roofy

245 East 124 Street

Manhattan, NY 10035BBL 1-01789-0021Map

Owner of record: East 124th Street Ll

245 East 124 Street is an elevator apartment building built in 2009 in Manhattan, 10035. It has 185 residential units across 12 floors. The owner of record is East 124th Street Ll. HPD has recorded 111 housing violations here, most recently on August 25, 2026. 15 of the 50 most recent violations are still open. City tax records listed 185 rent-stabilized apartments here in 2024.

HPD violations
111
DOB violations
27
ECB violations
69
HPD complaints
145

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Watch
Last violation Aug 25, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
185
About 100% of the building's 185 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 111

  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Aug 25, 2026

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing

    Aug 25, 2026

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story

    Aug 25, 2026

    Open — Nov sent out
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Aug 25, 2026

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 12a, 12th story, 4th apartment from west at north

    Aug 25, 2026 · Apt 12A

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 12a, 12th story, 4th apartment from west at north

    Aug 25, 2026 · Apt 12A

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at west located at apt 12a, 12th story, 4th apartment from west at north

    Aug 25, 2026 · Apt 12A

    Open — Nov sent out
  • B

    Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at vestibule door

    May 18, 2026

    Closed — Violation closed
  • C

    Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at building entrance door

    May 18, 2026

    Closed — Violation closed
  • B

    Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at building entrance door

    May 18, 2026

    Closed — Violation closed
Show 40 more ↓
  • C

    Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at vestibule door

    May 18, 2026

    Closed — Violation closed
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    May 18, 2026

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing

    May 18, 2026

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story

    May 18, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    May 18, 2026

    Open — Nov sent out
  • B

    Provide handrail at stairs leading to tenant storage units , 1st story

    May 18, 2026

    Open — Invalid certification
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations now working in the entire apartment located at apt 5c, 5th story, 2nd apartment from west at north

    May 10, 2026 · Apt 5C

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 5c, 5th story, 2nd apartment from west at north

    May 10, 2026 · Apt 5C

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the foyer located at apt 9s, 9th story, 2nd apartment from north at east , section ''east''

    Sep 30, 2025 · Apt 9S

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the kitchen located at apt 9s, 9th story, 2nd apartment from north at east , section ''east''

    Sep 30, 2025 · Apt 9S

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the kitchen located at apt 9s, 9th story, 2nd apartment from north at east , section ''east''

    Sep 30, 2025 · Apt 9S

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling, south wall, north wall, and west wall in the 2nd room from east located at apt 9s, 9th story, 2nd apartment from north at east , section ''east''

    Sep 30, 2025 · Apt 9S

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling and all walls in the 1st bathroom from east located at apt 9s, 9th story, 2nd apartment from north at east , section ''east''

    Sep 30, 2025 · Apt 9S

    Closed — Violation closed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acoustic ceiling tiles at public hall, 9th story

    Sep 30, 2025

    Open — Not complied with
  • B

    Repair the roof so that it will not leak at the ceiling at public hall, 9th story

    Sep 30, 2025

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... at the ceiling, north wall, and south wall greater than 10 square feet in the 1st room from east at south located at apt 9s, 9th story, 2nd apartment from north at east , section ''east''

    Sep 30, 2025 · Apt 9S

    Open — First no access to re- inspect violation
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the 2nd bathroom from east located at apt 9s, 9th story, 2nd apartment from north at east , section ''east''

    Sep 30, 2025 · Apt 9S

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at the east wall and south wall in the private hallway located at apt 9s, 9th story, 2nd apartment from north at east , section ''east''

    Sep 30, 2025 · Apt 9S

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the 2nd room from east located at apt 9s, 9th story, 2nd apartment from north at east , section ''east''

    Sep 30, 2025 · Apt 9S

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the 1st room from east at south located at apt 9s, 9th story, 2nd apartment from north at east , section ''east''

    Sep 30, 2025 · Apt 9S

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling, east wall, north wall, west wall, and south wall in the 1st room from east at south located at apt 9s, 9th story, 2nd apartment from north at east , section ''east''

