4925 Broadway
Manhattan, NY 10034BBL 1-02241-0024Map
Owner of record: Mn Urban 207 LLC
4925 Broadway is a walk-up apartment building built in 1925 in Manhattan, 10034. It has 49 residential units across 5 floors. The owner of record is Mn Urban 207 LLC. HPD has recorded 391 housing violations here, most recently on July 15, 2026. 8 of the 50 most recent violations are still open. City tax records listed 9 rent-stabilized apartments here in 2024.
- HPD violations
- 391
- DOB violations
- 25
- ECB violations
- 28
- HPD complaints
- 1,727
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 391
- BHazardous
Properly repair or replace the broken or defective latch set and assemblies to builinding entrance door at public hall, 1st story
Jul 15, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latrch to building entrance door at public hall, 1st story
Jul 15, 2026
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective bell buzzer intercom system from the building entrance door to south wall in the foyer located at apt 2g, 2nd story, 1st apartment from south at west
Jun 10, 2026 · Apt 2G
Open — First no access to re- inspect violation - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set
May 28, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective marble thread 3rd from bottom up at staircase b at public hall, 1st story
May 13, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 1st story
May 13, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective bell buzzer and intercom return system at building front to panel at south wall in the foyer located at apt 2g, 2nd story, 1st apartment from south at west , section ''south''
May 13, 2026 · Apt 2G
Open — First no access to re- inspect violation - ANon-hazardous
Properly repair or replace the broken or defective light fixture at ceiling in the foyer located at apt 2g, 2nd story, 1st apartment from south at west , section ''south''
May 13, 2026 · Apt 2G
Open — Nov certified late - BHazardous
Properly secure the loose sink at counter top in the kitchen located at apt 2g, 2nd story, 1st apartment from south at west , section ''south''
May 13, 2026 · Apt 2G
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door in the entrance located at apt 2g, 2nd story, 1st apartment from south at west , section ''south''
May 13, 2026 · Apt 2G
Closed — Violation closed
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the kitchen located at apt 2a, 2nd story, 2nd apartment from north at east
May 11, 2026 · Apt 2A
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective bell buzzer intercom system from the building entrance door to east wall in the kitchen located at apt 2a, 2nd story, 2nd apartment from north at east
May 11, 2026 · Apt 2A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the bathroom located at apt 4i, 4th story, 1st apartment from west at north , section at south
Apr 3, 2026 · Apt 4I
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at north, the private hallway , the 1st room from east at south, the bathroom , the kitchen located at apt 4e, 4th story, 1st apartment from west at north , section at north
Apr 3, 2026 · Apt 4E
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10sq feet at ceiling, east and south walls in the bathroom located at apt 4i, 4th story, 1st apartment from west at north , section at south original violation 18756564 issued 27-mar-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Mar 27, 2026 · Apt 4I
Open — Notice of issuance sent to tenant - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq feet at ceiling, east and south walls in the bathroom located at apt 4i, 4th story, 1st apartment from west at north , section at south
Mar 27, 2026 · Apt 4I
Closed — Violation closed - BHazardous
Repair the broken or defective connection at waste line at wash basin in the bathroom located at apt 4i, 4th story, 1st apartment from west at north , section at south
Mar 27, 2026 · Apt 4I
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5g, 5th story, 1st apartment from south at west , section at south
Mar 27, 2026 · Apt 5G
Open — First no access to re- inspect violation - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at roof bulkhead door at 1st public hall stairs from east at south, 5th story, section at south
Mar 27, 2026
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the kitchen located at apt 3j, 3rd story, 1st apartment from north at east , section at south
Mar 27, 2026 · Apt 3J
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the kitchen located at apt 3j, 3rd story, 1st apartment from north at east , section at south
Mar 27, 2026 · Apt 3J
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... les than 10sq feet at ceiling in the bathroom located at apt 3j, 3rd story, 1st apartment from north at east , section at south
Mar 27, 2026 · Apt 3J
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq feet at ceiling in the bathroom located at apt 1c, 1st story, 3rd apartment from south at west
Mar 27, 2026 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing metal tread, 11th and 12th up from bottom at 2nd story balcony at 1st stack from north at east at fire escape
Mar 27, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at roof bulkhead door at 1st public hall stairs from north, 5th story, section at north
Mar 27, 2026
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Mar 3, 2026
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and north wall at public hall, 1st story
Mar 3, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at north wall at public hall, 1st story
Mar 3, 2026
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 2g, 2nd story, 1st apartment from south at west
Feb 13, 2026 · Apt 2G
Closed — Violation dismissed - BHazardous
Refit door in the entrance located at apt 2g, 2nd story, 1st apartment from south at west
Feb 13, 2026 · Apt 2G
