2472 Adam C Powell Blvd
Manhattan, NY 10030BBL 1-02029-0035Map
Owner of record: Dorie Miller Housing Development Fund Co Mpany, INC
2472 Adam C Powell Blvd is a walk-up apartment building built in 1920 in Manhattan, 10030. It has 8 residential units across 5 floors. The owner of record is Dorie Miller Housing Development Fund Co Mpany, INC. HPD has recorded 160 housing violations here, most recently on April 29, 2026. 24 of the 50 most recent violations are still open. City tax records listed 8 rent-stabilized apartments here in 2024.
- HPD violations
- 160
- DOB violations
- 18
- ECB violations
- 17
- HPD complaints
- 24
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 160
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance at lower sash window at west wall in the bathroom located at apt 4a, 4th story, 1st apartment from north at east
Nov 30, 2025 · Apt 4A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective door at entrance in the bathroom located at apt 4a, 4th story, 1st apartment from north at east
Nov 30, 2025 · Apt 4A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 4a, 4th story, 1st apartment from north at east
Nov 30, 2025 · Apt 4A
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at window opening at west wall in the bathroom located at apt 4a, 4th story, 1st apartment from north at east
Nov 30, 2025 · Apt 4A
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 4a, 4th story, 1st apartment from north at east
Nov 30, 2025 · Apt 4A
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective door at closet at north wall in the foyer located at apt 4a, 4th story, 1st apartment from north at east
Nov 30, 2025 · Apt 4A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective door at closet at west wall in the 1st room from east at south located at apt 4a, 4th story, 1st apartment from north at east
Nov 30, 2025 · Apt 4A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4a, 4th story, 1st apartment from north at east
Nov 30, 2025 · Apt 4A
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4a, 4th story, 1st apartment from north at east
Nov 30, 2025 · Apt 4A
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective electrical light fixture at ceiling in the bathroom located at apt 5a, 5th story, 1st apartment from north at east
Jul 3, 2025 · Apt 5A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical light fixture at ceiling in the 2nd room from north at east located at apt 5a, 5th story, 1st apartment from north at east
Jul 3, 2025 · Apt 5A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the bathroom , the kitchen located at apt 5a, 5th story, 1st apartment from north at east
Jul 3, 2025 · Apt 5A
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over the ceiling in the foyer located at apt 5a, 5th story, 1st apartment from north at east
Jul 3, 2025 · Apt 5A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical light fixture at ceiling in the kitchen located at apt 5a, 5th story, 1st apartment from north at east
Jul 3, 2025 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east
Jun 2, 2024 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at basement
Jun 2, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3b, 3rd story, 1st apartment from north at east
Jun 2, 2024 · Apt 3B
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the foyer located at apt 5a, 5th story, 1st apartment from north at east
Mar 7, 2024 · Apt 5A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 5a, 5th story, 1st apartment from north at east
Mar 7, 2024 · Apt 5A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the foyer located at apt 5a, 5th story, 1st apartment from north at east
Mar 7, 2024 · Apt 5A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 5a, 5th story, 1st apartment from north at east
Mar 7, 2024 · Apt 5A
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 5a, 5th story, 1st apartment from north at east
Mar 7, 2024 · Apt 5A
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 5a, 5th story, 1st apartment from north at east
Mar 7, 2024 · Apt 5A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the foyer located at apt 5a, 5th story, 1st apartment from north at east
Mar 7, 2024 · Apt 5A
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
May 11, 2022 · Apt 2B
Open — First no access to re- inspect violation - BHazardous
Repair or replace the smoke detector inoperable in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
May 11, 2022 · Apt 2B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperable in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west
May 11, 2022 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 5, 2018
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective paving concrete at buildings front entrance
Sep 26, 2018
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 24, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 1, 2015
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at cellar.
Aug 27, 1998
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing 1 sty public hall.
Aug 27, 1998
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Aug 27, 1998
Closed — Violation closed - ANon-hazardous
Paint or post a sign indicating floors all stys public hall.
Aug 27, 1998
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective terra cotta coping west parapet wall roof.
