525 West 169 Street
Manhattan, NY 10032BBL 1-02126-0028Map
Owner of record: Audubon 79 LLC
525 West 169 Street is a walk-up apartment building built in 1911 in Manhattan, 10032. It has 24 residential units across 5 floors. The owner of record is Audubon 79 LLC. HPD has recorded 454 housing violations here, most recently on September 17, 2025. 3 of the 50 most recent violations are still open. City tax records listed 20 rent-stabilized apartments here in 2024.
- HPD violations
- 454
- DOB violations
- 16
- ECB violations
- 31
- HPD complaints
- 2,524
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 454
- BHazardous
Properly repair with similar material the broken or defective the wood floor in the kitchen located at apt 1a, 1st story, 1st apartment from north at east
Sep 17, 2025 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective base cabinet at sink in the kitchen located at apt 1a, 1st story, 1st apartment from north at east
Sep 17, 2025 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead paint that is xrf tested inconclusive at 0.5 mg/cm2 (28 rcny §11-07(b)) from required window and/or door friction surfaces and make floors smooth and cleanable, in an apartment with a child under six located at apt 1a, 1st story, 1st apartment from north at east
Aug 1, 2025 · Apt 1A
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at the sink in the kitchen located at apt 1a, 1st story, 1st apartment from north at east
Aug 1, 2025 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective marble saddle at the entrance in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
Aug 1, 2025 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at north, east and west walls in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
Aug 1, 2025 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood base cabinet under the sink in the kitchen located at apt 1a, 1st story, 1st apartment from north at east
Aug 1, 2025 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from south at west wall in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
Aug 1, 2025 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 5th room from east located at apt 1a, 1st story, 1st apartment from north at east
Aug 1, 2025 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1a, 1st story, 1st apartment from north at east
Aug 1, 2025 · Apt 1A
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, north wall, south wall, west wall in the kitchen located at apt 1a, 1st story, 1st apartment from north at east
Aug 1, 2025 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall, 1st window frame from west at north wall in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
Aug 1, 2025 · Apt 1A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd private hallway from east, the foyer located at apt 1a, 1st story, 1st apartment from north at east
Aug 1, 2025 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at the north wall in the 5th room from east located at apt 1a, 1st story, 1st apartment from north at east
Aug 1, 2025 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall, 1st door from north at east wall, north wall, baseboard at north wall, east wall, 1st window frame from west at north wall, baseboard at east wall, 1st door frame from north at east wall in the 5th room from east located at apt 1a, 1st story, 1st apartment from north at east
Aug 1, 2025 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall, ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
Aug 1, 2025 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from east at south wall in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
Aug 1, 2025 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from west at north wall in the kitchen located at apt 1a, 1st story, 1st apartment from north at east
Aug 1, 2025 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
Aug 1, 2025 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective spring balance on the lower window sash at north wall in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
Aug 1, 2025 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective spring balances on the lower and upper window sash at north wall in the kitchen located at apt 1a, 1st story, 1st apartment from north at east
Aug 1, 2025 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood saddle at the entrance in the kitchen located at apt 1a, 1st story, 1st apartment from north at east
Aug 1, 2025 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame in the 5th room from east located at apt 1a, 1st story, 1st apartment from north at east
Aug 1, 2025 · Apt 1A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the kitchen located at apt 1a, 1st story, 1st apartment from north at east
Apr 25, 2025 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
Apr 25, 2025 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective silicone caulk at tiles around bathtub in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
Apr 25, 2025 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective silicone caulk at tiles around washbasin in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
Apr 25, 2025 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
Apr 25, 2025 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2024
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall stairs, 5th story
Dec 27, 2023
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall stairs, 5th story
Dec 27, 2023
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at cieliing and south wall in the private hallway located at apt 5c, 5th story, 1st apartment from east at south
Dec 27, 2023 · Apt 5C
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak above ceiling in the private hallway located at apt 5c, 5th story, 1st apartment from east at south