    Sep 30, 2025 · Apt 9S

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 square feet,at the ceiling and south wall in the 1st room from east at north located at apt 9s, 9th story, 2nd apartment from north at east , section ''east''

    Sep 30, 2025 · Apt 9S

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling, north wall, and south wall in the 1st room from east at north located at apt 9s, 9th story, 2nd apartment from north at east , section ''east''

    Sep 30, 2025 · Apt 9S

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 square feet,at the ceiling and south wall in the 1st room from east at north located at apt 9s, 9th story, 2nd apartment from north at east , section ''east'' original violation 18262735 issued 30-sep-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Sep 30, 2025 · Apt 9S

    Open — First no access to re- inspect violation
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the private hallway located at apt 9s, 9th story, 2nd apartment from north at east , section ''east''

    Sep 30, 2025 · Apt 9S

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east, west walls and ceiling in the 1st room from east at south located at apt 9s, 9th story, 2nd apartment from east at south

    Aug 29, 2025 · Apt 9S

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at east, west walls and ceiling in the 1st room from east at south located at apt 9s, 9th story, 2nd apartment from east at south

    Aug 29, 2025 · Apt 9S

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the 2nd room from east located at apt 9n, 9th story, 4th apartment from east at south

    Jan 26, 2025 · Apt 9N

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east located at apt 9n, 9th story, 4th apartment from east at south

    Jan 26, 2025 · Apt 9N

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 3q, 3rd story, 2nd apartment from east at south

    Apr 1, 2024 · Apt 3Q

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 2nd room from east located at apt 12h, 12th story, 6th apartment from west at north

    Apr 1, 2024 · Apt 12H

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak at ceiling and west wall in the 2nd room from east located at apt 12h, 12th story, 6th apartment from west at north

    Apr 1, 2024 · Apt 12H

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective ..hinges at hopper door, north wall at compactor closet at north , 4th story

    Dec 27, 2023

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4m, 4th story

    Sep 23, 2023 · Apt 4M

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective light fixture at ceiling in the kitchen located at apt 4m, 4th story

    Sep 23, 2023 · Apt 4M

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective light fixture at ceiling in the private hallway located at apt 4m, 4th story

    Sep 23, 2023 · Apt 4M

    Closed — Violation dismissed
  • C

    Properly repair or replace the broken or defective all fire damaged windows at north wall in the 1st room from north at center located at apt 8m, 8th story, 1st apartment from west at north

    May 4, 2023 · Apt 8M

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 8m, 8th story, 1st apartment from west at north

    May 4, 2023 · Apt 8M

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 8m, 8th story, 1st apartment from west at north

    May 4, 2023 · Apt 8M

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from north located at apt 8m, 8th story, 1st apartment from west at north

    May 4, 2023 · Apt 8M

    Closed — Violation closed

DOB building violations · 27

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 22, 2025

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Apr 29, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 17, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 23, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 30, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2019

    Jun 29, 2020

    Dob violation - dismissed
Show 17 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 2, 2015

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst

    May 30, 2014

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst

    May 30, 2014

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst

    May 30, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 11, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 11, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 11, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 11, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 11, 2011

    Dob violation - resolved
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Aug 22, 2009

    Vw*-violation - work w/o permit dismissed
  • Construction other optional

    C-construction other optional

    Apr 13, 2009

    Dob violation - dismissed

ECB violations · 69

  • Class - 1

    Failure to submit the required parking structure initial observation report for an existing parking structure or a periodic inspection of a parking structure(pips)report documenting the conditions of psid#m0002

    Oct 1, 2024 · Penalty $1,250

    Active
  • Class - 2

    On 1st floor concrete cracking and spalling in many small areas all over 1st floor parking area., repair and/or replace

    May 1, 2023 · Penalty $625

    Active
  • Class - 2

    Residential building, parking lot on 1st floor and cellar level no second means of egress. at cellar level 3 doors with exit signs above them don't open, key card access only doors, rear of 1st level 1 door wit

    May 1, 2023 · Penalty $625

    Active
  • Class - 2

    Temp const equipment (sidewalkshed) onsite-expired permit.observed [email protected] const equipment (sws) requires permit@all times to remain installed.permit in dobnow expired12/11/21.dobnow permit m004345

    Jun 28, 2022 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain building exterior walls/facade and appurtenances. note at the time of inspection view at exposure 1 south elevation damaged facade at southeast 4th fl and various damaged joints many floors.

