2220 Fredrick Douglass Bl
Manhattan, NY 10026BBL 1-01925-0063Map
Owner of record: Gesaria Properties, LLC.
2220 Fredrick Douglass Bl is a walk-up apartment building built in 1910 in Manhattan, 10026. It has 8 residential units across 5 floors. The owner of record is Gesaria Properties, LLC.. HPD has recorded 87 housing violations here, most recently on April 1, 2021. 49 of the 50 most recent violations are still open. City tax records listed 2 rent-stabilized apartments here in 2024.
- HPD violations
- 87
- DOB violations
- 11
- ECB violations
- 1
- HPD complaints
- 76
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 87
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following minimum of 100 watts as required(light fixture(s) present). at front areaway
Jun 12, 2018
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 3n, 4th story, 1st apartment from west at north
Dec 20, 2008 · Apt 3N
Open — Nov sent out - ANon-hazardous
Replace with new the missing escutcheon plate steam riser at ceiling in the 3rd room from east located at apt 3n, 4th story, 1st apartment from west at north
Dec 20, 2008 · Apt 3N
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective east concrete wall at flue pipe in boiler room
Oct 12, 2007
Open — Nov sent out - BHazardous
Properly repair the broken or defective electrical wall outlets throughout in the entire apartment located at apt 1s, 2nd story, 2nd apartment from north at east
Sep 25, 2007 · Apt 1S
Open — Nov sent out - BHazardous
Properly repair the broken or defective rotted window frames throughout in the entire apartment located at apt 1s, 2nd story, 2nd apartment from north at east
Sep 25, 2007 · Apt 1S
Open — Nov sent out - BHazardous
Replace with new the broken or defective lower sash window glass ( 1 lite ) in the bathroom located at apt 1s, 2nd story, 2nd apartment from north at east
Sep 25, 2007 · Apt 1S
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling, west and south walls in the 6th room from east located at apt 1s, 2nd story, 2nd apartment from north at east
Sep 25, 2007 · Apt 1S
Open — Nov sent out - BHazardous
Replace with new the broken or defective glass pane lower sash at north window in the 5th room from east located at apt 4s, 5th story, 1st apartment from east at south
Aug 7, 2007 · Apt 4S
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair the broken or defective lower and upper sashes windows in the entire apartment located at apt 4s, 5th story, 1st apartment from west at north
Aug 7, 2007 · Apt 4S
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 4s, 5th story, 1st apartment from east at south
Aug 7, 2007 · Apt 4S
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the entire apartment located at apt 1s, 1st story, 2nd apartment from north at east
Aug 2, 2007 · Apt 1S
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective rotted window frames in the entire apartment located at apt 1s, 1st story, 2nd apartment from north at east
Aug 2, 2007 · Apt 1S
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1s, 2nd story, 1st apartment from east at south
Mar 30, 2005 · Apt 1S
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective eroded mortar joints chimney stack northwest wall roof.
Apr 18, 1999
Open — Nov certified late - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination 5 sty ceiling fixture missing bulb public hall.
Apr 18, 1999
Open — Nov certified late - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination ceiling 2 public hall missing bulb.
Apr 18, 1999
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective south parapet wall leaning interior to roof.
Apr 18, 1999
Open — Nov certified late - BHazardous
Properly secure the loose 2 tread from bottom 2 sty public hall.
Apr 18, 1999
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective cement pointing at south brick parapet wall roof.
Apr 18, 1999
Open — Nov certified late - BHazardous
M/d law abate the nuisance consisting of exposed electrical wiring box north wall 1 to 5 thru out all stys.
Apr 18, 1999
Open — Nov certified late - BHazardous
Code: arrange and make self-closing the doors door at bulkhead to roof.
Apr 18, 1999
Open — Nov certified late - BHazardous
Replace with new the missing locking assembly street entrance door to vestibule 1 sty public hall.
Apr 18, 1999
Open — Nov certified late - BHazardous
Properly repair the broken or defective eroded mortar joints of brickwork 5 sty level to roof at south exterior.
Apr 13, 1999
Open — Nov certified late - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint rear fire escape.
