roofy

45 Wadsworth Terrace

Manhattan, NY 10040BBL 1-02170-0370Map

Owner of record: 45 Wadsworth LP

45 Wadsworth Terrace is an elevator apartment building built in 1929 in Manhattan, 10040. It has 50 residential units across 6 floors. The owner of record is 45 Wadsworth LP. HPD has recorded 550 housing violations here, most recently on September 17, 2026. 36 of the 50 most recent violations are still open. City tax records listed 42 rent-stabilized apartments here in 2024.

HPD violations
550
DOB violations
26
ECB violations
19
HPD complaints
1,088

What to know

Concern
5 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 17, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
42
About 84% of the building's 50 apartments
Down from 47 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 550

  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 3rd room from north at west, the 1st room from north at east, the foyer , the private hallway , the 3rd room from north at east located at apt 4e, 4th story, 1st apartment from east at south

    Sep 17, 2026 · Apt 4E

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st riser from east at south wall in the kitchen located at apt 4e, 4th story, 1st apartment from east at south

    Sep 17, 2026 · Apt 4E

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the kitchen located at apt 4e, 4th story, 1st apartment from east at south

    Sep 17, 2026 · Apt 4E

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 4e, 4th story, 1st apartment from east at south

    Sep 17, 2026 · Apt 4E

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchen located at apt 4e, 4th story, 1st apartment from east at south

    Sep 17, 2026 · Apt 4E

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective mortise lock at entrance door in the entrance located at apt 2a, 2nd story, 1st apartment from south at west

    May 29, 2026 · Apt 2A

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 2a, 2nd story, 1st apartment from south at west

    May 29, 2026 · Apt 2A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the private hallway located at apt 2a, 2nd story, 1st apartment from south at west

    May 29, 2026 · Apt 2A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2a, 2nd story, 1st apartment from south at west

    May 29, 2026 · Apt 2A

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2a, 2nd story, 1st apartment from south at west

    May 29, 2026 · Apt 2A

    Open — Nov sent out
Show 40 more ↓
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the private hallway located at apt 1a, 1st story, 1st apartment from south at west

    May 29, 2026 · Apt 1A

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 1a, 1st story, 1st apartment from south at west

    May 29, 2026 · Apt 1A

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west

    May 29, 2026 · Apt 1A

    Open — Notice of issuance sent to tenant
  • A

    Properly repair or replace the broken or defective escutcheon plate at top and bottom of heat riser in the 1st room from north located at apt 1a, 1st story, 1st apartment from south at west

    May 29, 2026 · Apt 1A

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 1a, 1st story, 1st apartment from south at west

    May 29, 2026 · Apt 1A

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from south at west

    May 29, 2026 · Apt 1A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 1a, 1st story, 1st apartment from south at west

    May 29, 2026 · Apt 1A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from north located at apt 1a, 1st story, 1st apartment from south at west

    May 29, 2026 · Apt 1A

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 5e, 5th story, 1st apartment from east at south

    May 22, 2026 · Apt 5E

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective electrical outlet at the west wall in the 3rd room from north located at apt 5e, 5th story, 1st apartment from east at south

    May 22, 2026 · Apt 5E

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective electrical outlet at the east wall and the west wall in the 2nd room from north located at apt 5e, 5th story, 1st apartment from east at south

    May 22, 2026 · Apt 5E

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective light fixture at the ceiling in the 2nd private hallway from north located at apt 5e, 5th story, 1st apartment from east at south

    May 22, 2026 · Apt 5E

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective light fixture at the ceiling in the kitchen located at apt 5e, 5th story, 1st apartment from east at south

    May 22, 2026 · Apt 5E

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective electrical outlet at the east wall in the 1st room from north at west located at apt 5e, 5th story, 1st apartment from east at south

    May 22, 2026 · Apt 5E

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective electrical outlet at the south wall, east wall, west wall, and the north wall in the 1st room from north at east located at apt 5e, 5th story, 1st apartment from east at south

    May 22, 2026 · Apt 5E

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic tiles south wall in the bathroom located at apt 4c, 4th story, 3rd apartment from east at south

    May 10, 2026 · Apt 4C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from east located at apt 4c, 4th story, 3rd apartment from east at south

    May 10, 2026 · Apt 4C

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4c, 4th story, 3rd apartment from east at south

    May 10, 2026 · Apt 4C

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4c, 4th story, 3rd apartment from east at south

    May 10, 2026 · Apt 4C

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 4c, 4th story, 3rd apartment from east at south

    May 10, 2026 · Apt 4C

    Open — Notice of issuance sent to tenant
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 4e, 4th story, 1st apartment from east at south