    Jan 21, 2021 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to provide sidewalk shed where required. as noted respondent did not install sws at location cited in previous summons,and did not repair violating conditions. at time of inspection i observed on exposu

    Nov 24, 2020

    Resolve
  • Class - 1

    Unlawful acts. failure to comply w/ commissioners order. note at time of inspection no repairs was done and no sidewalk shed was install to protect the public. previous summons cited installation of sws&there w

    Nov 24, 2020

    Resolve
  • Class - 2

    Failure to comply w/ the commissioners order to file a certificate of correction w/ the dob. note:at time of inspection the respondent did not file a c of c w/ the dob. remedy:file a c of c w/ dob correct viola

    Nov 24, 2020

    Resolve
  • Class - 2

    Failure to comply w/commissioner's order to file a certificate of correction w/the dept of bldgs.note:at the time of inspection respondent did not comply w/previous violation #35458554y issued on 07/02/2020.as

    Sep 28, 2020 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to provide sidewalk shed where require.note at the time of inspection observed defect at exposure 1 south east corner spalled bricksremedy:provide sidewalk shed

    Sep 28, 2020 · Penalty $10,000

    Resolve
Show 40 more ↓
  • Class - 1

    Failure to maintain exterior building facade and appurtenances.note:expo 1 south elevation displays two areas of spalling brick at the 1st and 4th fl on the se side of expo 1 delaminating brick presents hazard

    Jul 2, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Owner failed to make required repairs to bldgs facade & appurences as recommended by qewi's suggested time frame.qewi recommended a repair time frame to 2/28/19 & as of 2/28/20 no such repairs or an request fo

    Feb 28, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Cease use 5.a.10,99.bb.7=5.a.10 car door restructor altered & repair 99-bb-7 one year tag expired provide

    Aug 27, 2019 · Penalty $312

    Resolve
  • Class - 2

    Failure to file annual certification that cooling tower 1000020270 has been inspected, tested and disinfected and that a maintenance plan has been developed and implemented by november 1, 2016. rem: file annual

    Jun 20, 2017 · Penalty $1,000

    Resolve
  • Class - 2

    Failure to file annual certification that cooling tower 1000020221 has been inspected, tested and disinfected and that a maintenance plan has been developed and implemented by november 1, 2016. rem: file annual

    Jun 20, 2017 · Penalty $1,000

    Resolve
  • Class - 2

    (misc)3301.2failure to safeguard public & property affected by construction operation-noted:no yellow copy for tucosene,(approx 4)55 gallons@ 1st flr-no fdny permit.rem:stop all use remove from site-provide fdn

    Mar 11, 2010 · Penalty $400

    Resolve
  • Class - 2

    Work does not conform to approved construction documents &/or approvedamendments.noted:site safety plan does not indicate sdwlk shed bumpoutinto street.approx50ft out on st with no solid barricades protecting

    Mar 11, 2010 · Penalty $250

    Resolve
  • Class - 2

    (misc)3307.4.3vehicular traffic-noted:@ perimeter of side no signals lights,reflectors on wood timber barricades.rem:provide lights on barricades

    Mar 11, 2010 · Penalty $400

    Resolve
  • Class - 1

    B106-bc-3314.8 fail to provide required guardrails.toe boards for scaffold platform as note:at time of inspection at above active construction site observed workers (carpenter)were working on pipe scaffold app

    Feb 25, 2010 · Penalty $1,600

    Resolve
  • Class - 2

    B206bc3314.4.6 unqualified person using a supported scaffold as noted:at time of inspection at above activr construction site observed window installation in progress on 11 floor,worker was using pipe scaffold

