roofy

2460 Adam C Powell Blvd

Manhattan, NY 10030BBL 1-02029-0029Map

Owner of record: 2460 7th Avenue HDFC

2460 Adam C Powell Blvd is an elevator apartment building built in 1950 in Manhattan, 10030. It has 52 residential units across 7 floors. The owner of record is 2460 7th Avenue HDFC. HPD has recorded 140 housing violations here, most recently on September 30, 2026. 47 of the 50 most recent violations are still open.

HPD violations
140
DOB violations
62
ECB violations
27
HPD complaints
104

What to know

Concern
6 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 30, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 140

  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 71, 7th story, 1st apartment from north at east

    Sep 30, 2026 · Apt 71

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 7, 1st story, 3rd apartment from east at south

    Sep 12, 2026 · Apt 7

    Open — Notice of issuance sent to tenant
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 7, 1st story, 3rd apartment from east at south

    Sep 12, 2026 · Apt 7

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation radiator cover in the bathroom located at apt 7, 1st story, 3rd apartment from east at south

    Sep 12, 2026 · Apt 7

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department upper wood cabinet at west and north wall in the kitchen located at apt 7, 1st story, 3rd apartment from east at south

    Sep 12, 2026 · Apt 7

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all walls in the kitchen located at apt 7, 1st story, 3rd apartment from east at south

    Sep 12, 2026 · Apt 7

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 7, 1st story, 3rd apartment from east at south

    Sep 12, 2026 · Apt 7

    Open — Nov sent out
  • A

    Refit entrance door in the 3rd room from north located at apt 7, 1st story, 3rd apartment from east at south

    Sep 12, 2026 · Apt 7

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department ceiling and all walls in the 3rd room from north located at apt 7, 1st story, 3rd apartment from east at south

    Sep 12, 2026 · Apt 7

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department ceiling and all walls in the 4th room from north located at apt 7, 1st story, 3rd apartment from east at south

    Sep 12, 2026 · Apt 7

    Open — Nov sent out
Show 40 more ↓
  • C

    Properly repair with similar material the broken or defective wood floor in the 4th room from north located at apt 7, 1st story, 3rd apartment from east at south

    Sep 12, 2026 · Apt 7

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at west wall in the 4th room from north located at apt 7, 1st story, 3rd apartment from east at south

    Sep 12, 2026 · Apt 7

    Open — Notice of issuance sent to tenant
  • A

    Refit closet door at west wall in the private hallway located at apt 7, 1st story, 3rd apartment from east at south

    Sep 12, 2026 · Apt 7

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department ceiling, east and north walls in the private hallway located at apt 7, 1st story, 3rd apartment from east at south

    Sep 12, 2026 · Apt 7

    Open — Nov sent out
  • C

    Replace with new the missing wood floor in the private hallway located at apt 7, 1st story, 3rd apartment from east at south

    Sep 12, 2026 · Apt 7

    Open — Nov sent out
  • A

    Refit entrance door in the 2nd room from north located at apt 7, 1st story, 3rd apartment from east at south

    Sep 12, 2026 · Apt 7

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department ceiling and all walls in the 2nd room from north located at apt 7, 1st story, 3rd apartment from east at south

    Sep 12, 2026 · Apt 7

    Open — Nov sent out
  • A

    Refit entrance door in the 1st room from north located at apt 7, 1st story, 3rd apartment from east at south

    Sep 12, 2026 · Apt 7

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 7, 1st story, 3rd apartment from east at south

    Sep 12, 2026 · Apt 7

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department ceiling and all walls in the 1st room from north located at apt 7, 1st story, 3rd apartment from east at south

    Sep 12, 2026 · Apt 7

    Open — Nov sent out
  • C

    Replace with new the missing wood floor in the 7th room from north located at apt 7, 1st story, 3rd apartment from east at south

    Sep 12, 2026 · Apt 7

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all walls in the 7th room from north located at apt 7, 1st story, 3rd apartment from east at south

    Sep 12, 2026 · Apt 7

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 7, 1st story, 3rd apartment from east at south

    Sep 12, 2026 · Apt 7

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the private hallway located at apt 7, 1st story, 3rd apartment from east at south

    Sep 12, 2026 · Apt 7

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 7, 1st story, 3rd apartment from east at south

    Sep 12, 2026 · Apt 7

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 7th room from north located at apt 7, 1st story, 3rd apartment from east at south