    May 7, 2026 · Apt 4E

    Open — Nov sent out
  • A

    Repair the leaky and/or defective water supply pipe at sink in the kitchen located at apt 1a, 1st story, 1st apartment from south at west

    Feb 8, 2026 · Apt 1A

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west

    Feb 8, 2026 · Apt 1A

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked at cellar at boiler room

    Feb 8, 2026

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the private hallway located at apt 1a, 1st story, 1st apartment from south at west

    Feb 5, 2026 · Apt 1A

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 1a, 1st story, 1st apartment from south at west

    Feb 5, 2026 · Apt 1A

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective at east wall in the bathroom located at apt 1a, 1st story, 1st apartment from south at west

    Feb 5, 2026 · Apt 1A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 1a, 1st story, 1st apartment from south at west

    Feb 5, 2026 · Apt 1A

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 6f, 6th story, 1st apartment from north at east , section at east

    Dec 9, 2025 · Apt 6F

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at compactor closet, 1st story

    Aug 20, 2025

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at compactor closet, 2nd story

    Aug 20, 2025

    Closed — Violation closed
  • A

    Refit door at compactor closet, 2nd story

    Aug 20, 2025

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at fire door leading to west section at public hall, 3rd story

    Apr 28, 2025

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective frame at the compactor closet at public hall, 4th story

    Apr 28, 2025

    Closed — Violation closed
  • B

    Properly secure the loose door handle on the fire door leading to the east sections at public hall, 4th story

    Apr 28, 2025

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the 2nd room from north located at apt 4e, 4th story, 1st apartment from east at south , section at east

    Apr 28, 2025 · Apt 4E

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 4e, 4th story, 1st apartment from east at south , section at east

    Apr 28, 2025 · Apt 4E

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 4th room from north located at apt 4e, 4th story, 1st apartment from east at south , section at east

    Apr 28, 2025 · Apt 4E

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at the compactor closet at public hall, 3rd story

    Apr 28, 2025

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at the fire door leading to the east sections at public hall, 4th story

    Apr 28, 2025

    Closed — Violation closed

DOB building violations · 26

  • Plumbing none

    Stop all plumbing work under above mentioned permit immediately the borough commissioner intends to revoke all plumbing approvals and permit issued under job # 140486043 due to suspension of license master plumber # 000945

    Jul 12, 2022

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - active
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 23, 2016

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 15, 2015

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 13, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 13, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 4, 2011

    Dob violation - resolved
Show 16 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 3, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 27, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 27, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 11, 2005

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Elevator elevatorrequired

    1p23763

    Jan 10, 2002

    Dob violation - resolved
  • Elevator elevatorrequired

    1p23763

    Nov 24, 1999

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 13, 1997

    Dob violation - active
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 13, 1997

    Dob violation - dismissed
  • Elevator elevatoroptional

    1

    Apr 25, 1991

    Dob violation - dismissed
  • Elevator elevatorrequired

    (51) cease use until items 12 are compled with (52) (overhead) secure and repair wall and skylight clean & provide light (53) cover all splice boxs

    Nov 30, 1988

    Dob violation - active
  • Elevator elevatorrequired

    (51) cease use until items 12 and 21 are compled with (52) overhead secure and repair wall and skylight clean and provide light (53) cover all slice boxes

    Nov 30, 1988

    Dob violation - resolved
  • Elevator elevatorrequired

    (1)replace 1 floor guard & renew car door guard, 2nd floor glass properly tag governor after conducting 2 yr safety test.(51)lock over- head and clean room., provide cover on top of car

    Oct 6, 1988

    Dob violation - resolved

ECB violations · 19

  • Class - 2

    A 8. at the time of inspection i observed unsafe wiring in apartment 5e. circuits were extended along walls with exposed braded conductors. there is also exposed romex coming out of an outlet in the bedroom thr

    May 29, 2026 · Penalty $830

    Active
  • Class - 2

    2x10,37w7,4127,68m7,100m7. 2x10-outside comm inoperative repair; 37w7overhead door unlocked provide locked door; 41w7-motor room door unlocked provide locked door; 68m7-missing log and mcp bulk 2019,provide;

    Feb 28, 2019

    Resolve
  • Class - 1

    Failure to maintain building in code compliant manner. i observed in the cellar gas dryers installed with gas flex hoses and dryer vents are back pitched also futures on gas line.rmdy:repair and/or replace.

    Dec 31, 2018

    Resolve
  • Class - 1

    Work w/o a permit. i observed behind the gas dryers in the cellar a new gas valve was installed w/o permits on site. *photos taken* rmdy: obtain permit.

    Dec 31, 2018

    Resolve
  • Class - 1

    Failure to have new or altered plumbing system tested. i observed in the cellar behind gas dryers a new valve was installed and failure to have the gas valve tested. rmdy: perform test.

