246 East 125 Street
Manhattan, NY 10035BBL 1-01789-0030Map
Owner of record: Rahmana 26 LLC
246 East 125 Street is a store building built in 1900 in Manhattan, 10035. It has 8 residential units across 2 floors. The owner of record is Rahmana 26 LLC. HPD has recorded 126 housing violations here, most recently on October 14, 2023. 48 of the 50 most recent violations are still open.
- HPD violations
- 126
- DOB violations
- 19
- ECB violations
- 44
- HPD complaints
- 479
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 126
- CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 1st room from north at west located at apt 3f, 2nd story, 2nd apartment from west at north
Oct 14, 2023 · Apt 3F
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 2nd room from north at east located at apt 3f, 2nd story, 2nd apartment from west at north
Oct 14, 2023 · Apt 3F
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt 3f, 2nd story, 2nd apartment from west at north
Oct 8, 2023 · Apt 3F
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3f, 2nd story, 2nd apartment from west at north
Oct 8, 2023 · Apt 3F
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3f, 2nd story, 2nd apartment from west at north
Oct 8, 2023 · Apt 3F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 2nd story
Oct 8, 2023
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 2nd story
Oct 8, 2023
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling at public hall, 2nd story
Oct 8, 2023
Open — Nov sent out - BHazardous
Replace with new the missing the door at vestibule at public hall, 2nd story
Oct 8, 2023
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective connection pipe to sprinkler control valve north wall at public hall, 2nd story
Aug 23, 2023
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 23, 2023
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Aug 23, 2023
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Aug 23, 2023
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Aug 23, 2023
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeds the maximum of 130 degrees fahrenheit at hot water fixtures.... located at apt 1r, 2nd story, 1st apartment from east at south
Feb 23, 2021 · Apt 1R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color .. ..the ceiling in the kitchen located at apt 1r, 2nd story, 1st apartment from east at south
Feb 23, 2021 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system ....basement door locked... at boiler room
Feb 23, 2021
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1r, 2nd story, 1st apartment from east at south
Feb 23, 2021 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1r, 2nd story, 1st apartment from east at south
Feb 6, 2021 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1r, 2nd story, 1st apartment from east at south
Feb 6, 2021 · Apt 1R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling at public hall, 2nd story
Aug 21, 2020
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective lght fixture at ceiling at public hall, 2nd story
Aug 21, 2020
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame and iv1 card at 1st public hall from north, 1st story
Aug 18, 2020
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at 1st public hall from north, 1st story
Aug 18, 2020
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at 1st public hall from north, 1st story
Aug 18, 2020
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at 1st public hall from north, 1st story
Aug 18, 2020
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at 1st public hall from north, 1st story
Aug 18, 2020
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at 1st public hall from north, 1st story
Aug 18, 2020
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at 1st public hall from north, 1st story
Aug 18, 2020
Open — Nov sent out - BHazardous
Properly repair the broken or defective light fixtures at ceiling at 1st public hall from north, 1st story
Aug 18, 2020
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and west wall at 1st public hall from north, 1st story
Aug 18, 2020
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling and west wall at 1st public hall from north, 1st story
Aug 18, 2020
Open — Nov sent out - BHazardous
Properly repair the broken or defective light fixture at ceiling at public hall, 2nd story
Mar 23, 2019
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of pigtails at used at ceiling (3 total) at public hall, 2nd story
Mar 23, 2019
Open — Nov sent out - BHazardous
Properly repair the broken or defective light fixtures at ceiling at public hall, 2nd story
Feb 7, 2019
Open — Nov sent out - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 300 watts incandescent or equivalent at building front yard
Feb 7, 2019
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors door at bulkhead at public hall
Feb 7, 2019
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the dirt and grime at garbage colection area , 1st story
Sep 4, 2018
Open — Nov sent out - BHazardous
Abate the nuisance consisting of roaches, 1st story
Sep 4, 2018
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice, 1st story
Sep 4, 2018
Open — Nov sent out - BHazardous
Provide covers for garbage cans, total 6. , 1st story
Sep 4, 2018
Open — Nov sent out - BHazardous
Replace with new the broken or defective lower sash chains at window at east wall at public hall, 2nd story
Aug 14, 2018
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls at public hall, 2nd story
Aug 14, 2018
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the dirty floor at garbage room at public hall, 2nd story
Aug 14, 2018
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage room consisting of household items,television,air conditioners,bed frames,vinyl tiles, recyclable plastic items and cardboard boxes. at public hall, 2nd story
Aug 14, 2018
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice at public hall, 2nd story
Aug 14, 2018
Open — Nov sent out - BHazardous
Abate the nuisance consisting of roaches at public hall, 2nd story
Aug 14, 2018
Open — Nov sent out - BHazardous
