roofy

224 West 104 Street

Manhattan, NY 10025BBL 1-01875-0043Map

Owner of record: 224 W.104 St.build/Corp.

224 West 104 Street is a walk-up apartment building built in 1926 in Manhattan, 10025. It has 12 residential units across 4 floors. The owner of record is 224 W.104 St.build/Corp.. HPD has recorded 29 housing violations here, most recently on April 22, 2026. 16 of the 29 most recent violations are still open. City tax records listed 8 rent-stabilized apartments here in 2024.

HPD violations
29
DOB violations
10
ECB violations
6
HPD complaints
85

What to know

Concern
11 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 22, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
8
About 67% of the building's 12 apartments
Down from 10 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 29

  • C

    Provide ready access to buildings heating system door locked leading to basement at boiler room

    Apr 22, 2026

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4, 2nd story, 1st apartment from east at south

    Apr 22, 2026 · Apt 4

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 4, 2nd story, 1st apartment from east at south

    Apr 22, 2026 · Apt 4

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4, 2nd story, 1st apartment from east at south

    Apr 22, 2026 · Apt 4

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4, 2nd story, 1st apartment from east at south

    Apr 22, 2026 · Apt 4

    Open — Nov sent out
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.

    Apr 22, 2026

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system defective incorrect info at public hall, 1st story

    Apr 22, 2026

    Open — Nov sent out
  • C

    Remove device preventing door from being self-closing door stopper at building entrance door

    Apr 22, 2026

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 5, 3rd story, 1st apartment from north at east

    Apr 22, 2026 · Apt 5

    Open — Invalid certification
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4, 2nd story, 1st apartment from east at south

    Apr 22, 2026 · Apt 4

    Open — Invalid certification
Show 19 more ↓
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4, 2nd story, 1st apartment from north at east

    Nov 17, 2025 · Apt 4

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 2nd story, 2nd apartment from north at east

    Nov 17, 2025 · Apt 1

    Open — Nov sent out
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 2nd story, 2nd apartment from north at east

    Nov 17, 2025 · Apt 1

    Open — Nov sent out
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4, 2nd story, 1st apartment from north at east

    Nov 17, 2025 · Apt 4

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door to cellar locked at boiler room

    Nov 17, 2025

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4, 2nd story, 1st apartment from north at east

    Nov 17, 2025 · Apt 4

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 15, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 16, 2022

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system ... at public hall, 1st story

    Nov 22, 2021

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 2nd story

    Nov 22, 2021

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 2nd story

    Nov 22, 2021

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 2, 2021

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 6, 3rd story, 1st apartment from east at south

    Mar 31, 2018 · Apt 6

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 6, 3rd story, 1st apartment from east at south

    Mar 31, 2018 · Apt 6

    Closed — Violation closed
  • C

    Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 4, 2nd story, 1st apartment from north at east

    Mar 31, 2018 · Apt 4

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door from west at north wall, 1st door frame from west at north wall, 1st riser from north at east wall, north wall, east wall, 1st window frame from west at north wall in the 1st room from north located at apt a, 1st story, 1st apartment from north at east

    Jul 24, 2005 · Apt A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door from south at west wall, 1st door frame from south at west wall, east wall, west wall in the 2nd kitchen from north at east located at apt a, 1st story, 1st apartment from north at east

    Jul 24, 2005 · Apt A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, south wall, east wall, west wall in the 2nd bathroom from north at west located at apt a, 1st story, 1st apartment from north at east

    Jul 24, 2005 · Apt A

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 6, 3rd story, 1st apartment from south at west

    Sep 24, 2002 · Apt 6

    Open — First no access to re- inspect violation

DOB building violations · 10

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed

ECB violations · 6

  • Class - 2

    Failure to file required annual boiler inspection reports for low-pressure boiler 10000112896n0001 in accordance with the rules of the department. 1rcny 103-01(d)(1) requires that an annual inspection report fo

    Jul 1, 2025 · Penalty $625

    Active
  • Class - 2

    At time of inspection of 4 story residential building observed sidewalk shed in place without information panel causing hazardous conditions.provide information panel

    May 1, 2025

    Resolve
  • Class - 1

    At time of inspection of 4 story building with sidewalk shed in place without electrical permit for temporary sidewalk shed lights causing hazardous conditions.

    May 1, 2025 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to maintain building in code-compliant manner. water leaking from metal ceiling located in the laundromat; water coming through light fixture & over washing machines. remedy: repair and/or replace.