    Feb 25, 2010 · Penalty $400

    Resolve
  • Class - 2

    Work does not conform to approved const documents & approved plans.as noted:@time of insp @ above active const site observed supoorted scaffold erected in front of site approx 110'feet from ground fl to roof le

    Feb 9, 2010 · Penalty $250

    Resolve
  • Class - 1

    Sec 3314.4.6 unqualified person using a supported scaffold.as noted:attime of insp @ above active const site const work in progress observedthat pipe scaffold has been erected in various location on ground fl

    Feb 9, 2010 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary construction - no guard rails. as noted: at time of inspection at above active construction site bldg up to roof level & construction work in

    Feb 6, 2010 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping per section requirements. noted: at time of inspection at above active site bldg up to the roof construction work in progress observed numerous amount of debris

    Nov 16, 2009 · Penalty $2,400

    Resolve
  • Class - 1

    Erection, dismantling or modifying supported scaffolding w/o supportedscaffold cert of completion - upon inspection noted: 6-7 workers working on supported scaffold on 10th flr in exp 1, moving planks,

    Oct 14, 2009 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to provide and maintain vertical safety netting - upon inspection, construction of nb in progress. at time of inspection, noted vertical safety netting not provided on roof in exp 1, on 10th flr exp 3&4

    Oct 14, 2009 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to provide guard rail - upon inspection noted mid rails not provided along the flr edges on flrs 3-11 in all exps. also noted 2 workers working on 10th flr exp 4 on pipe scaffold w/o guard rails being

    Oct 14, 2009

    Resolve
  • Class - 1

    Use of supported scaffold w/o a scaffold users certificate - upon inspection noted two workers working on pipe scaffold on 10th flr exp 4 and installing copping over parapet. the workers working on pipe

    Oct 14, 2009 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to safeguard all persons and property affected by constructionoperation - insufficient toolbox talks - upon inspection, constructionof nb in progress. at time of inspection noted two workers installing

    Oct 14, 2009 · Penalty $2,400

    Resolve
  • Class - 2

    Sec. 28-103.8. matters not provided for - upon inspection noted daily inspection log for supported scaffold is not available since 9.24.09. the supported scaffoldings are being in use by several traders.

    Oct 14, 2009

    Resolve
  • Class - 2

    Work does not conform to approved plan upon inspection noted approx 50ft long 16ft high sidewalk shed erected on e 124st on the roadway. the approved site safety shows sidewalk shed to be erected on sidewalk.

    Sep 8, 2009 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operation upon inspection noted: approx 50ft long 16ft high sidewalk shed erected in exp 1 of the side on e 124 st on the round way,7 posts

    Sep 8, 2009 · Penalty $2,400

    Resolve
  • Class - 2

    Work does not conform to approved plan upon inspection noted: sidewalkshed erected over the side walk on e 124 st & 2nd ave on exp 1 & 4 of the site. as noted the sidewalk shed has cross bracings installed @ 6

    Sep 8, 2009

    Resolve
  • Class - 2

    Matters not provided upon inspection construction of nb in progress. at time of inspection noted sidewalk shed erected along exp 1 on e 124 st & exp 4 on 2nd ave. the daily log for sidewalk shed not maintained

    Sep 8, 2009 · Penalty $800

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping per section requirements. attime of inspection on active job site w/plumbing & exterior brick facade installation in operation. observed at the following flr - cellar,

    Aug 6, 2009 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary construction (no guard rails). noted at time of inspection on active job site w/brick facade walls & plumbing work in operation. observed at

    Aug 6, 2009 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temporary construction. (no toe boards). noted: at time of inspection on active job site w/facade brickwork, plumbing work in operation observed on

    Aug 6, 2009 · Penalty $1,000

    Resolve
  • Class - 1

    Work does not conform to approved construction documents and or approved amendments or site safety plan. noted: at time of inspection on active job site observed at both the 3rd flr and 10th flr level site safe

