roofy

77 Cooper Street

Manhattan, NY 10034BBL 1-02241-0014Map

Owner of record: Bene, LLC

77 Cooper Street is an elevator apartment building built in 1936 in Manhattan, 10034. It has 44 residential units across 6 floors. The owner of record is Bene, LLC. HPD has recorded 254 housing violations here, most recently on October 18, 2026. 42 of the 50 most recent violations are still open. City tax records listed 43 rent-stabilized apartments here in 2024.

HPD violations
254
DOB violations
35
ECB violations
24
HPD complaints
257

What to know

Concern
7 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 18, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
43
About 98% of the building's 44 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 254

  • C

    Remove device preventing door from being self-closing consisting of kickdown door stopper installed on door in the entrance located at apt 6f, 6th story, 1st apartment from west at north

    Oct 18, 2026 · Apt 6F

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and the ceiling in the kitchen located at apt 1a, 1st story, 4th apartment from south at west

    Jun 4, 2026 · Apt 1A

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the steam riser at the east wall in the bathroom located at apt 1a, 1st story, 4th apartment from south at west

    Jun 4, 2026 · Apt 1A

    Open — Civ14 mailed
  • A

    Paint with light colored paint to the satisfaction of this department all walls and the entrance door in the bathroom located at apt 1a, 1st story, 4th apartment from south at west

    Jun 4, 2026 · Apt 1A

    Open — Civ14 mailed
  • B

    Trace and repair the source and abate the visible mold condition... greater than 1o square feet at the ceiling in the bathroom located at apt 1a, 1st story, 4th apartment from south at west

    Jun 4, 2026 · Apt 1A

    Open — Notice of issuance sent to tenant
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 1a, 1st story, 4th apartment from south at west

    Jun 4, 2026 · Apt 1A

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1a, 1st story, 4th apartment from south at west

    Jun 4, 2026 · Apt 1A

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1a, 1st story, 4th apartment from south at west

    Jun 4, 2026 · Apt 1A

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective porcelain glaze at bath tub in the bathroom located at apt 1a, 1st story, 4th apartment from south at west

    Jun 4, 2026 · Apt 1A

    Open — Civ14 mailed
  • A

    Paint metal in accordance with dept. regulation the door and the door frame in the entrance located at apt 1a, 1st story, 4th apartment from south at west

    Jun 4, 2026 · Apt 1A

    Open — Civ14 mailed
Show 40 more ↓
  • B

    Properly repair or replace the broken or defective door knob in the entrance located at apt 1a, 1st story, 4th apartment from south at west

    Apr 28, 2026 · Apt 1A

    Open — Nov sent out
  • C

    Remove all obstructions and repair all defects in wasteline at washbasin in the bathroom located at apt 1a, 1st story, 4th apartment from south at west

    Apr 28, 2026 · Apt 1A

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective doorknob at 2nd closet door at south wall in the foyer located at apt 1a, 1st story, 4th apartment from south at west

    Apr 28, 2026 · Apt 1A

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective doorknob at 1st closet at south wall in the foyer located at apt 1a, 1st story, 4th apartment from south at west

    Apr 28, 2026 · Apt 1A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east located at apt 1a, 1st story, 4th apartment from south at west

    Apr 28, 2026 · Apt 1A

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east located at apt 1a, 1st story, 4th apartment from south at west

    Apr 28, 2026 · Apt 1A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1a, 1st story, 4th apartment from south at west

    Apr 28, 2026 · Apt 1A

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1a, 1st story, 4th apartment from south at west

    Apr 28, 2026 · Apt 1A

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1a, 1st story, 4th apartment from south at west

    Apr 28, 2026 · Apt 1A

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1a, 1st story, 4th apartment from south at west

    Apr 28, 2026 · Apt 1A

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1a, 1st story, 4th apartment from south at west

    Apr 28, 2026 · Apt 1A

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective doorknob at entrance door in the 3rd room from east located at apt 1a, 1st story, 4th apartment from south at west

    Apr 28, 2026 · Apt 1A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at all walls in the bathroom located at apt 1a, 1st story, 4th apartment from south at west

    Apr 28, 2026 · Apt 1A

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1a, 1st story, 4th apartment from south at west

    Apr 28, 2026 · Apt 1A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from east at south located at apt 3h, 3rd story, 1st apartment from north at east