    Sep 12, 2026 · Apt 7

    Open — Nov sent out
  • C

    Provide a safe and adequate supply of electric service to the fixtures at ceiling and all walls in the entire apartment located at apt 7, 1st story, 3rd apartment from east at south

    Sep 12, 2026 · Apt 7

    Closed — Violation closed
  • A

    Repair the broken or defective connection at waste line pipe under sink in the kitchen located at apt 7, 1st story, 3rd apartment from east at south

    Sep 12, 2026 · Apt 7

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 7, 1st story, 3rd apartment from east at south

    Sep 12, 2026 · Apt 7

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood base cabinet at sink in the kitchen located at apt 7, 1st story, 3rd apartment from east at south

    Sep 12, 2026 · Apt 7

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing located at apt 26, 2nd story, 1st apartment from east at south

    Sep 10, 2026 · Apt 26

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing located at apt 26, 2nd story, 1st apartment from east at south

    Sep 10, 2026 · Apt 26

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 2nd room from east located at apt 76, 7th story, 1st apartment from south at west

    Jun 2, 2026 · Apt 76

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective water leak at boiler at boiler room

    May 13, 2026

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective light fixture at ceiling in the 2nd room from east at north located at apt 71, 7th story, 1st apartment from north at east

    Mar 6, 2026 · Apt 71

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 71, 7th story, 1st apartment from north at east

    Mar 6, 2026 · Apt 71

    Open — Notice of issuance sent to tenant
  • B

    Properly repair or replace the broken or defective light fixture at ceiling in the 3rd room from east at south located at apt 71, 7th story, 1st apartment from north at east

    Mar 6, 2026 · Apt 71

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from east located at apt 71, 7th story, 1st apartment from north at east

    Mar 6, 2026 · Apt 71

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective light fixture at ceiling in the 1st room from east located at apt 71, 7th story, 1st apartment from north at east

    Mar 6, 2026 · Apt 71

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective light fixture at ceiling in the 5th room from east located at apt 71, 7th story, 1st apartment from north at east

    Mar 6, 2026 · Apt 71

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak over ceiling in the 5th room from east located at apt 71, 7th story, 1st apartment from north at east

    Mar 6, 2026 · Apt 71

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 5th room from east located at apt 71, 7th story, 1st apartment from north at east

    Mar 6, 2026 · Apt 71

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak above ceiling in the 4th room from east located at apt 71, 7th story, 1st apartment from north at east

    Feb 25, 2026 · Apt 71

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 4th room from east located at apt 71, 7th story, 1st apartment from north at east

    Feb 25, 2026 · Apt 71

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective electrical outlet at west wall in the 4th room from east located at apt 71, 7th story, 1st apartment from north at east

    Feb 25, 2026 · Apt 71

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the 4th room from east located at apt 71, 7th story, 1st apartment from north at east

    Feb 25, 2026 · Apt 71

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 61, 6th story, 1st apartment from north at east

    Jan 28, 2026 · Apt 61

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak above ceiling in the 3rd room from north located at apt 71, 7th story, 3rd apartment from south at west

    Dec 3, 2025 · Apt 71

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from north located at apt 71, 7th story, 3rd apartment from south at west

    Dec 3, 2025 · Apt 71

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 6th room from east located at apt 71, 7th story, 1st apartment from north at east

    Aug 26, 2025 · Apt 71

    Open — Nov sent out

DOB building violations · 62

  • Construction other optional

    Emergency work order due to numerous vertical cracks also deterioratin g and spalling brick masonry at exposure 3 west elevation above parking lot and pedestrian walk way. remedy:immediately provide safety measures at exposure 3 to protect pedestrian walk way and parking lot under direction of a licensed professional

    May 11, 2026

    Dob violation - active
  • Construction other optional

    Failure to maintain building in a code compliant manner as per section 28.301.1 of the nyc admin code. as noted at time of inspection observe at exposure 3 numerous vertical cracks east of exposure 3 deteriorating and spalling masonry. remedy: repair and replace

    May 11, 2026

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2024

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2024

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2024

    Dob violation - active
  • Failure to correct swarmp conditions (facade) facade required

    Cycle 9a failure to correct swarmp conditions

    Mar 3, 2022

    Dob violation - active
  • Hazardous condition (facade) facade required

    Cycle 9a unsafe report filed

    Mar 3, 2022

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2019

    Jun 29, 2020

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 5, 2019

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
Show 40 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 17, 2017

