314 West 104 Street
Manhattan, NY 10025BBL 1-01890-0068Map
Owner of record: 314 West 104th Street, LLC
314 West 104 Street is a walk-up apartment building built in 1892 in Manhattan, 10025. It has 10 residential units across 6 floors. The owner of record is 314 West 104th Street, LLC. HPD has recorded 15 housing violations here, most recently on November 22, 2024. City tax records listed 3 rent-stabilized apartments here in 2024.
- HPD violations
- 15
- DOB violations
- 5
- ECB violations
- 20
- HPD complaints
- 273
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 15
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 22, 2024
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing hook and latch at vestibule door at building entrance at public hall stairs
Feb 15, 2024
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at bsmt-apt b, 1st bsmt-apt from east at south
Dec 18, 2020 · Apt B
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at cellar at boiler room
Dec 18, 2020
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding over 130 degrees at all hot water fixtures located at bsmt-apt b, 1st bsmt-apt from east at south
Dec 18, 2020 · Apt B
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at bsmt-apt b, 1st bsmt-apt from east at south
Dec 22, 2019 · Apt B
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective flicking light fixture at ceiling at public hall, 1st story
Jul 2, 2019
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective light fixture at ceiling in the 5th room from north located at apt 1ab, 1st story, 1st apartment from north at east
May 2, 2019 · Apt 1AB
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 1ab, 1st story, 1st apartment from north at east
May 2, 2019 · Apt 1AB
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at east wall in the 5th room from north located at apt 1ab, 1st story, 1st apartment from north at east
May 2, 2019 · Apt 1AB
Closed — Violation dismissed
Show 5 more ↓
- ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ... at public hall, 1st story
May 2, 2019
Closed — Violation closed - BHazardous
Provide dwelling with a janitor or responsible person or janitorial service.
May 27, 2010
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
May 27, 2010
Closed — Violation closed - BHazardous
Provide a piece of garden hose 10 feet in length with female coupling and a 10 quart pail on premises to test sprinkler system. at public hall, 4th story
Mar 21, 2005
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
May 25, 2002
Closed — Violation closed
DOB building violations · 5
- Construction other optional
C-construction other optional
Feb 18, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 20
- Non-hazardous
B4b,21a,21b,32a,34b,50,50a,50b,50c,50d,50e,50f. 50 boiler room door must be scaled 50a must fireproof boiler-room ceiling 50b debris in boiler room. 50c no fresh air going behind wall must be double wall (stud
Jun 15, 2008
Resolve - Hazardous
Work does not conform to approx plans. appl. #1047744451. not conforming work noted: erected over new %th floor (penhouse apts) new bulk head.over public stair well and convinence stairs of ph apts.having over
Jun 6, 2008
Resolve - Hazardous
Potable water piping cross connected to non potable water piping upon physical observation found potable water supply connected to sprinklersystem with no rpz no check valve and no double detector check in cell
Jun 3, 2008 · Penalty $400
Resolve - Hazardous
Failure to maintain bldg defects noted cracks on walls and ceiling in the apt noted location apt 7 remedy: repair defects
Mar 3, 2008
Resolve - Hazardous
Failure to safeguard public & property affected by construction operations. noted: construction work as vertical extension under permit #104774451 affected apt #7 on 3rd floor as crack & water damage
Dec 2, 2007 · Penalty $1,000
Resolve - Non-hazardous
Work does not conform to approved plans #104774451 non-conforming worknoted: plans do not show framing plans at 4th, 5th & bulkhead. installed steel studs instead of wood as shown on plans. new roof parapet
Nov 26, 2007 · Penalty $250
Resolve - Hazardous
Stop all work work deos not conform to approved plans app#104774451 dated 9/28/07 noted: work performed on stairway on first and second fls not shown on plans. plans for 4th fl shows apt on 1st exposure as
Oct 17, 2007
Resolve - Non-hazardous
B4a/50a/50b/50c. (50a)holes in boiler room walls and ceiling. (50b)boiler room fire door front not closing. (50c)boiler room fire door back not self closing.
Jan 25, 2006 · Penalty $180
Resolve - Hazardous
21a/50/36. 21a-hazardous/must repair immediately. 50-dar leit on oil pump is missing & pressure gauge or proper plug.
Dec 10, 2005 · Penalty $400
Resolve - Non-hazardous
Failure to provide approved plans at time of inspection job # 104075144 alt 2. noted: interior renovation ongoing on basement and 2 flr partitions, drywall, masonry in rear yard. remedy: stop all work, provide
Nov 2, 2005 · Penalty $2,500
Resolve
Show 10 more ↓
- Non-hazardous
Failure to maintain- defect noted. leaky ceiling- water dripping lv/br- at n/e windows at apt 7. at time of inspection. remedy: repair/or replace.