    Mar 26, 2026 · Apt 3H

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from east at north located at apt 3h, 3rd story, 1st apartment from north at east

    Mar 26, 2026 · Apt 3H

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the private hallway located at apt 3h, 3rd story, 1st apartment from north at east

    Mar 26, 2026 · Apt 3H

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the kitchen located at apt 3h, 3rd story, 1st apartment from north at east

    Mar 26, 2026 · Apt 3H

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic tiles floor in the kitchen located at apt 3h, 3rd story, 1st apartment from north at east

    Mar 26, 2026 · Apt 3H

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 4c, 4th story, 1st apartment from east at south

    Mar 2, 2026 · Apt 4C

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at 1st closet from south at west wall ceiling in the private hallway located at apt 4c, 4th story, 1st apartment from east at south

    Mar 2, 2026 · Apt 4C

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective silicone caulking around wash basin in the bathroom located at apt 4g, 4th story, 2nd apartment from west at north

    Mar 1, 2026 · Apt 4G

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective ceramic tiles at west wall in the bathroom located at apt 4g, 4th story, 2nd apartment from west at north

    Mar 1, 2026 · Apt 4G

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 4g, 4th story, 2nd apartment from west at north

    Mar 1, 2026 · Apt 4G

    Open — Notice of issuance sent to tenant
  • B

    Properly repair with similar material the broken or defective silicone caulking around sink in the kitchen located at apt 4g, 4th story, 2nd apartment from west at north

    Mar 1, 2026 · Apt 4G

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 4g, 4th story, 2nd apartment from west at north

    Mar 1, 2026 · Apt 4G

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 4g, 4th story, 2nd apartment from west at north

    Mar 1, 2026 · Apt 4G

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the private hallway located at apt 4g, 4th story, 2nd apartment from west at north

    Mar 1, 2026 · Apt 4G

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4g, 4th story, 2nd apartment from west at north

    Mar 1, 2026 · Apt 4G

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4g, 4th story, 2nd apartment from west at north

    Mar 1, 2026 · Apt 4G

    Open — Nov sent out
  • B

    Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods 1st fire escape from east at north at fire escape

    Dec 4, 2025

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall, 2nd window frame from east at south wall in the 3rd room from north at west located at apt 4c, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt 4C

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 4c, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt 4C

    Open — Nov sent out
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate in the 3rd room from north at west located at apt 4c, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt 4C

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the bathroom located at apt 4c, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt 4C

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door, 1st closet from north at east wall door frame in the private hallway located at apt 4c, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt 4C

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at baseboard at south wall in the 3rd room from north at west located at apt 4c, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt 4C

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door, 1st closet from south at west wall door frame, 2nd closet from south at west wall door frame, 1st door from west at north wall, 1st door frame from west at north wall in the foyer located at apt 4c, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt 4C

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 2nd closet from south at west wall door in the foyer located at apt 4c, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt 4C

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the kitchen located at apt 4c, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt 4C

    Closed — Violation closed

DOB building violations · 35

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2024

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2022

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Apr 29, 2021

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 18, 2017

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst

    May 30, 2014

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2012 inspection/test

    Mar 31, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 26, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 27, 2012

    Dob violation - resolved
Show 25 more ↓
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2012

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 2, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 20, 2010

    Dob violation - resolved
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 30, 2009

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Oct 1, 2005

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 16, 2005

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Elevator elevatorrequired

    1p6779

    Jul 31, 2002

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Elevator elevatorrequired

    1p6779

    May 3, 2000

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 11, 1993

    Vp*-violation unserved ecb- dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 13, 1992

    Vp*-violation unserved ecb- dismissed
  • Elevator elevatorrequired

    74-cover all hand holes on hoistway doors and repair hole in cab floor 35- provide access to motor room

    Oct 22, 1990

    Dob violation - resolved
  • Elevator elevatorrequired

    (51)provide light in cab.(52)properly tag governor after conductg 5 year safety test

    Apr 10, 1989

    Dob violation - resolved
  • Elevator elevatorrequired

    51-provide globe for alglit in car

    Jan 18, 1989

    Dob violation - resolved

ECB violations · 24

  • Class - 1

    Failure to comply with the commissioners order contained in summons# 35666659r issued on 03/28/2023 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01., comply with commissioner's ord

    May 10, 2024 · Penalty $6,250

    Resolve
  • Class - 1

    Failure to maintain building in code compliant manner. class 1 item: door lock monitoring installed but inoperative. remedy: repair and call the dob elevator division at (212) 393-2144 for a re-inspection. clas