Replace with new the broken or defective cracked lower sash wire glass pane at east wall at public hall, 2nd story
Aug 14, 2018
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Jun 9, 2018
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jun 9, 2018
Open — Nov sent out
DOB building violations · 19
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 19, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 7, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 26, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 29, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 16, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 6, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 6, 2011
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 23, 2011
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 15, 2010
Dob violation - dismissed
Show 9 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Electric signs none
Es-electric signs none
Sep 23, 1999
Vw-violation work without permit - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed - Boiler boiler optional
B-boiler boiler optional
Jan 16, 1992
Vp*-violation unserved ecb- dismissed - Boiler boiler optional
36/32
Jan 18, 1990
Dob violation - dismissed
ECB violations · 44
- Class - 2
Altered/changed building occupied without a valid c of o: at the time of inspection, observed at ground floor level, 2 commercial establishments occupied and operating as beauty shop and a gourmet market. dob r
Apr 15, 2026 · Penalty $1,250
Active - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#35461145k issued on 11/22/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.rem:comply with commissi
Dec 13, 2021 · Penalty $5,000
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons/violation #35461145k issued 11/22/19 and to file certificate of correction pursuant to 28-201.1 and 1rcny 102-01.altered changed bldg occupied w/
Sep 4, 2021 · Penalty $5,000
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35461145k issued on 11/22/19 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. altered changed bldg occupied w/o a valid ceryt of
Mar 2, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#35461145k issued on 11/22/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.altered changed building
Dec 29, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35466145k issued on 11-22-19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. occupancy contrary to t
Oct 20, 2020 · Penalty $3,125
Active - Class - 2
Failure to comply with commissioners order contained in summons/violation #35461145k issued on 11-22-2019,and to file a certificate of correction pursuant to 28-201.1 and 1 rcny 102-01.comply with commissioners
Mar 7, 2020 · Penalty $1,250
Resolve - Class - 1
Altered changed bldg occupied w/o a valid cert of occupancy as per bc 28-118.3.1;bc 28-118.3.2. note: 2nd fl being occupied w/8 apts where as the c of o dated 5-21-47 states 2nd fl to be light manufacting.
Nov 22, 2019 · Penalty $6,250
Active - Class - 2
Failure to comply with the commissioners order contained in summons/violation#35414908h issued on 05-11-2019 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.comply with commissione
Oct 8, 2019 · Penalty $3,125
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violations #35386535z issued on 2-21-2019 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.comply with commmissio
Sep 23, 2019 · Penalty $3,125
Resolve
Show 34 more ↓
- Class - 2
Failure to comply w/the comm's order contained in summons/vio#35414908h issued on 05-11-19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. alter changed bldg occupied w/o a valid cert of occupancy per
Aug 1, 2019 · Penalty $5,000
Resolve - Class - 2
Failure to comply with commissioners order con6tained in summons/violation #35386535z issued on 02-21-2019 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.altered changed building
Jul 13, 2019 · Penalty $3,125
Resolve - Class - 1
Altered changed bldg occupied w/o a valid c of o as per 28-118.3.1;28-118.3.2 2nd fl is being ocuppied as residential living c of o dated 5-21-47 states 2 floor to be light manufacturing. remedy: disc illegal
May 11, 2019 · Penalty $25,000
Active - Class - 2
Failure to comply with the commissioner's order contained in sum/vio #35386535z issued on 02/21/19 & to file a c of c pursuant to 28-201.1 &1rcny 102-01. remedy: comply with commissioner's order &/or file a c o
May 4, 2019 · Penalty $3,125
Resolve - Class - 1
I observed in commercial area of building several painted sprinkler heads in back of store which causes sprinkler head not to disengage in case of a fire and is prohibited and not code-complaint , repair and/re
Mar 25, 2019 · Penalty $6,250
Active - Class - 1
Altered/changed building occupied w/o a valid c of o as per 28-118.3.1-28-118.3.2. 2nd fl has been changed from light manufacturing to residential living under job#10150017z no new c of o on file. remedy:obtain
Mar 9, 2019 · Penalty $25,000
Active - Class - 1
Altered/changed building occupied without a valid certificate of occupancy as per 28-118.3.2 noted: alt 1 #101500172 permit issued on 7/10/19 expired 7/10/98. at time of inspection i observed 2nd floor
Feb 21, 2019 · Penalty $25,000
Active - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35372431r issued on 11/29/2018 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for bldg occupied with
Jan 9, 2019 · Penalty $3,125
Resolve - Class - 1
Altered/changed buildng occupied without or valid certificate of occupancy.note:above premise was altered under job#10150017z.to change 2nd flr from light manufacturing show rooms and offices to apartments no n
Nov 29, 2018 · Penalty $12,500
Active - Class - 2
Failure to maintain bldg in code-compliant manner. noted: upon inspection of location observed a metal roll-up gate that is rusted ad deterioratig.also observed a metal rod that is supporting the metal roll-up
Jun 8, 2018 · Penalty $3,125
Active - Class - 2
Failure to comply with the commissioners orde to file a certificate ofcorrection with dob for violation #34893676m,issued on 12/29/10.rem:file a certificate of correction.