Dec 27, 2023 · Apt 5C
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective counter balance at lower sash window at south wall in the kitchen located at apt 5c, 5th story, 1st apartment from east at south
Dec 27, 2023 · Apt 5C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5c, 5th story, 1st apartment from east at south
Dec 27, 2023 · Apt 5C
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5c, 5th story, 1st apartment from east at south
Dec 27, 2023 · Apt 5C
Open — Notice of issuance sent to tenant - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Closed — Violation dismissed - CImmediately hazardous
Replace the broken or defective wash basin with jagged edges in the bathroom located at apt 4c, 4th story, 1st apartment from east at south
Jul 13, 2022 · Apt 4C
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective ceramic tiles at south wall. in the bathroom located at apt 4c, 4th story, 1st apartment from east at south
Jul 13, 2022 · Apt 4C
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 1st room from east located at apt 4c, 4th story, 1st apartment from east at south
Jul 13, 2022 · Apt 4C
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches located at apt 4c, 4th story, 1st apartment from east at south
Jul 13, 2022 · Apt 4C
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective ceramic tiles at floor. in the bathroom located at apt 4c, 4th story, 1st apartment from east at south
Jul 13, 2022 · Apt 4C
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4c, 4th story, 1st apartment from east at south
Jul 13, 2022 · Apt 4C
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from east located at apt 4c, 4th story, 1st apartment from east at south
Jul 13, 2022 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of free standing cast iron radiator at public hall, 1st story
Feb 10, 2022
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner at balcony at front stack at fire escape, 4th story
Feb 10, 2022
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from west at north wall in the bathroom located at apt 4a, 4th story, 1st apartment from north at east
Dec 14, 2021 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 1st room from east located at apt 4a, 4th story, 1st apartment from north at east
Dec 14, 2021 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from west at north wall in the 1st room from east located at apt 4a, 4th story, 1st apartment from north at east
Dec 14, 2021 · Apt 4A
Closed — Violation closed
DOB building violations · 16
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 10, 2018
Dob violation - dismissed - Construction other optional
Boro-comm
May 16, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 13, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 16, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 16, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 16, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 28, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 16, 2008
Dob violation - active
Show 6 more ↓
- Construction other optional
C-construction other optional
Dec 11, 2008
Dob violation - active - Construction other optional
C-construction other optional
Dec 5, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Construction other optional
C-construction other optional
May 30, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 31
- Class - 1
Filed a certificate form application etc,containing a material false statements under job app#140699894. the owner/representatives made false certifications sec#26 on the pw1"no"is cheacked off for owners certi
Oct 4, 2017 · Penalty $24,000
Active - Class - 1
Unapproved/unsafe/unsuitable electrical equipments,apparatus,materials,devices,appliances or wiring in use. the entire apt 2a defective wiring are in use. circuit are missing defective receptacles outlets are
Apr 4, 2016 · Penalty $400
Resolve - Class - 2
Electrical work w/o a permit. circuit breaker panel installed,risers,conduit,pull boxes. remedy: obtain permit.
Mar 11, 2016
Resolve - Class - 1
Failure to comply with the commissioner's order contained in nov#35146985n issued on 8/25/2015 and to file a certificate of correction pursuant to 28-201.1 28-204.4 an d1rcny 102-01.rem:comply with the commissi
Jan 21, 2016
Resolve - Class - 2
Residence altered as a dwelling for more than the # of families legally authorized by th c of o or official records.note records indicate to be 24 units now @cellar level converted to 5 sros making it to 29 uni
Oct 22, 2015 · Penalty $1,200
Resolve - Class - 1
Work without a permit.work noted:at supers apartment created into 4 sro's with partitions and installation of doors with locking devices on all doors.remedy:obtain all required permits.
Oct 22, 2015
Resolve - Class - 1
Electrical work w/o a permit. the entire apt 2b: sub panel,branch circuit wiring,receptacles outlets,switches,lighting fixtures. not on filez151345,z149090 does not covered the above work. remedy: obtain permit
Sep 21, 2015 · Penalty $800
Active - Class - 1
Unapproved/unsafe/unsuitable electrical equipment,appliances or wiringin use. outdoor & bsmt entire: open defective wiring are in use,armored cables used outside,armored cables are not secured,armplied cables
Sep 21, 2015 · Penalty $1,600
Active - Class - 1
Electrical work w/o a permit. the entire hallways: branch circuit wiring,receptacles outlets,lighting fixtures. not on file on going work inprogress. z151345,z149090 does not covered the above work. remedy: obt
Sep 21, 2015 · Penalty $800
Active - Class - 2
Failure to comply w/the comm's order to file c of c w/the dob's for notice of vio #35115081z issued on 2/20/14 pursuant to 28-204.4 & 1rcny 102-01. no c of c summited to correct violation conditions.