    Jul 21, 2009 · Penalty $1,000

    Resolve
  • Class - 2

    Work w/o a permit expired permit #120028460 #120057945 sf expired on 6/29/09 noted at time of inspection on active job site w/ plumbing electric work in operation. observed supported pipe scaffold erected on 12

    Jul 21, 2009

    Resolve
  • Class - 2

    Work does not conform to approved const documents and/or approved amendments/site safety plan.noted:at time of inspection on active job siteobserved thru out all floors vertical safety netting was not installed

    Jul 21, 2009

    Resolve
  • Class - 1

    Failure to provide fire extinguisher as per nyc fire code: noted at time of inspection on active job site w/ plumbing electric and housekeeping in operation observed at all flrs only 2 fire extinguishers are

    Jul 21, 2009 · Penalty $1,600

    Resolve
  • Class - 2

    Guardrail system & toe boards. noted at time of inspection on active job site observed 12 story building with erected pipe scaffold system to roof. working platform that were more than 18" away from building li

    Jul 21, 2009

    Resolve
  • Class - 2

    Platform tiedown noted at time of inspection on active jobsite observed steel frame supported scaffold erected on 12 story bldg observed on all level of planked scaffold system no platforms are tied down clean

    Jul 21, 2009

    Resolve
  • Class - 2

    Storage of materials and debris noted: at time of inspection on activejob site observed pipe frame scaffold erected on 12 story new bldg observed scaffold platform loaded w/ piles of new brick on platform for

    Jul 21, 2009

    Resolve
  • Class - 2

    Failure to provide log book of daily inspection for scaffolding noted at time of inspection on active job site w/ supported pipe frame scaffolding erected in 12 story bldg for installation of new brick facade

    Jul 21, 2009

    Resolve
  • Class - 1

    Failure to institute and maintain safety equipment measures or temp construction. no guardrails noted: at time time inspection on active jobsite w/ electric plumbing and housekeeping work in operation. observed

    Jul 21, 2009 · Penalty $1,200

    Resolve
  • Class - 1

    Failure to institute and maintain safety equipment measures or temp construction (no toe boards) noted: at time of inspection on active jobsite w/ electric and plumbing and housekeeping work in operation. obser

    Jul 21, 2009 · Penalty $1,000

    Resolve
  • Class - 1

    Failure to provide fire standpipe caps on hoose valve. noted: at time of inspection on active jobsite observed on 9th and 10th flr standpipehose connection caps missing standpipe system is wet. remedy: provide

    Jul 21, 2009 · Penalty $1,200

    Resolve
  • Class - 2

    Failure to provide required warning signs and lights noted: at time ofinspection on active jobsite observed on e 124 st elevation dot barricade area next to public sidewalk shed no signs or flashing lights prov

    Jul 21, 2009 · Penalty $400

    Resolve
  • Class - 1

    Sec. bc3303.7.2 27-1069 failure to provide fire extinguished as per fire code. observed no fire extinguisher provided for hoist area up to 8th flr level. fire extinguisher also not provided for each stairwell

    Jun 10, 2009 · Penalty $8,000

    Resolve

Complaints

  • Water leak

    Heavy flow

    Aug 12, 2026 · Apt 12G

    Close
  • General

    Cabinet

    Aug 7, 2026 · Apt 12A

    Close
  • General

    Ventilation system

    Aug 7, 2026 · Apt 12A

    Close
  • Water leak

    Slow leak

    Aug 7, 2026 · Apt 12A

    Close
  • Plumbing

    Bathtub/shower

    Aug 7, 2026 · Apt 12A

    Close
  • Water leak

    Damp spot

    Aug 7, 2026 · Apt 12A

    Close
  • Electric

    No lighting

    Aug 7, 2026 · Apt 12A

    Close
  • Safety

    Fire escape

    May 13, 2026 · Apt BLDG

    Close
  • Door/window

    Door

    May 8, 2026 · Apt 10S

    Close
  • Flooring/stairs

    Floor

    May 8, 2026 · Apt 10S

    Close
Show 40 more ↓
  • Door/window

    Door

    May 8, 2026 · Apt 10S

    Close
  • Paint/plaster

    Wall

    Apr 8, 2026 · Apt 12T

    Close
  • Water leak

    Damp spot

    Apr 8, 2026 · Apt 12T

    Close
  • Heat/hot water

    Apartment only

    Mar 18, 2026 · Apt 10S

    Close
  • Heat/hot water

    Entire building

    Mar 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 7, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 7, 2026 · Apt 10S