Mar 2, 2018 · Penalty $2,000
Resolve - Class - 2
Failure to comply with the commissioners order to file a certificate of correction with dob for violation #34618972k issued on 04/29/08.rem:file a certificate of correction.
Mar 2, 2018 · Penalty $2,000
Resolve - Class - 2
Altered/changed bldg occupied w/out a valid c of o as per 28-118.3.1 - 28-118.3.2. noted: 2nd flr of above premise was covered to 8 apts under job# 101500172 said job was never signed off & no c of o issued. @
May 31, 2017 · Penalty $5,000
Active - Class - 2
Occupancy contrary to that allowed by the certificate of occupancy. noted:2nd floor having conversion from commercial space to 8 apt's as per job #101500172 that has not been signed off. conversion is contrary
Jun 14, 2016 · Penalty $6,000
Active - Class - 2
Altered/changed bldg occupied w/o a valid certificate of occupancy.bldg altered under permit #101500172 is occupied prior to sign off the spplication or valid certificate of occupancy(@time of inspection entire
May 31, 2016 · Penalty $2,500
Active - Class - 3
B354,32a,15,50a,50b,50c,50d. 50a-flue pipe need screws;50b-remove wash( )frin boiler room; 50c-peephole glass front of boiler dirty; 50d-pipe hot water relief valve discharge down. boiler #change.
Sep 21, 2013 · Penalty $200
Active - Class - 2
Altered/changed building occupied w/o a valid certificate of occupancyas per 28-118.3.1, 28-118.3.2 note: building altered under permit #101500172 is occupied w/o a valid certificate of occupancy.entire 2nd flr
Mar 5, 2013 · Penalty $300
Active - Class - 2
B254,50,50a,b,c,d. 50- has (welded) header on cast iron steam boiler. 50a- missing chimney base cleanout. 50b- missing section of boiler jacket and insulation. 50c- needs brass syphon tube on steam gauge. 50d-
Oct 10, 2012 · Penalty $500
Active - Class - 2
B254:38,50a,50b.50a:inadequate fresh air intake;90% of exterior air well covered w/solid steel plate;50b:soot covered boiler room ceiling & chimney top @ exterior - evidence of improper combustion.repair/correc
Aug 24, 2012 · Penalty $500
Active - Class - 2
B254,38,15,50a,b,c,d. 50a- pipe hot water relief valve discharge down no threaded end. 50b- no cleanout on flue or chimney base. 50c- remove(waste) oil from boiler room. 50d- remove excessive soot from boiler
Aug 11, 2012 · Penalty $250
Active - Class - 2
Fail to comply w/the commissioner's order to file a cert of correction w/the dob for nov #34893676m issued on 12/29/10 pursuant to 28-204.4 & 1rcny 102-01. occupancy on the 2nd flr manufacturing to apts. rem:fi
Jul 21, 2011 · Penalty $4,000
Resolve - Class - 1
Altered bldg occupied w/o a valid c of o. note: above premise was altered under job#101500172. to change 2nd floor from light manufacturing,show rooms, and offices, to apartments. no new c of o has been issue
Dec 29, 2010 · Penalty $5,000
Active - Class - 2
Failure to comply w/the comm's order to file cofc with the dob.respondent failed to comply w/the comm's order to correct the violating conditions and file a cofc pursuant to 28-204.2 for nov#34852308h.rem:corre
Dec 29, 2010 · Penalty $4,000
Resolve - Class - 2
Failure to comply w/the comm's order to file a cofc w/the dob.respondent failed to comply w/the comm's order to correct the violating conditions and file a cofc pursuant to 28-204.2 for nov#34852309j.rem:correc
Dec 29, 2010 · Penalty $4,000
Resolve - Class - 1
Fail to comply w.comm order. respondent failed to correct conditions cited in 34852231z for work w.o a permit at 1st fl commercial space a section of party wall approx 8 x 10 feet has been removed. at time of i
Dec 1, 2010 · Penalty $12,000
Resolve - Class - 1
Work w/o a permit work noted 1st commercial 248-250 e 125 st removed a section of the party wall appx 8x10 masonary no firestopping country the two commercial spaces at 1st floor rem: obtain permit or restore t
Sep 18, 2010 · Penalty $8,000
Active - Class - 2
50)rough start up on oil burner w/ fumes.service burner & clean boiler asap!