Apr 19, 2015 · Penalty $4,000
Resolve
Show 21 more ↓
- Class - 1
Stop work!! work w/o permit work noted: i observed at 12pm gas line for apt 5e,4e,3e,2e was removed w/no permit filed with dob. la for this work #121878806 is in pre-file (1/30/2015 not approved).rmdy:obta
Feb 20, 2015 · Penalty $800
Resolve - Class - 2
Sidewalk shed parapet sign panel not in compliance with section.noted:@ time of insp.parapet sign panel for sidewalk sued does not contain:1the street address of the site.2.name of the contractor responsible fo
Dec 31, 2014 · Penalty $400
Resolve - Class - 1
Failure to comply w/ comm's order to correct conditions cited in nov#34587476m for work w/o permit in apts 3a,3b.rem:comply w/ order.
Jan 21, 2011 · Penalty $6,000
Resolve - Class - 2
B254,16,21c,48a,b,50a,b,c,d. 50a- soot on boiler. 50b- oil line must be secured. 50c- shut off valve missing on top of oil tamk & antisyphon valve.50d- repair/replace clean out door at base of chimney has hole
Jan 11, 2011 · Penalty $500
Active - Class - 1
Unlawful acts.failure to comply with an order of the commissioner.noted:respondent failed to correct the conditions cited in the prior nov#34587476m.swo issued for work w/o permit in apts#3a & #3b.rem:comply w
Nov 3, 2010 · Penalty $6,000
Resolve - Class - 1
Unlawful acts.failulre to comply w/an order of the coomissioner.resp'd failed to correct the conditions cited in the prior nov#34587476m.swo issued for work w/o permit in apts. #3a & 3b.remedy:comply w/commissi
Sep 9, 2010 · Penalty $6,000
Resolve - Class - 1
Failure to comply w/an order of the commissioner. note: respondent failed to correct the conditions cited in prior swo 080807e1hdb02 (nov 34587476m) for work w/o a permit in apt #3a & 3b. no record of permits
May 29, 2010 · Penalty $24,000
Resolve - Class - 2
Failure to maintain bldg walls or appurt note,metal corniol on southside is in dispair with open,missing sections , metal deteriorations.remedy:maintain, repair
Jan 12, 2010 · Penalty $5,000
Resolve - Class - 1
Unlawful acts. failure to comply with an order of the commissioner. note: respondent failed to correct the conditions citied in the prior swo080807e1hdb02 work without a permit in apt 3a & 3b. work was complet
Dec 19, 2009 · Penalty $2,400
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances. defect noted: bldg having deteriorated, rusted throughout east side approx 25'long metal cornice w/hanging over public sidewalk sheet metal approx 8" x 3' in
Aug 3, 2009 · Penalty $5,000
Resolve - Class - 1
Unlawful continued work while on notice of stop work order. noted: at time of inspection above premises swo 080807c12db02 & 12038c12db02 were not rescinded for work in apts 3a & 3b work has been completed in
Jul 14, 2009 · Penalty $24,000
Active - Class - 2
Failure to maintain bldg in code compliant manner. noted: roof top down spout terminates on roof above apt 5e where clogged roof drain causes water to pool on roof same violating conditions cited in ecb #
Jun 22, 2009 · Penalty $500
Resolve - Class - 2
Failure to comply w/ commissioners order to correct violating condition cited in ecb 34709066m which cites clogged roof drain above apt 5e observed leader terminating on roof above apt 5e where water pooled due
Jun 22, 2009 · Penalty $4,000
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work ordernoted a t time of insp stop work order 080807c12db02 for apt 3a & 3b in effect observed 2 labdrers in apt 3b lites and music on in apt 3a contrary t
Dec 3, 2008 · Penalty $24,000
Active - Class - 1
Failure to provide unobstructed exit passageway noted primary exit passage for soper and any other residing basement and secondary means for remainder of bldg partially blocked by demolition debris plaster
Dec 3, 2008 · Penalty $1,200
Resolve - Class - 2
Failure to maintain bldg in a code compliant manner. there is no drainor clogged drain on roof above apt #5e & water is accumulating on roofthat can cause roof to fail. remedy: repair and/or replace roof drain.