    Feb 5, 2009 · Penalty $1,000

    Resolve
  • Class - 1

    Noted:there are 6dryers located in the 1st flr laundromat w.o sprinkler system.an automatic sprinkler system shall be installed in spaces in which2 or more clothes dryer machines are installed. rmd: provide a s

    Feb 5, 2009 · Penalty $1,000

    Resolve
  • Non-hazardous

    34a/ 36/ bq9/ 39/ 44c/ 24b/ 38/ (49a) no lights ( nateo oil fired boiler ) landromet blr 49b install emergency shut off switch out side of boiler rm (49c) install back flow for natco 49c debat cluttered

    Mar 13, 2002 · Penalty $180

    Resolve

Complaints

  • Outside building

    Gutter/leader

    Sep 27, 2026 · Apt 2

    Open
  • Plumbing

    Water supply

    May 16, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 21, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 27, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 27, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 21, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 21, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 16, 2025 · Apt 4

    Close
  • Heat/hot water

    Entire building

    Oct 13, 2025 · Apt 2

    Close
  • Plumbing

    Water supply

    Sep 22, 2025 · Apt 2

    Close
Show 40 more ↓
  • Plumbing

    Water supply

    Jan 17, 2022 · Apt 5

    Close
  • Heat/hot water

    Entire building

    Nov 20, 2021 · Apt 3

    Close
  • Heat/hot water

    Entire building

    Apr 5, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 5, 2018 · Apt A

    Close
  • Heat/hot water

    Entire building

    Mar 29, 2018 · Apt 6

    Close
  • Water leak

    Slow leak

    Jun 13, 2016 · Apt 6

    Close
  • Heat/hot water

    Apartment only

    Jun 13, 2016 · Apt 6

    Close
  • Heat/hot water

    Entire building

    Mar 28, 2014 · Apt BLDG

    Close
  • Heating

    Heat related

    Feb 3, 2014 · Apt 4

    Close
  • Heating

    Heat related

    Oct 21, 2013 · Apt NA

    Close
  • Heating

    Heat related

    Mar 25, 2011 · Apt BLDG

    Close
  • Paint/plaster

    Wall

    Feb 14, 2007 · Apt 8

    Close
  • Paint/plaster

    Ceiling

    Feb 14, 2007 · Apt 8

    Close
  • General

    Floor

    Feb 14, 2007 · Apt 8

    Close
  • Heating

    Heat related

    Oct 25, 2006 · Apt BLDG

    Close
  • Electric

    Bell-buzzer/intercom

    Feb 4, 2006 · Apt 8

    Close
  • Plumbing

    Radiator

    Feb 4, 2006 · Apt 8

    Close
  • Electric

    Bell-buzzer/intercom

    Feb 4, 2006 · Apt 8

    Close
  • Nonconst

    Smoke detector

    Feb 4, 2006 · Apt 8

    Close
  • Paint/plaster

    Wall

    Feb 4, 2006 · Apt 8

    Close
  • Paint/plaster

    Ceiling

    Feb 4, 2006 · Apt 8

    Close
  • General

    Floor

    Feb 4, 2006 · Apt 8

    Close
  • Plumbing

    Radiator

    Feb 4, 2006 · Apt 8

    Close
  • Plumbing

    Water-leaks

    Jan 21, 2006 · Apt 8

    Close
  • General

    Floor

    Jan 21, 2006 · Apt 8

    Close
  • Paint/plaster

    Radiator

    Jan 21, 2006 · Apt 8

    Close
  • Heating

    Heat related

    Nov 11, 2005 · Apt A

    Close
  • Plumbing

    Water-leaks

    Oct 12, 2005 · Apt C

    Close
  • Plumbing

    Radiator

    Aug 7, 2005 · Apt A

    Close
  • Heating

    Heat related

    Aug 6, 2005 · Apt BLDG

    Close
  • Plumbing

    Radiator

    Jul 23, 2005 · Apt A

    Close
  • Plumbing

    Radiator

    Jul 23, 2005 · Apt A

    Close
  • Plumbing

    Toilet

    Apr 22, 2005 · Apt C

    Close
  • Nonconst

    Rubbish

    Apr 6, 2005 · Apt BLDG

    Close
  • Plumbing

    Toilet

    Mar 30, 2005 · Apt C

    Close
  • General

    Doors

    Jan 11, 2005 · Apt 1

    Close
  • Heating

    Heat related

    Oct 17, 2004 · Apt A

    Close
  • Heating

    Radiator

    Jun 29, 2004 · Apt A

    Close
  • General

    Floor

    May 31, 2004 · Apt C

    Close
  • General

    Floor

    May 31, 2004 · Apt C

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1926
Floors
4
Residential units
12
Building area
7,125 ft²
Lot area
2,234 ft²
Zoning
R9A
Community board
107
Council district
7
Block / lot
1875 / 43
Assessed value
$980,550
Landmark / historic district
No

HPD registration #133795, last renewed Sep 25, 2025.

Questions about 224 West 104 Street

Who owns 224 West 104 Street?

The owner of record in NYC Department of City Planning PLUTO data is 224 W.104 St.build/Corp..

Does 224 West 104 Street have violations?

Yes. NYC HPD has recorded 29 housing violations at this property.

Is 224 West 104 Street rent stabilized?

NYC Department of Finance tax bills listed 8 rent-stabilized units here in 2024 (about 67% of its 12 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 224 West 104 Street built?

City records list 1926 as the year it was built.

How many apartments are in 224 West 104 Street?

It has 12 residential units and 14 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.