    Apr 18, 2024 · Penalty $1,250

    Resolve
  • Class - 1

    Unlawful acts: failure to comply with the commissioners order contained in summons/violation# 35666659r issued on 03/28/23 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. (inadequ

    Dec 28, 2023 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to maintain building in code compliant manner. service elevator as per bc 3001.2 & 27-987. upon inspection, device was found to be out of service creating a hazardous condition as per 1 rcny11-02. remed

    Apr 1, 2023 · Penalty $1,250

    Resolve
  • Class - 1

    97-x-17.failure to maintain building in code compliant manner.service equipment as per bc3001.2&27-987.upon inspection device is found to beout of service creating a hazardous condition as per 1rcny11-02.remedy

    Apr 1, 2023 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to post and distribute notice of tenant protection plan.note:at time of inspection observed work being performed under the aforementioned job number with no notice of tpp posted in an occupied building

    Mar 28, 2023 · Penalty $6,250

    Active
  • Class - 2

    Failure to post or distribute safe construction bill of rights.note:attime of inspection observed work being performed under the aforementioned job number by code it is required the scbofr be posted or distribu

    Mar 28, 2023 · Penalty $6,250

    Active
  • Class - 1

    28-201.1 inadequate tenant protection plan.note:at time of inspection observed work being performed under the aforementioned job number.the submitted tpp lacks specific means and methods on the health requireme

    Mar 28, 2023 · Penalty $1,250

    Active
  • Class - 2

    Shoes worn. brake maintenance tag missing. machine leaking oil.

    Sep 10, 2020 · Penalty $1,562

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35073950z issued on 03-05-14 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg in a code compliant manner. exhaust

    Oct 15, 2019 · Penalty $1,250

    Resolve
Show 14 more ↓
  • Class - 1

    Unlawful acts. failure to comply with commissioner's order: noted: upon inspection previous violation #35073950z remain open. violation was issued on 03/05/2014, comply with commissioner's order

    Aug 10, 2019

    Resolve
  • Class - 1

    Unlawful acts. failure to comply with commissioner's order: noted: upon inspection previous violation #35250049k remain open. violation was issued on 01/24/2018, comply with commissioner's order

    Aug 10, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    Work w/o permit. noted: in deli store at corner of building observed new full exhaust system installed w/o permit such as: 1-new stainless steel hood, size appx: 3'w x 12'l; 2-new metal duct installed size app

    Jan 24, 2018 · Penalty $2,000

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner. exhaust discharge must be no closer than 10'from building openings as per rs2-2.1.4 &mc 401.5.2. note: the exhaust duct used to vent fumes from industrial

    Mar 5, 2014 · Penalty $800

    Active
  • Class - 2

    Work w/o a permit. work noted: installed a commercial a/c unit for beauty parlor in rear fire passageway supported on stacked up concrete blocks. remedy: obtain permit if feasible or remove unit.

    Jul 8, 2011 · Penalty $800

    Resolve
  • Class - 2

    Sidewalk shed does not meet code specification (members not braced on exp #1).

    Dec 16, 2008

    Resolve
  • Class - 1

    No records of daily inspect. of suspended scaffold performed by authorized person at site remedy:maintain daily inspect. record on site

    Oct 9, 2008 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to provide approved accepted plans at jobsite at time of inspection no plans for platforms on cooper st outriggers.remedy:provide plans

    Oct 9, 2008

    Resolve
  • Non-hazardous

    27q07,13m07, 27q07-provide cover bottom final limits.

    Jun 4, 2001

    Resolve
  • Non-hazardous

    30o02,20i10,50f11,14b07.30-clean down hoistway.20-repair basmeit hall station.50-eliminate excessive lost motion in machine gearing.14-put cert.or location sign in frame(no copies)

    Jul 12, 2000

    Resolve
  • Non-hazardous

    08j 22l 30p 40u 50f 57p 15d 74# 08 adjust 22 reppair 30 access provide 40 5yr test 50 adjust 57 provide access 15 basement where necessary 74 eliminate excessive noise and vibration while car is in operation

    May 10, 1999

    Resolve
  • Non-hazardous

    35p, 74x. 74-have elev answer all calls as per code.

    May 23, 1995

    Resolve
  • Non-hazardous

    05i,11b,11q,28l,35p,58o,59o.

