall intermediate landing at public hall, 2nd story
Feb 27, 2026
Closed — Violation closed - BHazardous
Provide approved wire mesh under skylight at 1st public hall bulkhead from north, 5th story
Feb 27, 2026
Closed — Violation closed - BHazardous
Provide miissng (outlet) cover at south wall in the 7th room from north at east located at bsmt-apt ff, 1st bsmt-apt from south at west
Dec 29, 2025 · Apt FF
Closed — Violation closed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Dec 29, 2025
Open — Not complied with - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak active dripping at ceiling in the 1st bathroom from north located at bsmt-apt ff, 1st bsmt-apt from south at west
Dec 29, 2025 · Apt FF
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at bsmt-apt ff, 1st bsmt-apt from south at west
Dec 29, 2025 · Apt FF
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at bsmt-apt ff, 1st bsmt-apt from south at west
Dec 29, 2025 · Apt FF
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at rats in the entire apartment located at bsmt-apt fb, 1st bsmt-apt from east at south
Dec 9, 2025 · Apt FB
Closed — Violation closed
DOB building violations · 1
- Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed
ECB violations · 1
- Class - 3
Failure to maintain, observed window a/c unit on the fifth floor is missing support bracket. observed window a/c units on floors 3 and 4 are installed in fire escape window, repair and or replace; replace/repai
Oct 6, 2023 · Penalty $250
Active
Complaints
- Plumbing
Bathtub/shower
Oct 2, 2026 · Apt B
Close - Plumbing
Steam pipe/riser
Oct 2, 2026 · Apt B
Close - Paint/plaster
Wall
Sep 24, 2026 · Apt C
Open - Paint/plaster
Door/frame
Sep 24, 2026 · Apt C
Open - Flooring/stairs
Floor
Sep 24, 2026 · Apt C
Open - Unsanitary condition
Garbage/recycling storage
Sep 10, 2026 · Apt BLDG
Close - Plumbing
Bathtub/shower
Aug 29, 2026 · Apt C
Close - Flooring/stairs
Floor
Aug 29, 2026 · Apt C
Close - Unsanitary condition
Pests
Aug 29, 2026 · Apt C
Close - Unsanitary condition
Pests
Aug 29, 2026 · Apt C
Close
Show 40 more ↓
- Unsanitary condition
Mold
Aug 29, 2026 · Apt C
Close - Appliance
Refrigerator
Jun 26, 2026 · Apt BASEME
Close - Electric
Outlet/switch
Jun 26, 2026 · Apt BASEME
Close - Appliance
Refrigerator
Jun 22, 2026 · Apt FB
Close - Appliance
Electric/gas range
Mar 14, 2026 · Apt 2B
Close - Appliance
Electric/gas range
Mar 14, 2026 · Apt 2B
Close - Plumbing
Toilet
Jan 14, 2026 · Apt B
Close - Plumbing
Toilet
Jan 14, 2026 · Apt B
Close - Plumbing
Water supply
Jan 7, 2026 · Apt BLDG
Close - Plumbing
Water supply
Jan 7, 2026 · Apt 2A
Close - Unsanitary condition
Garbage/recycling storage
Dec 19, 2025 · Apt FB
Close - Paint/plaster
Ceiling
Dec 7, 2025 · Apt FB
Close - Water leak
Heavy flow
Dec 7, 2025 · Apt FB
Close - Heat/hot water
Entire building
Nov 28, 2025 · Apt 3C
Close - Flooring/stairs
Floor
Oct 21, 2025 · Apt FB
Close - Unsanitary condition
Garbage/recycling storage
Oct 21, 2025 · Apt FB
Close - Plumbing
Toilet
Oct 21, 2025 · Apt FB
Close - Paint/plaster
Wall
Oct 21, 2025 · Apt FB
Close - Unsanitary condition
Pests
Oct 21, 2025 · Apt FB
Close - Unsanitary condition
Pests
Sep 29, 2025 · Apt A
Close - Water leak
Slow leak
Sep 29, 2025 · Apt A
Close - Unsanitary condition
Pests
Sep 29, 2025 · Apt A
Close - Unsanitary condition
Mold
Sep 29, 2025 · Apt A
Close - Unsanitary condition
Mold
Jun 22, 2025 · Apt 1A
Close - Water leak
Slow leak
Jun 22, 2025 · Apt 1A
Close - Water leak
Slow leak
Apr 28, 2025 · Apt FB
Close - Door/window
Door
Apr 28, 2025 · Apt FB
Close - Door/window
Window frame
Apr 28, 2025 · Apt FB
Close - Unsanitary condition
Pests
Apr 28, 2025 · Apt FB
Close - Heat/hot water
Entire building
Nov 4, 2024 · Apt 3C
Close - Heat/hot water
Entire building
Oct 16, 2024 · Apt BLDG
Close - Unsanitary condition
Mold
Oct 9, 2024 · Apt 3B
Close - Electric
Outlet/switch
Oct 9, 2024 · Apt 3B
Close - Electric
Outlet/switch
Oct 9, 2024 · Apt 3B
Close - Electric
No lighting
Oct 9, 2024 · Apt 3B
Close - Door/window
Window frame
Oct 9, 2024 · Apt 3B
Close - Safety
Fire escape
Sep 23, 2024 · Apt FB
Close - Paint/plaster
Ceiling
Aug 22, 2024 · Apt 1C
Close - Unsanitary condition
Mold
Jul 31, 2024 · Apt 4B
Close - Water leak
Heavy flow
Jul 31, 2024 · Apt 4B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1918
- Floors
- 5
- Residential units
- 17
- Building area
- 11,345 ft²
- Lot area
- 3,130 ft²
- Zoning
- R6
- Community board
- 201
- Council district
- 17
- Block / lot
- 2275 / 35
- Assessed value
- $340,650
- Landmark / historic district
- No
HPD registration #203654, last renewed Jul 14, 2025.
Questions about 535 East 148 Street
Who owns 535 East 148 Street?
The owner of record in NYC Department of City Planning PLUTO data is 535 East 148, LLC.
Does 535 East 148 Street have violations?
Yes. NYC HPD has recorded 736 housing violations at this property.
Is 535 East 148 Street rent stabilized?
NYC Department of Finance tax bills listed 16 rent-stabilized units here in 2024 (about 94% of its 17 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 535 East 148 Street built?
City records list 1918 as the year it was built.
How many apartments are in 535 East 148 Street?
It has 17 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.