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective bell buzzer intercom system from the building entrance door to east wall in the foyer located at apt 5a, 5th story, 2nd apartment from east at south
Jan 24, 2026 · Apt 5A
Open — Not complied with - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 5a, 5th story, 2nd apartment from east at south
Jan 24, 2026 · Apt 5A
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 5a, 5th story, 2nd apartment from east at south
Jan 24, 2026 · Apt 5A
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 5a, 5th story, 2nd apartment from east at south
Jan 24, 2026 · Apt 5A
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5a, 5th story, 2nd apartment from east at south
Jan 24, 2026 · Apt 5A
Closed — Violation dismissed - BHazardous
Properly secure the loose ceramic floor tiles at public hall, 1st story
Dec 4, 2025
Closed — Violation dismissed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing hanging 11th and missing 12th metal tread on 1st fire escape from north at east at fire escape, 2nd story
Dec 4, 2025
Closed — Violation closed - BHazardous
Repair the broken or defective connection drain pipe at wash basin in the bathroom located at apt 2g, 2nd story, 1st apartment from south at west
Dec 2, 2025 · Apt 2G
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north located at apt 2g, 2nd story, 1st apartment from south at west
Dec 2, 2025 · Apt 2G
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the 1st room from north located at apt 2g, 2nd story, 1st apartment from south at west
Dec 2, 2025 · Apt 2G
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardent material at ceiling at public hall, 1st story
Nov 17, 2025
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story
Nov 17, 2025
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Nov 17, 2025
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3g, 3rd story, 1st apartment from west at north , section at west
Sep 23, 2025 · Apt 3G
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 3g, 3rd story, 1st apartment from west at north , section at west
Sep 23, 2025 · Apt 3G
Closed — Violation dismissed - BHazardous
Refit door in the entrance located at apt 3g, 3rd story, 1st apartment from west at north , section at west
Sep 23, 2025 · Apt 3G
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3g, 3rd story, 1st apartment from west at north , section at west
Sep 23, 2025 · Apt 3G
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 3g, 3rd story, 1st apartment from west at north , section at west
Sep 23, 2025 · Apt 3G
Closed — Violation dismissed - BHazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods ...at second fire escape from east at north
Aug 20, 2025
Closed — Violation closed - BHazardous
Cleanse and disinfect to the satisfaction of this department after removing the heavy dutty garbage bags at west yard at floor yard
Aug 18, 2025
Closed — Violation closed
DOB building violations · 25
- High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2020 internal hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2021 external hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2021 internal hgh pressure inspection
Jun 30, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2022 internal high pressure inspection
Apr 25, 2023
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2022 external high pressure inspection
Apr 25, 2023
Dob violation - active
Show 15 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Immediate emergency anythingoptional
Install approximately 110linear feet of sidewalk shed along exp#1(west 207 st)& return 15 ft toward building to cover & protect main.entrance add addtional 5 linear feet of sidewalk shed to overlap adjacent prope rties to safeguard the public, property and the public
Aug 2, 2022
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 6, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 18, 2018
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2017
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Jun 12, 1998
Dob violation - dismissed
ECB violations · 28
- Class - 2
Failure to maintain, at time of inspection observed household item consisting of flat screen tv and furniture being stored to 5th story south section public hallway partially obstructing exit pathway., repair a
Jun 6, 2026
Resolve - Class - 1
Failure to maintain building in code-compliant manner. at time of inspection observed 1,2 & 4 floors 1-6 windows at fire escapes & landings 2 ac units, brackets & miscellaneous household items & construction de
May 18, 2026 · Penalty $2,500
Active - Class - 2
Failure to comply with commissioner's order contained in summons #39088697l issued on 06/16/2023, and failure to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2). an acceptable cert
Jan 29, 2025 · Penalty $1,250
Active - Class - 2
Failure to comply with commissioner's order contained in summons #39088698n issued on 06/16/2023, and failure to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2). an acceptable cert
Jan 29, 2025 · Penalty $1,250
Active - Class - 2
At time of inspection of 6 story mixed use building observed sidewalk shed in place not to code specifications 1. sidewalk shed does not cover full width of sidewalk 2. sidewalk shed does not cover full length
Dec 1, 2023 · Penalty $2,400
Resolve - Class - 2
Observed a red & white vinyl (temporary) accessory sign for coffee & fukin bagels" measuring approx. 4ft.(h) x 8ft.(w), attached to the (east) face of the side walk shed w. screws. the business is registered w.
Oct 23, 2023 · Penalty $2,500
Resolve - Class - 2
Failure to file permit with nyc dept of bldgs and to recieve a certificate of approval for new burner, also found exposed wiring, discharge pipe missing at low water cut off, safety relief valve label not legib
Jun 16, 2023 · Penalty $625
Active - Class - 2
Found ao smith model# hw420, h stamped boiler not registered with nycdob,, maintain boiler; pull permit bring job up to current code and call for an inspection.