    Apr 29, 1994

    Resolve
  • Non-hazardous

    55x,28h,73o,11q,63h,25q,31q,36w,37g,15#,15 cover all hand holes.

    Apr 24, 1991 · Penalty $150

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Oct 21, 2026 · Apt BLDG

    Open
  • Heat/hot water

    Entire building

    Oct 20, 2026 · Apt BLDG

    Open
  • Heat/hot water

    Entire building

    Oct 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 17, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Oct 14, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    May 29, 2026 · Apt 1A

    Close
  • Paint/plaster

    Ceiling

    May 29, 2026 · Apt 1A

    Close
  • Water leak

    Heavy flow

    May 29, 2026 · Apt 1A

    Close
  • Paint/plaster

    Ceiling

    Apr 27, 2026 · Apt 1A

    Close
  • Paint/plaster

    Ceiling

    Apr 27, 2026 · Apt 1A

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Apr 25, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 21, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 21, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 20, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 27, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 25, 2026 · Apt BLDG

    Close
  • Paint/plaster

    Wall

    Mar 10, 2026 · Apt 3H

    Close
  • Unsanitary condition

    Mold

    Feb 25, 2026 · Apt 4G

    Close
  • Paint/plaster

    Ceiling

    Feb 25, 2026 · Apt 4G

    Close
  • Paint/plaster

    Ceiling

    Feb 22, 2026 · Apt 4C

    Close
  • Paint/plaster

    Ceiling

    Feb 22, 2026 · Apt 4C

    Close
  • Paint/plaster

    Ceiling

    Feb 4, 2026 · Apt 4G

    Close
  • Paint/plaster

    Wall

    Feb 4, 2026 · Apt 4G

    Close
  • Door/window

    Window frame

    Feb 4, 2026 · Apt 4G

    Close
  • Heat/hot water

    Apartment only

    Jan 31, 2026 · Apt 2G

    Close
  • Heat/hot water

    Entire building

    Jan 28, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 27, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 26, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 25, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 25, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 28, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 27, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 27, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 2, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 4, 2025 · Apt 6H

    Close
  • Heat/hot water

    Entire building

    Nov 1, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 31, 2025 · Apt 4A

    Close
  • Paint/plaster

    Ceiling

    Oct 21, 2025 · Apt 4C

    Close
  • Paint/plaster

    Ceiling

    Oct 21, 2025 · Apt 4C

    Close
  • Heat/hot water

    Entire building

    Oct 17, 2025 · Apt 6G

    Close
  • Plumbing

    Water supply

    Oct 12, 2025 · Apt BUILDI

    Close
  • Plumbing

    Water supply

    Oct 12, 2025 · Apt 4D

    Close
  • Heat/hot water

    Entire building

    Oct 12, 2025 · Apt 4D

    Close
  • Heat/hot water

    Entire building

    Oct 3, 2025 · Apt 1D

    Close
  • Flooring/stairs

    Floor

    Dec 17, 2024 · Apt 2B

    Close
  • Paint/plaster

    Wall

    Dec 17, 2024 · Apt 2B

    Close
  • Water leak

    Damp spot

    Jun 21, 2024 · Apt 6A

    Close
  • Door/window

    Window frame

    Jun 21, 2024 · Apt 6A

    Close
  • Paint/plaster

    Wall

    Jun 21, 2024 · Apt 6A

    Close
  • Water leak

    Damp spot

    Jun 21, 2024 · Apt 6A

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D7)
Year built
1936
Floors
6
Residential units
44
Building area
50,583 ft²
Lot area
10,000 ft²
Zoning
R7A
Community board
112
Council district
10
Block / lot
2241 / 14
Assessed value
$2,354,400
Landmark / historic district
No

HPD registration #101632, last renewed Oct 9, 2025.

Questions about 77 Cooper Street

Who owns 77 Cooper Street?

The owner of record in NYC Department of City Planning PLUTO data is Bene, LLC.

Does 77 Cooper Street have violations?

Yes. NYC HPD has recorded 254 housing violations at this property.

Is 77 Cooper Street rent stabilized?

NYC Department of Finance tax bills listed 43 rent-stabilized units here in 2024 (about 98% of its 44 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 77 Cooper Street built?

City records list 1936 as the year it was built.

How many apartments are in 77 Cooper Street?

It has 44 residential units and 52 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.