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 29, 2016

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2015

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2015

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2015

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst

    May 30, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 18, 2012

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2012

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2010 inspection/test

    Dec 13, 2011

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 21, 2011

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 21, 2011

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Feb 27, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 17, 2008

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Mar 21, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Apr 2, 2007

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 19, 2006

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Elevator elevatorrequired

    1p10118

    Mar 27, 2003

    Dob violation - resolved
  • Elevator elevatorrequired

    1p10118

    Dec 12, 2002

    Dob violation - resolved
  • Facade facade required

    L1198-local law 11/98 - facade facade required

    Aug 8, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Feb 19, 2002

    Dob violation - dismissed
  • Elevator elevatorrequired

    1p10118

    May 9, 2001

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Mar 8, 2001

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Mar 10, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Elevator elevatorrequired

    1p10118

    Feb 1, 2000

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 20, 1999

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 6, 1998

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 13, 1997

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 13, 1997

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Jun 28, 1996

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Mar 8, 1996

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed

ECB violations · 27

  • Class - 2

    Misaligned cab mirror. replace worn gibs where needed. provide in case of fire signs. proivde explicitly detailed info on how/where to obtain keys to machine room.

    Jun 6, 2024 · Penalty $3,125

    Active
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/ code provisions periodic insp of exterior walls and appurtenances as required by article 28.302 and the dob rules and regulations rem:

    Jun 4, 2010

    Resolve
  • Class - 2

    Fail to maintain sidewalk shed- in that the underside of the sidewalk shed shall be illuminated at all times no lights at time of inspection10:30 pm. remedy: maintain sidewalk shed as per code.

    Jan 17, 2009

    Resolve
  • Class - 2

    Failure to submit an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations

    Jan 16, 2009

    Resolve
  • Class - 2

    Licensed rigger failed to ensure scaffold worker met minimum requirements. (no cert of fitness) remedy: comply w/ code.

    Oct 31, 2008 · Penalty $400

    Resolve
  • Class - 1

    Unlawfully continued work while on notice of a stop work order @ removed equipment ( rope scaffola) swo # 573 remedy:comply with stop work order

    Sep 5, 2008 · Penalty $4,800

    Resolve
  • Class - 1

    Inadequate safety measures: operation of hoisting equipment in unsafe manner! a one one (1) tie back for (2) two "c" hooks- rem: discontinueuse.

    Aug 26, 2008 · Penalty $4,800

    Resolve
  • Class - 1

    Failure to perform safe/proper inspection of suspended scaffold- a-all mut's on j-bolts were loose. rem: conform to safety regulation.

    Aug 26, 2008 · Penalty $10,000

    Resolve
  • Class - 1

    No record of daily inspection of suspended scaffold performed by authorized person site. maintain daily inspection records on site.

    Aug 26, 2008 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to notify depictment/obtain permit prior to use/ installation off "c" hooks/ outrigger beams in connection with suspended scaffold. 2- no notification for "c" hooks. rem: notify the department.

    Aug 26, 2008 · Penalty $400

    Resolve
Show 17 more ↓
  • Class - 1

    Supervision or use of rigging equipment without a riggers license. rem: obtain license

    Aug 26, 2008 · Penalty $4,800

    Resolve
  • Class - 1

    Erected or installed supported scaffold 40 feet or higher without a permit rem: obtain a permit

    Aug 26, 2008 · Penalty $1,200

    Resolve
  • Class - 1

    Provision of law bc 3314.3.1 copies of the plans, drawing, specification for au supports, fastenings, connection, and details shall be kept at the site and made available to the commissioner upon request. rem:

    Aug 26, 2008 · Penalty $400

    Resolve
  • Non-hazardous

    Failure to maintain exterior building wall. noted: (a) south wing 1) west elev (north end) over school and court yard window brick spandrels('a' line) step cracks and loose brick. 2) north east corner (along

    Oct 29, 2004

    Resolve
  • Non-hazardous

    2,b,10 5,j,10 15,m,7 16,i,10 83,p,7 39,i,10 38,o,2 34,q,3 39,q,3 39,o,2 60,r,9 55,y,2 55,y,2 83,u,15 3,x,10 11,d,6 83,l,10 5j10 too much gap between car door and car post 15m7 post certificate in car as per cod