Jun 16, 2023 · Penalty $625
Active - Class - 1
Failure to maintain building in code compliant manner. noted facade on "west 207th st" in state of disrepair with vertical cracks in brick, masonry finished stone, loose glass and wood in window frame., repair
Aug 2, 2022 · Penalty $1,250
Active - Class - 1
Work w/o a permit-electrical. note:at time of inspection i observed exposed bx cable in ceiling hanging and outlets. a search of dob recordsshow no electrical permits have been obtain for work in store front. r
Oct 13, 2020 · Penalty $6,250
Resolve
Show 18 more ↓
- Class - 2
Failure to comply w/the comm's order contained in summons/vio#35297379l issued on 1-22-18 & to file a c of c pursuant to 28-201.1 & 1rcny & 1rcny 102-01. remedy: comply w/comm's order & or file a c of c.
Mar 5, 2018 · Penalty $800
Resolve - Class - 1
Failure to maintain bldg in code-compliant manner no fire stopping per bc 712.3;27-345 noted exposed wooden joist (floor) to the above apy in a area of approx 205' x 30.5 x 2.5' located between the hood (system
Jan 22, 2018 · Penalty $1,000
Active - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35249325j issued on 06/08/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Jan 10, 2018 · Penalty $800
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35249325j issued on 06/08/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg in code compliant manner: no fire stop
Nov 28, 2017 · Penalty $2,000
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35249325j issued on 06/18/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.rem:comply with commissi
Oct 17, 2017 · Penalty $2,000
Resolve - Class - 2
Failure to comply w/ the commissioner's order in summons/violation# 35249325j issued on 6/8/17 & file a c of c pursuant to 28-201.1 & 1rcny 102-01. for no fire stopping @ apt a. rem: comply w/ commissioner's or
Aug 30, 2017 · Penalty $2,000
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35249325j issued on 06/08/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. no compliance recorded for fire stopping issues at apt#1a.
Jul 27, 2017 · Penalty $800
Resolve - Class - 2
Work without a permit.observed on ground level stove aslow (kenedy's)newly installed exhaust hood made of stainless steel.also wall from ceiling to floor behind back of hood made of stainless steel.hvac venting
Jun 8, 2017 · Penalty $800
Active - Class - 1
Failure to maintain building in code compliant manner.no fire stoppingper bc712.3;27-345 and exposing the wooden floor joist to the above apapartment a area of approximately 3 sq ft.location is between hood sys
Jun 8, 2017 · Penalty $1,000
Active - Class - 2
Failure to provide effective continuity for metal raceways,enclosures cable armour.seal light raceway feeding outside light not properly terminated.rem:provide effective electrical continuity.
Jan 24, 2014 · Penalty $1,200
Active - Class - 2
Fail to maintain bldg in code compliant manner. noted: the following conditions: 1)commercial space barber stop has deteriorating rear ceiling 2) roof above barbershop has deteriorating flashing thru out. 3)roo
Mar 27, 2010
Resolve - Class - 2
32a.50a.50b.50c.50d.50e.50f.50g 50a dirty boiler rm debris 50b domestic hot water coil head leaking at face plate 50c boiler leaking on left side 50d install additional lighting in boiler rm 50e adjust oil burn
Jan 5, 2009
Resolve - Non-hazardous
36. 36- provide proof of regristration for fulton high pressure boiler 900a signed by d.o.b inspector.
Dec 21, 2005 · Penalty $180
Resolve - Non-hazardous
Removal and storage of material noted cumbustible waste material of combustable debris shall not be permitted to accumulate and shall be removed from the site at reasonable intervals in accordance with the requ
Sep 21, 2005 · Penalty $500
Active - Non-hazardous
Bq9 36 38 24b 50a 40 (bq9= work without a permit for the installation of the following, fulton high pressure boiler (bl) permit. fuel oil burner (fb) permit. two 275 gallon fuel storage tanks (fs) permit.
Aug 19, 2005 · Penalty $180
Resolve - Hazardous
43,28a,49,51. 49-replace plugged relief valve on coil. 28a,43-boilersmoking, boiler dirty. 51-hazardous condition-boiler sealed.
Oct 22, 1999 · Penalty $2,500
Active - Hazardous
Failure to maintain building: 1)in that a section. apprx. 4 ft of concparapet wall has become dislocated from parapet wall north facade (topof wall)and fell on to street below adjacent to subway egress in front
Jun 11, 1998 · Penalty $2,500
Active - Hazardous
Failure to have approved pa plans available for inspection. use of prohibited doors at exits and at center of two dining areas steel roll down gates. remedy: remove gates.