Sep 15, 2010 · Penalty $2,500
Active - Class - 1
Altered building 101500172 is occupied w/o a valid c of o. remedy: discontinue illegal use until a valid c of o is obtained.
Aug 10, 2010 · Penalty $5,000
Active - Class - 1
Failure to maintain. defect is: missing fire rated material throughoutcellar ceiling. handrail & guardrail missing at rear exterior stair leading to cellar. sprinkler heads obstructed by material storage at 1st
Aug 10, 2010 · Penalty $1,000
Active - Non-hazardous
Altered bldg occupied w/o a valid c of o. under job 101500172 no c/o was issued for 2nd floor. now there are 8 occupied apts at 2nd floor. remedy: obtain a valid c/o for job 101500172.
Apr 29, 2008 · Penalty $180
Active - Non-hazardous
Altered bldg occupied w/o a valid cofo alt type i # 101500172 noted: 2nd fl occupied by 8 apts.remedy:obtain valid cofo or discontinue illegal occupancy.
Dec 26, 2007 · Penalty $2,500
Active - Hazardous
Occupancy contrary to that allowed by the c of o of bldg dept records.note on 2nd fl level exist 8 class"a" apt through out contrary to c ofo # 32826 which show 2nd fl to office & manufacturing only.
Mar 11, 2007 · Penalty $2,500
Active - Hazardous
Failure to maintain plumbing and/or appurtenances- hazardous. remedy:maintain plumbing and or appurtenances. location: cellar , water pipe leakimg between water meter and main water valve.
Oct 28, 1999 · Penalty $2,500
Active - Non-hazardous
Safety valve is set at 100 psi. thereafter biler shall be equipment with a feed water pump galvanizes nipple in steam and pressure tempature to be repalced by block steel
Jan 18, 1990 · Penalty $35
Resolve
Complaints
- Heat/hot water
Entire building
Oct 10, 2026 · Apt BLDG
Open - Heat/hot water
Entire building
Oct 10, 2026 · Apt BLDG
Open - Heat/hot water
Entire building
Oct 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 29, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 11, 2025 · Apt BLDG
Close
Show 40 more ↓
- Unsanitary condition
Garbage/recycling storage
May 3, 2025 · Apt BLDG
Close - Electric
Lighting
Apr 11, 2025 · Apt ENTRAN
Close - Plumbing
Water supply
Mar 13, 2025 · Apt 3R
Close - Heat/hot water
Entire building
Jan 20, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 20, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 20, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 20, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 26, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 25, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 12, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Dec 12, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 6, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 4, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 3, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 2, 2024 · Apt 2B
Close - Heat/hot water
Entire building
Mar 21, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 26, 2024 · Apt 2A
Close - Heat/hot water
Entire building
Feb 25, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 25, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 25, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 25, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 24, 2024 · Apt 3F
Close - Heat/hot water
Apartment only
Feb 18, 2024 · Apt 3F
Close - Heat/hot water
Entire building
Feb 16, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 3, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 7, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 4, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 23, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 22, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 7, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 21, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 22, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 22, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 22, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 21, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 21, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 21, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 21, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 18, 2022 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Store building (K4)
- Year built
- 1900
- Floors
- 2
- Residential units
- 8
- Building area
- 18,250 ft²
- Lot area
- 9,587 ft²
- Zoning
- C4-4D
- Community board
- 111
- Council district
- 8
- Block / lot
- 1789 / 30
- Assessed value
- $919,800
- Landmark / historic district
- No
Questions about 246 East 125 Street
Who owns 246 East 125 Street?
The owner of record in NYC Department of City Planning PLUTO data is Rahmana 26 LLC.
Does 246 East 125 Street have violations?
Yes. NYC HPD has recorded 126 housing violations at this property.
Is 246 East 125 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 246 East 125 Street built?
City records list 1900 as the year it was built.
How many apartments are in 246 East 125 Street?
It has 8 residential units and 12 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.