235 West 116 Street
Manhattan, NY 10026BBL 1-01922-0013Map
Owner of record: 133 Equities LLC
235 West 116 Street is a walk-up apartment building built in 1910 in Manhattan, 10026. It has 17 residential units across 6 floors. The owner of record is 133 Equities LLC. HPD has recorded 271 housing violations here, most recently on August 27, 2026. 10 of the 50 most recent violations are still open. City tax records listed 16 rent-stabilized apartments here in 2024.
- HPD violations
- 271
- DOB violations
- 45
- ECB violations
- 17
- HPD complaints
- 301
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 271
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at bulkhead , 6th story
Aug 27, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall at public hall, 6th story
Aug 27, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retarded material at west wall at public hall, 6th story
Aug 27, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 6th story
Aug 27, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retarded material at ceiling at public hall, 6th story
Aug 27, 2026
Open — Nov sent out - ANon-hazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 4b, 4th story, 1st apartment from north at east
Jul 4, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective bell buzzer system from building entrance to north wall in foyer in the entrance located at apt 4b, 4th story, 1st apartment from west at north
Jun 23, 2026 · Apt 4B
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall at cellar at public hall stairs
May 27, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at west wall at cellar at public hall stairs
May 27, 2026
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at throughout at cellar
May 27, 2026
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Feb 6, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5c, 5th story, 1st apartment from east at south
Feb 6, 2026 · Apt 5C
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 4th story, 1st apartment from north at east
Feb 6, 2026 · Apt 4B
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at cellar at boiler room
Jan 30, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5c, 5th story, 1st apartment from east at south
Jan 30, 2026 · Apt 5C
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4b, 4th story, 1st apartment from north at east
Oct 3, 2025 · Apt 4B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at north located at apt 4b, 4th story, 1st apartment from north at east
Oct 3, 2025 · Apt 4B
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at north located at apt 4b, 4th story, 1st apartment from north at east
Oct 3, 2025 · Apt 4B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the kitchen located at apt 4b, 4th story, 1st apartment from north at east
Sep 4, 2025 · Apt 4B
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 4b, 4th story, 1st apartment from north at east
Sep 4, 2025 · Apt 4B
Closed — Violation closed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures throughout in the entire apartment located at apt 4b, 4th story, 1st apartment from north at east
Sep 4, 2025 · Apt 4B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4b, 4th story, 1st apartment from north at east
Sep 4, 2025 · Apt 4B
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4b, 4th story, 1st apartment from north at east
Sep 4, 2025 · Apt 4B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the 1st room from east at north located at apt 4b, 4th story, 1st apartment from north at east
Sep 4, 2025 · Apt 4B
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and west wall in the 1st room from east at north located at apt 4b, 4th story, 1st apartment from north at east
Sep 4, 2025 · Apt 4B
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the kitchen located at apt 4b, 4th story, 1st apartment from north at east
Sep 4, 2025 · Apt 4B
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and west wall in the private hallway located at apt 4b, 4th story, 1st apartment from north at east
Sep 4, 2025 · Apt 4B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the private hallway located at apt 4b, 4th story, 1st apartment from north at east
Sep 4, 2025 · Apt 4B
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 2b, 2nd story, 1st apartment from north at east
Sep 3, 2025 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2b, 2nd story, 1st apartment from north at east
Sep 3, 2025 · Apt 2B
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2b, 2nd story, 1st apartment from north at east
Sep 3, 2025 · Apt 2B
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2b, 2nd story, 1st apartment from north at east
Sep 3, 2025 · Apt 2B
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of insufficient flow to no supply of cold and hot water for the fixures in the entire apartment located at apt 6c, 6th story, 1st apartment from east at south