Aug 27, 1998
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors door at 5 sty bulkhead roof.
Aug 27, 1998
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the west court.
Aug 27, 1998
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the east areaway.
Oct 16, 1997
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over 5 sty public hall ceiling.
Oct 16, 1997
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes 5 sty rear west stack clothes and rubbish.
Oct 16, 1997
Closed — Violation closed - ANon-hazardous
§ 62 m/d law rearrange television and/or radio antenna to be at least 10 feet above roof and not attached to any fire escape or soil or vent line wires attached to gooseneck ladder at rear west stack.
Oct 16, 1997
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the west areaway.
Oct 16, 1997
Closed — Violation closed - BHazardous
Replace with new the broken or defective door knob at entrance door to 1 sty public hall.
Oct 16, 1997
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors bulkhead door to roof.
Oct 16, 1997
Closed — Violation closed - ANon-hazardous
Paint or post a sign indicating floors sign missing 1 sty public hall thru 5 sty public hall.
Oct 16, 1997
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant walls and ceiling thru out public hall all stys.
Oct 16, 1997
Closed — Violation closed
DOB building violations · 18
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 21, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 21, 2016
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Construction other optional
Failure to maintain building
Aug 31, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed
Show 8 more ↓
- Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Mar 11, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Apr 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed
ECB violations · 17
- Class - 1
Unlawfull continence: failure to comply w/an order of the commissionerto stop work. noted: job#121561318,vi#35155757x issued on 12/9/15 w/partial stop work order to provide guardrails,remove debris no other wor
Apr 14, 2016 · Penalty $2,400
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations.@ the time of inspection it was observed that the site was unsafe & work was in operation.there was no egress & guardrail around o
Dec 9, 2015 · Penalty $6,000
Resolve - Class - 2
Failure to provide approved/accepted plans @ jobsite @ time of inspection.@ the time of inspection it was observed that the plans was not approved.there was no stamp on the structural plans @ time of inspection
Dec 9, 2015 · Penalty $2,500
Resolve - Class - 1
3303.11 failure to maintain or to provide adequate alternatives to required egress during construction operation in existing bldg.@ the timeof inspection it was observed that there was no egress provide from 2
Dec 9, 2015 · Penalty $8,000
Resolve - Class - 1
3301.2 failure to provide 3ft 6in guard rail or equivalent around all fl & perimeter openings.@ the time of inspection there was no guardrails around the open fls @ the 1st,2nd,3rd & 4th fl level.there was no g
Dec 9, 2015 · Penalty $8,000
Resolve - Class - 2
Pedestrian protection does not meet code specifications. noted: at time of inspection underside lights for sidewalk shed at exp #1 & #4 are not lit. time of inspection 5:30pm. remedy: comply with code.
Nov 18, 2014
Resolve - Class - 2
Temporary construction equipment on site - expired permit. noted: at time of inspection permit for sidewalk shed at exp #1 & #4 expired on 09/16/14. remedy: comply with code / renew all required permits.
Nov 18, 2014
Resolve - Class - 2
Sidewalk shed parapet sign panel not in compliance with section. noted: at time of inspection parapet sign for sidewalk shed does not contain: 1)street address of the site. 2)the name of the contractor responsi
Nov 18, 2014
Resolve - Class - 2
Ec590.8 wires for sidewalk shed lighting not installed in metal race- way as per code. noted upon inspection of sidewalk shed, exposed wiring at exp @, wire is loose and only protected by plastic romex covering
Aug 6, 2013
Resolve - Class - 1
Erected or installed supported scaffold 40' or higher w/o permit.notedsupported scaffold installed at exp1 and exp2,approx 50'high with a dob permit. rmdy: comply w/code.
Aug 6, 2013
Resolve
Show 7 more ↓
- Class - 1
Bc3314 - supported scaffold does not meet dob specifications. missing guardrails, end rails; ripped netting. remedy: comply with code
Mar 5, 2013
Resolve - Class - 2
Work w/o permit. no permit for supported scaffold at exp#1,4. remedy: comply with code.
Mar 5, 2013
Resolve - Class - 2
Work w/o permit. shed installed at site has no permit. shed installe d at exp #1,4. remedy: comply with code.