Apr 13, 1999
Open — Nov sent out - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint front fire escape.
Apr 13, 1999
Open — Nov sent out - BHazardous
Properly repair the broken or defective eroded mortar joints of brickwork disused chimney roof at northwest.
Apr 13, 1999
Open — Nov certified late - BHazardous
Properly repair the broken or defective cracked & out of plumb brickwork roof at center south.
Apr 13, 1999
Open — Nov certified late - BHazardous
Properly repair the broken or defective eroded mortar joints of brickwork at north center court all stys.
Apr 13, 1999
Open — Nov certified late - BHazardous
Code: arrange and make self-closing the doors at public hall bulkhead to roof.
Apr 13, 1999
Open — Nov certified late - ANon-hazardous
Refit door public hall bulkhead to roof.
Apr 13, 1999
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceiling 5 sty public hall rear.
Apr 13, 1999
Open — Nov certified late - BHazardous
Properly secure the loose wood treads of stairs 1 to 2 sty public hall.
Apr 13, 1999
Open — Nov certified late - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Apr 13, 1999
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor 1 sty.
Apr 13, 1999
Open — Nov sent out - BHazardous
Repair or replace the smoke detector which is missing at 2 sty north apt 1n laurie. located at apt 1n
Apr 13, 1999 · Apt 1N
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling 2 sty north apt 1n 2nd room from rear. located at apt 1n
Apr 13, 1999 · Apt 1N
Open — Nov certified late - BHazardous
Properly repair the broken or defective electrical ceiling light fixture 3 sty northeast apt 2n. located at apt 2n
Mar 4, 1998 · Apt 2N
Open — Nov certified late - ANon-hazardous
Refit wood window sashes thru out 3 sty northeast apt 2n. located at apt 2n
Mar 4, 1998 · Apt 2N
Open — Nov sent out - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder front fire escape.
Mar 4, 1998
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling thru out boiler room.
Sep 3, 1997
Open — Nov sent out - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination 2 sty public hall
Sep 3, 1997
Open — Nov certified late - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system 1 sty public hall and on boiler room door.
Sep 3, 1997
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective and refit the window sashes thru out 3 sty south apt 2s. located at apt 2s
Jul 10, 1997 · Apt 2S
Open — Nov sent out - BHazardous
Properly secure the loose tread 2 sty public hall stairs 2 from bottom.
Jul 10, 1997
Open — Nov certified late - ANon-hazardous
Properly repair the broken or defective tread 1 sty public hall stair 2 3 and 4 from bottom.
Jul 10, 1997
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective mailboxes 1 sty public hall vestibule.
Jul 10, 1997
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective bells at street entrance to bldg.
Jul 10, 1997
Open — Nov sent out - CImmediately hazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods 2 sty balcony front fire escape er1.
Apr 28, 1997
Open — Nov sent out
DOB building violations · 11
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - active
Show 1 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - active
ECB violations · 1
- Non-hazardous
B4a,21a,24b,34b,39,50a,b,c,d,e,f,g,h,i,j,k,16,21b,32a,38,40.50a-holes in boiler room walls & ceiling.50b-open containers of fuel oil in boiler room.50c-no backflow preventor.50d-no check valve,50e-relief valve
Oct 27, 2007 · Penalty $2,500
Active
Complaints
- Heating