    Dec 31, 2018

    Resolve
  • Class - 2

    B254,21a,50,50a,50b,50c,50d,50e. 50-pressure controls mounted on 1/4" piping; 50a-pulley guard missing on transfer pump;50b-discharge pipe missing on 530c valve;50c-temperature gauge missing on hot water line,

    Aug 14, 2013

    Resolve
  • Class - 2

    37x10,56y13,57q03,60q03,76q03: 37x10;repair light in overhead sheave room. 57q03;install cover for motor lead box. 76q03;install cover for plank switch.

    Mar 20, 2012 · Penalty $500

    Resolve
  • Class - 1

    Failure to maintain building wall(s) or appurtenances. defect noted: building has deteriorated, sagging of exit passage may concrete deck slab at north side court yard alley also improper drainage as hole in te

    Jun 29, 2009 · Penalty $1,000

    Resolve
  • Class - 2

    15i11.56y13.70o02.37t7 provide sign for overhead sheave rm door 52m7 provide spin out for hoist cables

    May 18, 2009 · Penalty $2,500

    Resolve
  • Class - 2

    97v10,56b10,57b10,5b1 97-leveling; off c level. 56-machine making loudnoises 5-dab door opened;reduce gap

    Feb 11, 2009 · Penalty $2,500

    Resolve
Show 9 more ↓
  • Class - 1

    *52b1432h1021d0621m0716t0716d0670o02. cease use item 52b14 shorten hoist ropes counterweight botton onto buffer spring non cease use items 32h10 repair or replace car shoes 21d06 secure 5th flr interlock 21m07

    Dec 2, 2008 · Penalty $5,000

    Resolve
  • Non-hazardous

    21d06.16i10.16q07.20b06.34d06.86bb05. 21d06 secure 5th fl interlock 16i10 repair damaged metal strip on hatch door shaft side 16q07 provide covers on lobby 2nd & 6 fl hatch doors shaftside 20b06 properly secure

    Jun 24, 2008 · Penalty $180

    Resolve
  • Non-hazardous

    Cease use/hazardous. cu 21l10/66o02/55y10. (21-l-10)interlocks defective repair. note: when you pull the 4th or 3rd flr hall door the elevator stops in motion.

    Dec 29, 2005 · Penalty $500

    Resolve
  • Non-hazardous

    21d06/84m07/36d06/08m10 21-3rd and 4th floors 84-provide toe guard(apron)36d06-ladder to overhead door 08m10-provide facia 6th floor and 5thfl.

    Dec 2, 2003 · Penalty $180

    Resolve
  • Non-hazardous

    Failure to maintain bldg. defect is: exterior fire passage/walkway atnorthwest side of bldg. cellar level is defective in that masonry decking broken & spalling at various places. remedy: repair all defect

    Jan 27, 1998 · Penalty $2,500

    Resolve
  • Non-hazardous

    Work without a permit. noted: 3 gas fired clothes dryers (commercial type) aka huebslh originators "route master" coin operated & 3 coin operated commercial type washing machine (maytag) installed in cellar.

    Jan 27, 1998

    Resolve
  • Hazardous

    15i39h46k52o05k74m05k47h74d74w17q17i35r57o62o30o #15 i 5fl door damaged repari or replace (cease use) #52-0 oily brake pads 74m replace missing guard #74 d provide cover elect. box top of car. #17q provide pro

    May 20, 1997

    Resolve
  • Hazardous

    Failure to maintain exterior building. defect is: in the floor slab,and concrete missing from the masonry protecting the floor slab steel outer support. location: the concrete verrandah northwest & southwes

    Jun 22, 1995 · Penalty $1,000

    Resolve
  • Non-hazardous

    03v,08v,14m,15l,17i,25#,31m,33i,33a,35r,35o,35t,46l,62m,28l,15m,03-capacity plate 25-property wire it 31-covers 33-skylight 35-non-pertimentmaterial 62-toe-guards 15m-push-plates.