Mar 5, 2013
Resolve - Class - 2
Fail to provide required signage & information on sidewalk shed. notedmissing permit # & missing expiration date on sign. remedy: provide information as per code.
Jan 17, 2009
Resolve - Class - 2
Fail to maintain sidewalk shed in that the underside of the shed shallbe illuminated at all times- no lights at time of inspection 10:35 pm.remedy: maintain sidewalk shed as per code.
Jan 17, 2009
Resolve - Non-hazardous
B4a,16,24b,32a,36,39,40,48a,50,50a,50b,50c,bq9,50d/bq9-new boiler installed, never registered, permit expired/50-dabris in boiler rm/50a-steam pipe leaking into boiler rm & infront bsmt
Jun 7, 2006
Resolve - Non-hazardous
Failure to maintain interior bldg. (haz). defects noted: n/s lines to apts. two thru 5th fls in disrepair uneven & sloping. also noted handrail unstable on 2nd & 3rd fl noted. in cellar busted steam pipe creati
Mar 27, 2006
Resolve
Complaints
- Paint/plaster
Wall
Nov 26, 2025 · Apt 4A
Close - Unsanitary condition
Mold
Nov 26, 2025 · Apt 4A
Close - Door/window
Door
Nov 26, 2025 · Apt 4A
Close - Plumbing
Bathtub/shower
Nov 26, 2025 · Apt 4A
Close - Electric
No lighting
Sep 18, 2025 · Apt 5A
Close - Plumbing
Bathtub/shower
Aug 19, 2025 · Apt 4A
Close - Door/window
Window frame
Aug 19, 2025 · Apt 4A
Close - Unsanitary condition
Mold
Aug 19, 2025 · Apt 4A
Close - Door/window
Door
Aug 19, 2025 · Apt 4A
Close - Electric
No lighting
Jun 26, 2025 · Apt 5A
Close
Show 14 more ↓
- Water leak
Damp spot
Jun 26, 2025 · Apt 5A
Close - Heat/hot water
Entire building
Jun 1, 2024 · Apt BLDG
Close - Water leak
Slow leak
Feb 26, 2024 · Apt 5A
Close - Heat/hot water
Entire building
Nov 10, 2023 · Apt 2B
Close - Heat/hot water
Entire building
Nov 10, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 3, 2023 · Apt BLDG
Close - Water leak
Heavy flow
Sep 29, 2023 · Apt 5B
Close - Water leak
Slow leak
Sep 29, 2023 · Apt 5B
Close - Electric
Lighting
Sep 29, 2023 · Apt 5B
Close - Unsanitary condition
Pests
May 2, 2022 · Apt 2B
Close - Paint/plaster
Wall
May 2, 2022 · Apt 2B
Close - Unsanitary condition
Pests
May 2, 2022 · Apt 2B
Close - Paint/plaster
Ceiling
Jan 11, 2020 · Apt 5A
Close - Paint/plaster
Ceiling
Jun 19, 2019 · Apt 5A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1920
- Floors
- 5
- Residential units
- 8
- Building area
- 7,126 ft²
- Lot area
- 1,875 ft²
- Zoning
- R7-2
- Community board
- 110
- Council district
- 9
- Block / lot
- 2029 / 35
- Assessed value
- $588,600
- Landmark / historic district
- No
HPD registration #119696, last renewed Jul 18, 2025.
Questions about 2472 Adam C Powell Blvd
Who owns 2472 Adam C Powell Blvd?
The owner of record in NYC Department of City Planning PLUTO data is Dorie Miller Housing Development Fund Co Mpany, INC.
Does 2472 Adam C Powell Blvd have violations?
Yes. NYC HPD has recorded 160 housing violations at this property.
Is 2472 Adam C Powell Blvd rent stabilized?
NYC Department of Finance tax bills listed 8 rent-stabilized units here in 2024 (about 100% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2472 Adam C Powell Blvd built?
City records list 1920 as the year it was built.
How many apartments are in 2472 Adam C Powell Blvd?
It has 8 residential units and 9 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.