    Sep 17, 2003

    Resolve
  • Hazardous

    52,i,11 29,b,10 30,b,10 83,u,15 55,y,10 11,d,06 38,o,02 34,q,03 60,r,09 64,i,10 39,q,03 16,p,16 26,u,15 52 gov ropes damaged about 2 ft wrapped with black 16 basement electrical tade 83-city id is # tags missin

    Jun 19, 2003 · Penalty $2,500

    Resolve
  • Non-hazardous

    73o2,73u16,35o2,37a12,35h4,46k12,10d6,1#1,30o2,32m7,22d6,57o2,57z9,29m7,74m7,74x12,15l12. -73 provide city i.d. tags on device, -37 replace contact on controller, -35 patch motor room ceiling worn out patch in

    Apr 15, 1999 · Penalty $2,500

    Resolve
  • Non-hazardous

    30o,46k,73u,35h,50f,57o,57z. provide city tag on device, patch motor rm code and path hole in front of main machine, replace contact cover on one of the block on controller, provide toe guard under car.

    Mar 24, 1999 · Penalty $2,500

    Resolve
  • Non-hazardous

    02l 08v 22y 14m 36t 37v 46h 52f 57o 74m 36&37 city id number and company logo 52 car stops hurd in down direction 74 provide fire exstinguisher in mr

    Oct 20, 1998

    Resolve
  • Non-hazardous

    73x11,22d6,46k10,57o2. -73x return back to service for complete inspection by this dept.

    Sep 16, 1998 · Penalty $2,500

    Resolve
  • Non-hazardous

    73o2. return elevator to proper working order so inspection can be performed.

    Nov 12, 1997 · Penalty $2,500

    Resolve
  • Non-hazardous

    Failure to maintain. bathroom ceiling joist header is rotted and defective. hazardous condition. location 5th fllor apt 56 make all necessary repairs.

    Jun 28, 1996

    Resolve
  • Non-hazardous

    47l,28h,57z,63l,75#,3h,73u,50y.cease use until 47-63-75 is completed with call 312-8730 before returning to service-75 have five yr test done in the presence of an inspection from this dept 28 rollers 3 figgri

    Feb 2, 1996

    Resolve
  • Non-hazardous

    46k,74x,74y,17i,35i,54r,31r. 74h ave elev ans all calls 74 top car 17 glass 35 walls 54 wires going down hoistway 31 going to light in hall from hoistway and ceiling.

    Feb 2, 1996

    Resolve
  • Non-hazardous

    57z9, 15l11, 35p7, 46k11, 74x# 15-checks. 31-in hoistway to door light 74-have elv answer all call

    Mar 24, 1995

    Resolve
  • Hazardous

    47l,63d,75u,3h,3m,62m,57z,25q,73u,37g,31r,35i,74t,50y,74y,54r. cease use untilitems 47-63-75 is completed with have five yr test done inthe presense of an inspeciton from this dept. 35 wall- sky light ceiling /

    Jun 20, 1994

    Resolve
  • Hazardous

    8v,73o,50y,35i,47i,54r,35 sky light&wall 54 wirek going down hoistway cease use untill item 47 is complied with-call 312-8730 before returning to service.