Jan 7, 1991 · Penalty $230
Resolve
Complaints
- Heat/hot water
Entire building
Oct 18, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Sep 10, 2026 · Apt 3H
Open - Flooring/stairs
Floor
Sep 10, 2026 · Apt 3H
Open - General
Cooking gas
Sep 10, 2026 · Apt 3H
Open - Unsanitary condition
Pests
Jul 16, 2026 · Apt 2G
Close - General
Bell/buzzer/intercom
Jul 15, 2026 · Apt 2G
Close - Plumbing
Basin/sink
Jul 11, 2026 · Apt 2G
Close - Electric
Wiring
Jul 11, 2026 · Apt 2G
Close - Unsanitary condition
Mold
Jul 11, 2026 · Apt 2G
Close - Safety
Fire escape
Jul 11, 2026 · Apt 2G
Close
Show 40 more ↓
- Unsanitary condition
Pests
Jul 6, 2026 · Apt 3H
Close - General
Bell/buzzer/intercom
Jul 5, 2026 · Apt 2G
Close - Safety
Fire escape
Jul 5, 2026 · Apt 2G
Close - Plumbing
Basin/sink
Jul 5, 2026 · Apt 2G
Close - Plumbing
Basin/sink
May 9, 2026 · Apt 2G
Close - Door/window
Door frame
May 9, 2026 · Apt 2G
Close - Door/window
Door
May 9, 2026 · Apt 2G
Close - Heat/hot water
Apartment only
May 9, 2026 · Apt 2G
Close - Plumbing
Water supply
May 3, 2026 · Apt 2G
Close - Door/window
Door
Apr 14, 2026 · Apt 2A
Close - General
Bell/buzzer/intercom
Feb 14, 2026 · Apt 2G
Close - Plumbing
Basin/sink
Feb 12, 2026 · Apt 2G
Close - Door/window
Door frame
Feb 12, 2026 · Apt 2G
Close - Paint/plaster
Ceiling
Feb 12, 2026 · Apt 2G
Close - General
Bell/buzzer/intercom
Feb 12, 2026 · Apt 2G
Close - Heat/hot water
Apartment only
Jan 26, 2026 · Apt 2B
Close - General
Bell/buzzer/intercom
Jan 23, 2026 · Apt 2G
Close - Door/window
Door
Jan 23, 2026 · Apt 2G
Close - Plumbing
Basin/sink
Jan 23, 2026 · Apt 2G
Close - Paint/plaster
Ceiling
Jan 23, 2026 · Apt 2G
Close - Safety
Fire escape
Jan 23, 2026 · Apt 2G
Close - Plumbing
Basin/sink
Jan 23, 2026 · Apt 2G
Close - Heat/hot water
Entire building
Jan 23, 2026 · Apt BLDG
Close - Plumbing
Basin/sink
Dec 30, 2025 · Apt 2G
Close - General
Bell/buzzer/intercom
Dec 30, 2025 · Apt 2G
Close - Paint/plaster
Ceiling
Dec 30, 2025 · Apt 2G
Close - Paint/plaster
Ceiling
Dec 30, 2025 · Apt 2G
Close - Water leak
Heavy flow
Dec 29, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Dec 29, 2025 · Apt 2B
Close - Paint/plaster
Ceiling
Dec 28, 2025 · Apt 2G
Close - Plumbing
Basin/sink
Dec 28, 2025 · Apt 2G
Close - Heat/hot water
Entire building
Dec 2, 2025 · Apt BLDG
Close - General
Bell/buzzer/intercom
Nov 30, 2025 · Apt 2G
Close - Paint/plaster
Ceiling
Nov 28, 2025 · Apt 2G
Close - Heat/hot water
Entire building
Nov 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 25, 2025 · Apt 5H
Close - General
Bell/buzzer/intercom
Nov 25, 2025 · Apt 5H
Close - Door/window
Door frame
Nov 18, 2025 · Apt 2G
Close - General
Bell/buzzer/intercom
Nov 18, 2025 · Apt 2G
Close - Heat/hot water
Entire building
Nov 10, 2025 · Apt 2G
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1925
- Floors
- 5
- Residential units
- 49
- Building area
- 48,217 ft²
- Lot area
- 12,500 ft²
- Zoning
- R7-2
- Community board
- 112
- Council district
- 10
- Block / lot
- 2241 / 24
- Assessed value
- $3,803,850
- Landmark / historic district
- No
HPD registration #107778, last renewed Sep 25, 2025.
Questions about 4925 Broadway
Who owns 4925 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is Mn Urban 207 LLC.
Does 4925 Broadway have violations?
Yes. NYC HPD has recorded 391 housing violations at this property.
Is 4925 Broadway rent stabilized?
NYC Department of Finance tax bills listed 9 rent-stabilized units here in 2024 (about 18% of its 49 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 4925 Broadway built?
City records list 1925 as the year it was built.
How many apartments are in 4925 Broadway?
It has 49 residential units and 59 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.