Sep 2, 2025 · Apt 6C
Closed — Violation closed - BHazardous
Provide adequate supply of cold water for the fixtures to all fixtures in the entire apartment located at apt 6c, 6th story, 1st apartment from east at south
Sep 2, 2025 · Apt 6C
Closed — Violation closed - BHazardous
Provide adequate supply of hot water for the fixtures to all fixtures in the entire apartment located at apt 6c, 6th story, 1st apartment from east at south
Sep 2, 2025 · Apt 6C
Closed — Violation closed - BHazardous
Provide adequate supply of cold water for the fixtures at wash basin and bathtub in the bathroom located at apt 6c, 6th story, 1st apartment from east at south
Aug 5, 2025 · Apt 6C
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4b, 4th story, 1st apartment from north at east
Jul 25, 2025 · Apt 4B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4b, 4th story, 1st apartment from north at east
Jul 25, 2025 · Apt 4B
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft at ceiling in the 1st bathroom from north located at apt 2b, 2nd story, 1st apartment from south at west
Jun 17, 2025 · Apt 2B
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation radiator at east wall in the 2nd bathroom from north located at apt 2b, 2nd story, 1st apartment from south at west
Jun 17, 2025 · Apt 2B
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft at ceiling in the 1st bathroom from north located at apt 2b, 2nd story, 1st apartment from south at west original violation 18036702 issued 17-jun-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Jun 17, 2025 · Apt 2B
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation radiator at south wall in the 2nd bathroom from north located at apt 2b, 2nd story, 1st apartment from south at west
Jun 17, 2025 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4b, 4th story, 1st apartment from north at east
Jun 8, 2025 · Apt 4B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4b, 4th story, 1st apartment from north at east
May 7, 2025 · Apt 4B
Closed — Violation closed - CImmediately hazardous
Provide approved metal screen below skylight at roof bulkhead at public hall
Mar 5, 2025
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 4th story, 1st apartment from north at east
Dec 22, 2024 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at basement
Dec 22, 2024
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in wasteline at sink in the kitchen located at apt 4b, 4th story, 1st apartment from north at east
Dec 22, 2024 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 6c, 6th story
Nov 7, 2024 · Apt 6C
Closed — Violation dismissed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures at wash basin in the bathroom located at apt 4b, 4th story, 1st apartment from north at east
Jul 25, 2024 · Apt 4B
Closed — Violation closed
DOB building violations · 45
- Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Elevator elevatorrequired
Cease use
Nov 21, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 8, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 8, 2017
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 16, 2016
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed
Show 35 more ↓
- Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 16, 2015
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 22, 2014
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 28, 2013
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 11, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 11, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 8, 2011
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 13, 2010
Dob violation - resolved - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 27, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 4, 2009
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2008
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 28, 2008
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 2, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 17, 2007
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 17, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 15, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 9, 2003
Dob violation - resolved - Elevator elevatorrequired
1p40311
Jul 23, 2002
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 19, 2002
Dob violation - dismissed - Elevator elevatorrequired
1p40311
May 11, 2001
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 20, 1999
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 6, 1998
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 31, 1990
Vp*-violation unserved ecb- dismissed - Elevator elevatoroptional
1
Oct 12, 1989
Dob violation - dismissed
ECB violations · 17
- Class - 1
5/l/10 car& gate defective repair,2/x/10 alarm bell in side elevator is not working repair.