Oct 11, 2005 · Penalty $2,500
Resolve - Non-hazardous
B9b/50a/50c/50e/21a b/50b/50d. peerless c.i lp steam boiler, oil-fired50a-feed water supply connected to boiler section assembly. re-position to condensate return line. 50b-screw threads on outlet end of the sa
Aug 26, 2005 · Penalty $180
Resolve - Hazardous
Failure to maintain adequate housekeeping. defect noted: built up of construction debris in apt #4. (bricks,wood lath, plumbing pipes and loose plaster) noted location: apt #4 on the 2nd flr. remedy: maintain a
Jul 14, 2005 · Penalty $500
Resolve - Hazardous
Plumbing work without a permit.stop all plumbing work! demolition,alteration and new installation of no-hub cast iron piping used for waste in main sewer line with top and all related fittings and also plumbing
Mar 18, 2005 · Penalty $1,000
Resolve - Hazardous
Plumbing work performed is required to be performed by a licensed master plumber.demolition,alteration and new installation of no-hub cast iron piping used for waste in main sewer line with trap and all related
Mar 18, 2005 · Penalty $2,500
Resolve - Non-hazardous
Use or installation of plumbing materials which do not comply with rs-16.fernco coupling being used to tie existing sewer line in basement.fernco coupling's are not permitted.remedy:remove non-complying materia
Mar 18, 2005 · Penalty $2,500
Resolve - Non-hazardous
Failure to have new or altered plumbing system tested.demolition,alteration and new installation of no hub cast iron piping used for waste in main sewer line with trap and all related installation of steam line
Mar 18, 2005 · Penalty $2,500
Resolve - Hazardous
Work without a permit hazardous noted interior demolition of partitions removal of fire rated material from ceiling and wall thru out apt# 42nd floor at rear note:debris (plaster wood laths piled up thru-out
Mar 17, 2005 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain building. defect noted: defective and loose handrail thru-out stair. cracks developed at side of stringer between 3rd and roof level at the cable support. remedy: repair all defect.
Mar 9, 2005 · Penalty $2,500
Resolve - Non-hazardous
Work w/o a permit, work noted interior demolition of apt. 1st flr rear. entire. remedy:stop all work & obtain permits
Mar 2, 2005 · Penalty $2,500
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Sep 29, 2026 · Apt BLDG
Open - Unsanitary condition
Garbage/recycling storage
Sep 15, 2026 · Apt BLDG
Open - Safety
Smoke detector
Jan 9, 2025 · Apt BLDG
Close - Safety
Smoke detector
Nov 19, 2024 · Apt BASEME
Close - Heat/hot water
Entire building
Nov 11, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 10, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 14, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Dec 27, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2023 · Apt BLDG
Close
Show 40 more ↓
- Water leak
Slow leak
Nov 8, 2023 · Apt 1
Close - Water leak
Heavy flow
Nov 8, 2023 · Apt 1
Close - Unsanitary condition
Garbage/recycling storage
Nov 7, 2023 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Nov 6, 2023 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Sep 22, 2023 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Sep 14, 2023 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 10, 2023 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 6, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 18, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 16, 2020 · Apt B
Close - Heat/hot water
Apartment only
Dec 6, 2020 · Apt B
Close - Heat/hot water
Apartment only
Dec 4, 2020 · Apt B
Close - Heat/hot water
Entire building
Dec 4, 2020 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 22, 2020 · Apt B
Close - Heat/hot water
Apartment only
Dec 19, 2019 · Apt B
Close - Heat/hot water
Entire building
Oct 20, 2019 · Apt B
Close - Heat/hot water
Entire building
Oct 18, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 17, 2019 · Apt B
Close - Heat/hot water
Entire building
Oct 10, 2019 · Apt BLDG
Close - Paint/plaster
Wall
May 1, 2019 · Apt 1AB
Close - Paint/plaster
Ceiling
May 1, 2019 · Apt 1AB
Close - Water leak
Slow leak
May 1, 2019 · Apt 1AB
Close - Electric
Lighting
May 1, 2019 · Apt 1AB
Close - Electric
Outlet/switch
May 1, 2019 · Apt 1AB
Close - Electric
Lighting
May 1, 2019 · Apt 1AB
Close - Heat/hot water
Entire building
Mar 28, 2019 · Apt B
Close - Heat/hot water
Entire building
Mar 25, 2019 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 24, 2019 · Apt 1AB
Close - Heat/hot water
Apartment only
Dec 31, 2018 · Apt 2A
Close - Heat/hot water
Apartment only
Dec 15, 2016 · Apt 2A
Close - Heating
Heat related
Nov 3, 2012 · Apt NA
Close - Heating
Heat related
Nov 1, 2012 · Apt 4AB
Close - Nonconst
Janitor/super
May 12, 2010 · Apt 7
Close - Nonconst
Janitor/super
May 12, 2010 · Apt 7
Close - General
Locks
May 12, 2010 · Apt 7
Close - Electric
Bell-buzzer/intercom
May 12, 2010 · Apt 7
Close - Heating
Heat related
Mar 4, 2010 · Apt 7
Close - Heating
Heat related
Dec 14, 2008 · Apt THA
Close - Paint/plaster
Wall
Oct 31, 2008 · Apt 7
Close - Paint/plaster
Wall
Oct 31, 2008 · Apt 7
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1892
- Floors
- 6
- Residential units
- 10
- Building area
- 8,526 ft²
- Lot area
- 2,018 ft²
- Zoning
- R8B
- Community board
- 107
- Council district
- 7
- Block / lot
- 1890 / 68
- Assessed value
- $1,737,450
- Landmark / historic district
- Riverside-West End Historic District Extension II
HPD registration #134355, last renewed Jul 8, 2025.
Questions about 314 West 104 Street
Who owns 314 West 104 Street?
The owner of record in NYC Department of City Planning PLUTO data is 314 West 104th Street, LLC.
Does 314 West 104 Street have violations?
Yes. NYC HPD has recorded 15 housing violations at this property.
Is 314 West 104 Street rent stabilized?
NYC Department of Finance tax bills listed 3 rent-stabilized units here in 2024 (about 30% of its 10 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 314 West 104 Street built?
City records list 1892 as the year it was built.
How many apartments are in 314 West 104 Street?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.