Heat related
Jan 17, 2009 · Apt 4S
Close - Heating
Heat related
Jan 17, 2009 · Apt BLDG
Close - Heating
Heat related
Dec 1, 2008 · Apt 3N
Close - Paint/plaster
Ceiling
Dec 1, 2008 · Apt 3N
Close - Paint/plaster
Ceiling
Dec 1, 2008 · Apt 3N
Close - Paint/plaster
Ceiling
Dec 1, 2008 · Apt 3N
Close - General
Windows
Oct 19, 2008 · Apt 4S
Close - Heating
Heat related
Dec 17, 2007 · Apt 3N
Close - Heating
Heat related
Dec 5, 2007 · Apt 1N
Close - Heating
Heat related
Nov 12, 2007 · Apt 1N
Close
Show 40 more ↓
- Heating
Heat-plant
Oct 12, 2007 · Apt 4S
Close - General
Windows
Oct 12, 2007 · Apt 4S
Close - General
Cabinet
Sep 6, 2007 · Apt 1S
Close - General
Ceramic-tile
Sep 6, 2007 · Apt 1S
Close - Plumbing
Bathtub/shower
Sep 6, 2007 · Apt 1S
Close - Plumbing
Bathtub/shower
Sep 6, 2007 · Apt 1S
Close - Plumbing
Basin/sink
Sep 6, 2007 · Apt 1S
Close - Plumbing
Basin/sink
Sep 6, 2007 · Apt 1S
Close - Appliance
Electric/gas range
Sep 6, 2007 · Apt 1S
Close - Electric
Bell-buzzer/intercom
Sep 6, 2007 · Apt 1S
Close - Plumbing
Basin/sink
Sep 6, 2007 · Apt 1S
Close - Appliance
Refrigerator
Sep 6, 2007 · Apt 1S
Close - Electric
Wiring
Sep 5, 2007 · Apt 1S
Close - General
Windows
Aug 2, 2007 · Apt 4S
Close - General
Windows
Aug 2, 2007 · Apt 4S
Close - General
Windows
Aug 2, 2007 · Apt 4S
Close - Paint/plaster
Wall
Jul 24, 2007 · Apt 1S
Close - Paint/plaster
Wall
Jul 24, 2007 · Apt 1S
Close - General
Floor
Jul 24, 2007 · Apt 1S
Close - General
Windows
Jul 24, 2007 · Apt 1S
Close - Paint/plaster
Wall
Jul 24, 2007 · Apt 1S
Close - Paint/plaster
Ceiling
Jul 16, 2007 · Apt 1S
Close - Electric
Lighting
Jul 16, 2007 · Apt 1S
Close - General
Windows
Jul 16, 2007 · Apt 1S
Close - General
Windows
Jul 16, 2007 · Apt 1S
Close - Paint/plaster
Wall
Jul 16, 2007 · Apt 1S
Close - Paint/plaster
Wall
Jul 16, 2007 · Apt 1S
Close - Nonconst
Vermin
Jul 16, 2007 · Apt 1S
Close - General
Floor
Jul 16, 2007 · Apt 1S
Close - Electric
Wiring
Jul 16, 2007 · Apt 1S
Close - Electric
Lighting
Jul 16, 2007 · Apt 1S
Close - Paint/plaster
Wall
Jul 16, 2007 · Apt 1S
Close - Nonconst
Carbon monoxide
May 12, 2007 · Apt 3N
Close - Nonconst
Smoke detector
May 12, 2007 · Apt 3N
Close - Nonconst
Carbon monoxide
May 12, 2007 · Apt 3N
Close - Nonconst
Carbon monoxide
May 12, 2007 · Apt 3N
Close - Heating
Heat related
Mar 18, 2007 · Apt 1N
Close - Heating
Heat related
Mar 18, 2007 · Apt 3N
Close - Heating
Heat related
Mar 18, 2007 · Apt 2N
Close - Heating
Heat related
Feb 26, 2007 · Apt 4S
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1910
- Floors
- 5
- Residential units
- 8
- Building area
- 7,495 ft²
- Lot area
- 1,913 ft²
- Zoning
- R8A
- Community board
- 110
- Council district
- 9
- Block / lot
- 1925 / 63
- Assessed value
- $826,200
- Landmark / historic district
- No
HPD registration #115320, last renewed Sep 29, 2025.
Questions about 2220 Fredrick Douglass Bl
Who owns 2220 Fredrick Douglass Bl?
The owner of record in NYC Department of City Planning PLUTO data is Gesaria Properties, LLC..
Does 2220 Fredrick Douglass Bl have violations?
Yes. NYC HPD has recorded 87 housing violations at this property.
Is 2220 Fredrick Douglass Bl rent stabilized?
NYC Department of Finance tax bills listed 2 rent-stabilized units here in 2024 (about 25% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2220 Fredrick Douglass Bl built?
City records list 1910 as the year it was built.
How many apartments are in 2220 Fredrick Douglass Bl?
It has 8 residential units and 9 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.