Dec 1, 2025 · Penalty $3,125
Resolve - Class - 2
Failure to provide approved/accepted plans at the jobsite at the time of insp.the respondent failed to provide approved plans for the installation of the debris chute which was installed at exp.1 and was in use
Aug 10, 2015
Resolve - Class - 2
Work w/o a permit.at the time of insp.there was a debris chute installed at exp.1 of the bldg exterior for the removal of debris at the six floor level there was no permit for the installation and use of the ab
Aug 10, 2015
Resolve - Class - 2
3307.7.2 failure to paint fence hunter green. at time of inspection observed, active job site. job site fence at exp1 is not painted hunter green as required by this section of code.all job site construction
Jul 18, 2015
Resolve - Class - 2
Work w/o a permit at time of inspection observed,active job site.no permit for the jobsite fence obtained on site or found on dob files. the jobsite fence is constructed at exp1.all permits for such work mus
Jul 18, 2015
Resolve - Class - 2
28-105.1 work after hours w/o a variance permit. at time of inspection, active job site workers found on the first floor of the building performing an interior renovation,w/o a variance permit issued or on d
Jul 18, 2015
Resolve - Class - 2
Failure to provide approved/accepted plans.construction documents at time of inspection.at time of inspection observed,active job site.workers found on the first flr performing an interior alteration/renovatio
Jul 18, 2015
Resolve - Class - 2
05k10,17m07,16k02,60q07,61b07,68m07,99bb09,15m07,03i11.05-k-cardoor-rust rot-replace 17-m-bracket assembly on 3,4,5floor 99-bb-remove expired tag from pump unit & attached tag with info 61-b-unable to view fuse
Oct 1, 2014 · Penalty $250
Resolve - Class - 2
17d06,10d06,29d06,39o02. 17d-lobby door; 29d-secure door operator cover.
Sep 19, 2014
Resolve - Class - 2
B254,5b,6a,15/24b,32a/34b,48a/50,50a,50b,50c,50d,50e,50f.50 coil safety valves not piped down.50a both steam controls on one 1/4 pipe to boiler.50b low water cut off piping corroded.50c draft induced in boiler
Apr 29, 2014
Resolve
Show 7 more ↓
- Class - 2
13b10,100d10,40p07. 13b10-emergency light to code; 100d10-repair swingdoor on car station to code; 40p07-provide access to motor room.
Sep 30, 2013
Resolve - Class - 2
100b11,39q10,12i10,40p16,34m03. 100- phone not work, toc wires are notcovered also. hoistways are also missing covers, lighting in car insufficient.
Mar 26, 2013
Resolve - Non-hazardous
83x10/39p7/ 83-x-10- return to service so a proper inspection can be done by this dept. 39-p-7- provide access to machine room
Mar 29, 2005 · Penalty $2,500
Resolve - Non-hazardous
Work w/out a permit.work noted:interior removal of partitions w/ concrete demo of raised slab w/out a permit.noted location:1)1st flr comm space west of primary entry to res bldg.2)1st flr comm space north
Sep 8, 2003
Resolve - Non-hazardous
2l11,37t7,43u5. -2 no audible sound, -37 provide company logo, -43 perform pressure test and properly tag
Sep 27, 1998 · Penalty $2,500
Resolve - Non-hazardous
73x11, 33p7, 35p7. restore to service so that a proper inspection canbe made by this dept.
Sep 15, 1995
Resolve - Hazardous
Failure to maintain. (1) stairs steps (marble) from 6 stay to roof are missing preventing acess to roof 2) fire escape is in disrepair and corroded at platform at all stories. remedy: make all necessary repairs
Jul 31, 1990 · Penalty $1,000
Resolve
Complaints
- Water leak
Heavy flow
Sep 28, 2026 · Apt 4B
Open - General
Bell/buzzer/intercom
Aug 24, 2026 · Apt 6C
Close - Water leak
Heavy flow