Oct 8, 2008 · Penalty $500
Resolve - Non-hazardous
Occupancy contrary to dob records noted: building details registrationcard for bldg 6284 allows for a total of 24 class a units on 5 fls w/storage boiler and mechanical rooms in basement observed 1 class a apt
May 22, 2008
Resolve - Non-hazardous
Stop all work. work w/o permit noted: at time of inspection observed 1class a apt in basement registration card stipulated 24 class a units on 5 flr w/ storage boiler and mechanical rooms in basement work 100%
May 22, 2008
Resolve - Hazardous
Failure to maintain exterior defects noted:exterior pane of double sasa is broken with loose pieces window is in court yard of bldg directlyabove stairway posining inninent threat to persons on stairs remedy:
Dec 26, 2007 · Penalty $2,500
Resolve - Hazardous
Work w/o a permit-hazardous. noted: work performed in apts 3a & 3b tools & three workers present no fire rated materials exposed on 70% of ceiling in 3a exposed non fired rated materials on 50% of walls in 3a.
Aug 8, 2007 · Penalty $800
Resolve - Non-hazardous
Occupancy contrary to that allowed by building department records. from legal use: cellar to illegal ue: travel office location: cellar. remedy: discontinue illegal use or amend a c of o.
Dec 23, 1997 · Penalty $400
Resolve
Complaints
- Unsanitary condition
Pests
Sep 15, 2025 · Apt 1A
Close - Flooring/stairs
Floor
Sep 15, 2025 · Apt 1A
Close - Plumbing
Basin/sink
Sep 15, 2025 · Apt 1A
Close - Unsanitary condition
Mold
Sep 15, 2025 · Apt 1A
Close - Paint/plaster
Door/frame
Sep 15, 2025 · Apt 1A
Close - Paint/plaster
Wall
Sep 15, 2025 · Apt 1A
Close - Paint/plaster
Wall
Sep 15, 2025 · Apt 1A
Close - Plumbing
Basin/sink
Jul 24, 2025 · Apt 1A
Close - Door/window
Window pane
Jul 24, 2025 · Apt 1A
Close - Flooring/stairs
Floor
Jul 24, 2025 · Apt 1A
Close
Show 40 more ↓
- Paint/plaster
Wall
Jul 24, 2025 · Apt 1A
Close - Paint/plaster
Wall
Jul 24, 2025 · Apt 1A
Close - Appliance
Electric/gas range
Apr 22, 2025 · Apt 1A
Close - Paint/plaster
Wall
Apr 8, 2025 · Apt 1A
Close - Plumbing
Water supply
Jan 19, 2025 · Apt 2D
Close - Plumbing
Water supply
Jan 19, 2025 · Apt BLDG
Close - Plumbing
Water supply
Jan 18, 2025 · Apt 3D
Close - Plumbing
Water supply
Jan 18, 2025 · Apt 3B
Close - Water leak
Damp spot
May 20, 2024 · Apt 1C
Close - Paint/plaster
Ceiling
May 20, 2024 · Apt 1C
Close - Heat/hot water
Entire building
Jan 22, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 22, 2023 · Apt BLDG
Close - Paint/plaster
Ceiling
Sep 10, 2023 · Apt 1C
Close - Paint/plaster
Ceiling
Sep 10, 2023 · Apt 1C
Close - Heat/hot water
Entire building
Mar 18, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 11, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 4, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 25, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 24, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 11, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 7, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 5, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 8, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 8, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 8, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 7, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 6, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 6, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 30, 2022 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1911
- Floors
- 5
- Residential units
- 24
- Building area
- 22,385 ft²
- Lot area
- 5,375 ft²
- Zoning
- R7-2
- Community board
- 112
- Council district
- 10
- Block / lot
- 2126 / 28
- Assessed value
- $672,300
- Landmark / historic district
- No
HPD registration #106504, last renewed Jul 16, 2025.
Questions about 525 West 169 Street
Who owns 525 West 169 Street?
The owner of record in NYC Department of City Planning PLUTO data is Audubon 79 LLC.
Does 525 West 169 Street have violations?
Yes. NYC HPD has recorded 454 housing violations at this property.
Is 525 West 169 Street rent stabilized?
NYC Department of Finance tax bills listed 20 rent-stabilized units here in 2024 (about 83% of its 24 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 525 West 169 Street built?
City records list 1911 as the year it was built.
How many apartments are in 525 West 169 Street?
It has 24 residential units and 26 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.