    Close
  • Heat/hot water

    Apartment only

    Feb 2, 2026 · Apt 5C

    Close
  • Heat/hot water

    Entire building

    Feb 1, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 31, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 31, 2026 · Apt 10S

    Close
  • Heat/hot water

    Entire building

    Jan 31, 2026 · Apt 10S

    Close
  • Heat/hot water

    Apartment only

    Jan 31, 2026 · Apt 10S

    Close
  • Heat/hot water

    Entire building

    Jan 31, 2026 · Apt 10S

    Close
  • Heat/hot water

    Entire building

    Jan 31, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 31, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 27, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 27, 2026 · Apt 11S

    Close
  • Heat/hot water

    Apartment only

    Jan 27, 2026 · Apt 1C

    Open
  • Heat/hot water

    Apartment only

    Jan 27, 2026 · Apt 10F

    Close
  • Heat/hot water

    Apartment only

    Jan 27, 2026 · Apt 10S

    Close
  • Door/window

    Door

    Jan 27, 2026 · Apt 1C

    Open
  • Heat/hot water

    Entire building

    Jan 26, 2026 · Apt 10S

    Close
  • Door/window

    Window frame

    Jan 24, 2026 · Apt 5C

    Close
  • Water leak

    Slow leak

    Dec 4, 2025 · Apt 4U

    Close
  • Water leak

    Damp spot

    Dec 4, 2025 · Apt 4U

    Close
  • Heat/hot water

    Apartment only

    Nov 24, 2025 · Apt 9P

    Close
  • Outside building

    Roofing

    Sep 26, 2025 · Apt 9S

    Close
  • Water leak

    Slow leak

    Sep 26, 2025 · Apt 9S

    Close
  • Water leak

    Damp spot

    Sep 26, 2025 · Apt 9S

    Close
  • Door/window

    Door

    Sep 26, 2025 · Apt 9S

    Close
  • Unsanitary condition

    Mold

    Sep 26, 2025 · Apt 9S

    Close
  • Water leak

    Slow leak

    Aug 27, 2025 · Apt 9S

    Close
  • Water leak

    Slow leak

    Jul 28, 2025 · Apt 9S

    Close
  • Appliance

    Electric/gas range

    Jul 9, 2025 · Apt 9S

    Close
  • Unsanitary condition

    Mold

    Jul 9, 2025 · Apt 9S

    Close
  • Water leak

    Slow leak

    Jul 9, 2025 · Apt 9S

    Close
  • Safety

    Carbon monoxide detector

    Jul 9, 2025 · Apt 9S

    Close
  • General

    Cabinet

    Jul 9, 2025 · Apt 9S

    Close
  • Paint/plaster

    Ceiling

    Jul 9, 2025 · Apt 9S

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D6)
Year built
2009
Floors
12
Residential units
185
Building area
208,526 ft²
Lot area
24,927 ft²
Zoning
C4-4D
Community board
111
Council district
8
Block / lot
1789 / 21
Assessed value
$14,664,150
Landmark / historic district
No

HPD registration #143305, last renewed Oct 23, 2025.

Questions about 245 East 124 Street

Who owns 245 East 124 Street?

The owner of record in NYC Department of City Planning PLUTO data is East 124th Street Ll.

Does 245 East 124 Street have violations?

Yes. NYC HPD has recorded 111 housing violations at this property.

Is 245 East 124 Street rent stabilized?

NYC Department of Finance tax bills listed 185 rent-stabilized units here in 2024 (about 100% of its 185 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 245 East 124 Street built?

City records list 2009 as the year it was built.

How many apartments are in 245 East 124 Street?

It has 185 residential units and 190 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.