    Jul 26, 1991 · Penalty $1,000

    Resolve

Complaints

  • Flooring/stairs

    Floor

    Sep 11, 2026 · Apt 7

    Close
  • Safety

    Smoke detector

    Sep 11, 2026 · Apt 7

    Close
  • Plumbing

    Basin/sink

    Sep 11, 2026 · Apt 7

    Close
  • Unsanitary condition

    Pests

    Sep 11, 2026 · Apt 7

    Close
  • Electric

    No lighting

    Sep 11, 2026 · Apt 7

    Close
  • Unsanitary condition

    Pests

    Sep 11, 2026 · Apt 7

    Close
  • Paint/plaster

    Ceiling

    Sep 11, 2026 · Apt 7

    Close
  • Paint/plaster

    Wall

    Sep 11, 2026 · Apt 7

    Close
  • Safety

    Carbon monoxide detector

    Sep 11, 2026 · Apt 7

    Close
  • Appliance

    Refrigerator

    Sep 11, 2026 · Apt 7

    Close
Show 40 more ↓
  • Appliance

    Electric/gas range

    Sep 11, 2026 · Apt 7

    Close
  • Plumbing

    Bathtub/shower

    Sep 11, 2026 · Apt 7

    Close
  • Paint/plaster

    Radiator

    Sep 11, 2026 · Apt 7

    Close
  • Paint/plaster

    Ceiling

    Sep 11, 2026 · Apt 7

    Close
  • Plumbing

    Bathtub/shower

    Sep 11, 2026 · Apt 7

    Close
  • General

    Cabinet

    Sep 11, 2026 · Apt 7

    Close
  • Unsanitary condition

    Pests

    Sep 10, 2026 · Apt 71

    Close
  • Heat/hot water

    Apartment only

    Apr 21, 2026 · Apt 2B

    Close
  • Water leak

    Slow leak

    Feb 25, 2026 · Apt 71

    Close
  • Paint/plaster

    Wall

    Feb 25, 2026 · Apt 71

    Close
  • Paint/plaster

    Ceiling

    Feb 25, 2026 · Apt 71

    Close
  • Door/window

    Door

    Feb 25, 2026 · Apt 73

    Close
  • Water leak

    Slow leak

    Feb 15, 2026 · Apt 71

    Close
  • Electric

    No lighting

    Feb 15, 2026 · Apt 71

    Close
  • Heat/hot water

    Apartment only

    Feb 12, 2026 · Apt 71

    Close
  • Heat/hot water

    Apartment only

    Feb 9, 2026 · Apt 71

    Close
  • Heat/hot water

    Entire building

    Feb 4, 2026 · Apt BLDG

    Close
  • Door/window

    Door

    Feb 2, 2026 · Apt BUILDI

    Close
  • Heat/hot water

    Entire building

    Feb 1, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 31, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 31, 2026 · Apt 71

    Close
  • Heat/hot water

    Apartment only

    Jan 24, 2026 · Apt 71

    Close
  • Heat/hot water

    Apartment only

    Jan 22, 2026 · Apt 71

    Close
  • Heat/hot water

    Apartment only

    Dec 3, 2025 · Apt 71

    Close
  • Heat/hot water

    Apartment only

    Dec 1, 2025 · Apt 71

    Close
  • Water leak

    Slow leak

    Oct 30, 2025 · Apt 71

    Close
  • Heat/hot water

    Apartment only

    Oct 18, 2025 · Apt 71

    Close
  • Unsanitary condition

    Mold

    Oct 16, 2025 · Apt 48

    Close
  • Plumbing

    Toilet

    Oct 16, 2025 · Apt 48

    Close
  • Heat/hot water

    Apartment only

    Oct 16, 2025 · Apt 71

    Close
  • Water leak

    Slow leak

    Jul 14, 2025 · Apt 71

    Close
  • Paint/plaster

    Wall

    Jul 14, 2025 · Apt 71

    Close
  • Paint/plaster

    Ceiling

    Jul 14, 2025 · Apt 71

    Close
  • Plumbing

    Basin/sink

    Apr 7, 2025 · Apt 7

    Close
  • Plumbing

    Bathtub/shower

    Apr 7, 2025 · Apt 7

    Close
  • Flooring/stairs

    Floor

    Apr 7, 2025 · Apt 7

    Close
  • Flooring/stairs

    Floor

    Apr 7, 2025 · Apt 7

    Close
  • Heat/hot water

    Apartment only

    Jan 2, 2025 · Apt 71

    Close
  • Heat/hot water

    Apartment only

    Dec 2, 2024 · Apt 71

    Close
  • Heat/hot water

    Apartment only

    Nov 15, 2024 · Apt 71

    Close

Sales history

DatePriceTypeUnits
Oct 29, 2025$400,000Coops - elevator apartments—
Oct 15, 2025$120,892Coops - elevator apartments—

Building details

Building type
Elevator apartment building (D4)
Year built
1950
Floors
7
Residential units
52
Building area
69,331 ft²
Lot area
12,490 ft²
Zoning
R7-2
Community board
110
Council district
9
Block / lot
2029 / 29
Assessed value
$3,744,000
Landmark / historic district
No

HPD registration #127534, last renewed Jul 25, 2025.

Questions about 2460 Adam C Powell Blvd

Who owns 2460 Adam C Powell Blvd?

The owner of record in NYC Department of City Planning PLUTO data is 2460 7th Avenue HDFC.

Does 2460 Adam C Powell Blvd have violations?

Yes. NYC HPD has recorded 140 housing violations at this property.

Is 2460 Adam C Powell Blvd rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 2460 Adam C Powell Blvd built?

City records list 1950 as the year it was built.

How many apartments are in 2460 Adam C Powell Blvd?

It has 52 residential units and 54 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.