Aug 24, 2026 · Apt 6C
Close - Water leak
Slow leak
Aug 21, 2026 · Apt 6B
Close - Water leak
Heavy flow
Aug 21, 2026 · Apt 6B
Close - Water leak
Heavy flow
Aug 21, 2026 · Apt 6A
Close - Water leak
Heavy flow
Aug 21, 2026 · Apt 4B
Close - Plumbing
Toilet
Aug 14, 2026 · Apt 5C
Close - Plumbing
Toilet
Aug 8, 2026 · Apt 5C
Close - Plumbing
Bathtub/shower
Aug 4, 2026 · Apt 4B
Close
Show 40 more ↓
- Plumbing
Toilet
Aug 4, 2026 · Apt 4B
Close - Door/window
Door
Jul 5, 2026 · Apt 4B
Close - Appliance
Refrigerator
Jul 3, 2026 · Apt 4B
Close - Plumbing
Bathtub/shower
Jul 3, 2026 · Apt 4B
Close - Plumbing
Basin/sink
Jul 3, 2026 · Apt 4B
Close - Plumbing
Bathtub/shower
Jun 30, 2026 · Apt 4B
Close - Appliance
Refrigerator
Jun 30, 2026 · Apt 4B
Close - Plumbing
Bathtub/shower
Jun 30, 2026 · Apt 4B
Close - Unsanitary condition
Mold
Jun 30, 2026 · Apt 4B
Close - Unsanitary condition
Pests
Jun 16, 2026 · Apt 4B
Close - Appliance
Refrigerator
Jun 16, 2026 · Apt 4B
Close - General
Ventilation system
Jun 16, 2026 · Apt 4B
Close - General
Bell/buzzer/intercom
Jun 16, 2026 · Apt 4B
Close - Electric
Lighting
Jun 16, 2026 · Apt 4B
Close - Paint/plaster
Wall
Jun 16, 2026 · Apt 4B
Close - Appliance
Electric/gas range
Jun 16, 2026 · Apt 4B
Close - Electric
Lighting
May 22, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
May 22, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Apr 22, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Feb 11, 2026 · Apt 6C
Close - Plumbing
Water supply
Feb 11, 2026 · Apt 6C
Close - Heat/hot water
Apartment only
Feb 3, 2026 · Apt 5A
Close - Heat/hot water
Apartment only
Feb 2, 2026 · Apt 5A
Close - Heat/hot water
Apartment only
Feb 1, 2026 · Apt 5C
Close - Heat/hot water
Apartment only
Jan 26, 2026 · Apt 5C
Close - Unsanitary condition
Mold
Dec 5, 2025 · Apt 4B
Close - Paint/plaster
Wall
Dec 5, 2025 · Apt 4B
Close - Appliance
Electric/gas range
Dec 5, 2025 · Apt 4B
Close - Plumbing
Bathtub/shower
Dec 5, 2025 · Apt 4B
Close - Appliance
Refrigerator
Dec 5, 2025 · Apt 4B
Close - Water leak
Slow leak
Dec 5, 2025 · Apt 4B
Close - Plumbing
Basin/sink
Dec 5, 2025 · Apt 4B
Close - Flooring/stairs
Floor
Dec 5, 2025 · Apt 4B
Close - Heat/hot water
Entire building
Dec 5, 2025 · Apt 2B
Close - Unsanitary condition
Pests
Nov 24, 2025 · Apt 4B
Close - Plumbing
Bathtub/shower
Nov 24, 2025 · Apt 4B
Close - Appliance
Refrigerator
Nov 24, 2025 · Apt 4B
Close - Water leak
Heavy flow
Nov 24, 2025 · Apt 4B
Close - Heat/hot water
Entire building
Nov 5, 2025 · Apt 4B
Close - Heat/hot water
Entire building
Nov 4, 2025 · Apt 2B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1910
- Floors
- 6
- Residential units
- 17
- Building area
- 18,150 ft²
- Lot area
- 4,037 ft²
- Zoning
- R7A
- Community board
- 110
- Council district
- 9
- Block / lot
- 1922 / 13
- Assessed value
- $980,550
- Landmark / historic district
- No
HPD registration #120031, last renewed Oct 7, 2025.
Questions about 235 West 116 Street
Who owns 235 West 116 Street?
The owner of record in NYC Department of City Planning PLUTO data is 133 Equities LLC.
Does 235 West 116 Street have violations?
Yes. NYC HPD has recorded 271 housing violations at this property.
Is 235 West 116 Street rent stabilized?
NYC Department of Finance tax bills listed 16 rent-stabilized units here in 2024 (about 94% of its 17 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 235 West 116 Street built?
City records list 1910 as the year it was built.
How many apartments are in 235 West 116 Street?
It has 17 residential units and 19 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.