    Apr 3, 1992 · Penalty $75

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Sep 25, 2026 · Apt 4B

    Open
  • Paint/plaster

    Wall

    Sep 9, 2026 · Apt 4E

    Close
  • Paint/plaster

    Wall

    Sep 9, 2026 · Apt 4E

    Close
  • Flooring/stairs

    Floor

    Sep 9, 2026 · Apt 4E

    Close
  • Flooring/stairs

    Floor

    Sep 9, 2026 · Apt 4E

    Close
  • Flooring/stairs

    Floor

    Sep 9, 2026 · Apt 4E

    Close
  • Paint/plaster

    Wall

    Sep 9, 2026 · Apt 4E

    Close
  • Paint/plaster

    Wall

    Sep 9, 2026 · Apt 4E

    Close
  • Flooring/stairs

    Floor

    Sep 9, 2026 · Apt 4E

    Close
  • Paint/plaster

    Wall

    Sep 9, 2026 · Apt 4E

    Close
Show 40 more ↓
  • Flooring/stairs

    Floor

    Sep 9, 2026 · Apt 4E

    Close
  • Paint/plaster

    Ceiling

    Sep 7, 2026 · Apt 2F

    Close
  • Water leak

    Slow leak

    Sep 7, 2026 · Apt 2F

    Close
  • Water leak

    Slow leak

    Jul 28, 2026 · Apt 1CANDI

    Close
  • Unsanitary condition

    Mold

    May 26, 2026 · Apt 2A

    Close
  • Electric

    Lighting

    May 26, 2026 · Apt 2A

    Close
  • Door/window

    Door

    May 26, 2026 · Apt 2A

    Close
  • Water leak

    Heavy flow

    May 26, 2026 · Apt 2A

    Close
  • Paint/plaster

    Wall

    May 26, 2026 · Apt 2A

    Close
  • Paint/plaster

    Wall

    May 26, 2026 · Apt 2A

    Close
  • Paint/plaster

    Wall

    May 26, 2026 · Apt 2A

    Close
  • Water leak

    Slow leak

    May 26, 2026 · Apt 2A

    Close
  • Door/window

    Window frame

    May 19, 2026 · Apt 5E

    Close
  • Electric

    Wiring

    May 19, 2026 · Apt 5E

    Close
  • Electric

    Wiring

    May 19, 2026 · Apt 5E

    Close
  • Safety

    Window guard broken/missing

    May 19, 2026 · Apt 5E

    Close
  • Electric

    Outlet/switch

    May 19, 2026 · Apt 5E

    Close
  • Flooring/stairs

    Floor

    May 18, 2026 · Apt 1A

    Close
  • Paint/plaster

    Ceiling

    May 18, 2026 · Apt 1A

    Close
  • Paint/plaster

    Wall

    May 18, 2026 · Apt 1A

    Close
  • Paint/plaster

    Wall

    May 18, 2026 · Apt 1A

    Close
  • Water leak

    Heavy flow

    May 15, 2026 · Apt 4C

    Close
  • Plumbing

    Bathtub/shower

    May 12, 2026 · Apt 4C

    Close
  • Plumbing

    Basin/sink

    May 12, 2026 · Apt 4C

    Close
  • Electric

    Outlet/switch

    May 12, 2026 · Apt 4C

    Close
  • Paint/plaster

    Ceiling

    May 7, 2026 · Apt 4C

    Close
  • Unsanitary condition

    Pests

    May 7, 2026 · Apt 4C

    Close
  • Flooring/stairs

    Floor

    May 7, 2026 · Apt 4C

    Close
  • Door/window

    Door

    May 7, 2026 · Apt 4C

    Close
  • Unsanitary condition

    Mold

    May 7, 2026 · Apt 4C

    Close
  • Door/window

    Door

    May 7, 2026 · Apt 4C

    Close
  • Paint/plaster

    Ceiling

    May 7, 2026 · Apt 4C

    Close
  • Heat/hot water

    Entire building

    Apr 5, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Apr 2, 2026 · Apt 5F

    Close
  • Heat/hot water

    Entire building

    Feb 24, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 20, 2026 · Apt BLDG

    Close
  • General

    Ventilation system

    Feb 15, 2026 · Apt 4E

    Close
  • Paint/plaster

    Wall

    Feb 15, 2026 · Apt 4E

    Close
  • General

    Cabinet

    Feb 15, 2026 · Apt 4E

    Close
  • Flooring/stairs

    Floor

    Feb 15, 2026 · Apt 4E

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
1929
Floors
6
Residential units
50
Building area
48,083 ft²
Lot area
12,500 ft²
Zoning
R7-2
Community board
112
Council district
10
Block / lot
2170 / 370
Assessed value
$1,604,700
Landmark / historic district
No

HPD registration #122675, last renewed Sep 10, 2025.

Questions about 45 Wadsworth Terrace

Who owns 45 Wadsworth Terrace?

The owner of record in NYC Department of City Planning PLUTO data is 45 Wadsworth LP.

Does 45 Wadsworth Terrace have violations?

Yes. NYC HPD has recorded 550 housing violations at this property.

Is 45 Wadsworth Terrace rent stabilized?

NYC Department of Finance tax bills listed 42 rent-stabilized units here in 2024 (about 84% of its 50 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 45 Wadsworth Terrace built?

City records list 1929 as the year it was built.

How many apartments are in 45 Wadsworth Terrace?

It has 50 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.