roofy

312 East 106 Street

Manhattan, NY 10029BBL 1-01677-0044Map

Owner of record: 312 E 106 Realty LLC

312 East 106 Street is a walk-up apartment building built in 1920 in Manhattan, 10029. It has 28 residential units across 6 floors. The owner of record is 312 E 106 Realty LLC. HPD has recorded 520 housing violations here, most recently on October 9, 2026. 39 of the 50 most recent violations are still open. City tax records listed 24 rent-stabilized apartments here in 2024.

HPD violations
520
DOB violations
14
ECB violations
58
HPD complaints
786

What to know

Concern
23 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 9, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
24
About 86% of the building's 28 apartments
Down from 26 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 520

  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3, 2nd story, 1st apartment from north at east

    Oct 9, 2026 · Apt 3

    Open — Violation open
  • C

    Provide an adequate supply of gas to the fixtures range at west wall in the kitchen located at apt 9, 3rd story, 1st apartment from east at south

    Aug 25, 2026 · Apt 9

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3, 2nd story, 1st apartment from east at south

    Aug 25, 2026 · Apt 3

    Open — First no access to re- inspect violation
  • B

    Trace and repair the source and abate the visible mold condition... observed more than 10sq ft at ceiling in the bathroom located at apt 9, 3rd story, 1st apartment from east at south

    Aug 25, 2026 · Apt 9

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 9, 3rd story, 1st apartment from east at south

    Aug 25, 2026 · Apt 9

    Open — Notice of issuance sent to tenant
  • B

    Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Aug 25, 2026

    Open — Nov sent out
  • C

    Immediately provide a fire guard as directed by the nyc dept. of housing preservation & development (hpd) and/or the nyc dept. of buildings (dob) to protect against fire hazards observed by hpd and/or dob. fire hazards observed by hpd have resulted in the following additional hpd violation(s): violation# 19173380, 19173390, 19173422, 19173424, 19173425, 19173427 in order to protect public safety against imminent fire hazards observed, a fire guard must be provided forthwith for continuous 24 hour coverage, notwithstanding the correction and certification dates set forth above (the correction and certification dates set forth above are applicable for purposes of civil penalties that may be assessed pursuant to nyc administrative code § 27-2115, but do not reflect the date by which a fire guard must be provided). a fire guard must be provided immediately due to the exigency of the dangerous fire hazard conditions observed. the violation requiring a fire guard to be provided will remain open until such time as the fire hazards resulting in the hpd violation(s) referenced above and/or the fire hazards resulting in related dob violation(s) have been dismissed.

    Aug 25, 2026

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective fire stopping material missing at all walls and ceiling at public hall, 6th story

    Aug 25, 2026

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective fire stopping material missing at all walls and ceiling at public hall, 5th story

    Aug 25, 2026

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective fire stopping material missing at all walls and ceiling at public hall, 4th story

    Aug 25, 2026

    Open — Nov sent out
Show 40 more ↓
  • C

    Properly repair with similar material the broken or defective fire stopping material missing at ceiling, east, west and north walls at public hall, 3rd story

    Aug 25, 2026

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective fire stopping material missing at ceiling, east, west and north walls at public hall, 2nd story

    Aug 25, 2026

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective fire stopping material missing at ceiling, east and west walls at public hall, 1st story

    Aug 25, 2026

    Open — Nov sent out
  • C

    Provide a safe and adequate supply of electric service to the fixtures all walls and ceiling in the entire apartment located at apt 9, 3rd story, 1st apartment from east at south

    Aug 25, 2026 · Apt 9

    Open — Invalid certification
  • B

    Properly repair or replace the broken or defective outlet at north wall in the kitchen located at apt 3, 2nd story, 1st apartment from east at south

    Aug 25, 2026 · Apt 3

    Open — Civ14 mailed
  • C

    Trace and repair the source and abate the visible mold condition... more than 30 sq ft at ceiling in the bathroom located at apt 9, 3rd story, 1st apartment from east at south

    Aug 19, 2026 · Apt 9

    Open — Notice of issuance sent to tenant
  • B

    Trace and repair the source and abate the visible mold condition... more than 10 sq ft at east wall in the 3rd room from north at east located at apt 9, 3rd story, 1st apartment from east at south

    Aug 19, 2026 · Apt 9

    Open — Notice of issuance sent to tenant
  • B

    Properly repair or replace the broken or defective reglaze the procelain enemal finish at the bathtub in the bathroom located at apt 9, 3rd story, 1st apartment from east at south

    Aug 19, 2026 · Apt 9

    Open — Nov sent out
  • B

    Repair the broken or defective connection drain pipe at wash basin in the bathroom located at apt 9, 3rd story, 1st apartment from east at south

    Aug 19, 2026 · Apt 9

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 9, 3rd story, 1st apartment from east at south

    Aug 19, 2026 · Apt 9

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 9, 3rd story, 1st apartment from east at south

    Aug 19, 2026 · Apt 9

    Open — Notice of issuance sent to tenant
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 9, 3rd story, 1st apartment from east at south

    Aug 19, 2026 · Apt 9

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective escutcheon plate at heat riser in the kitchen located at apt 9, 3rd story, 1st apartment from east at south

    Aug 19, 2026 · Apt 9

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north at east, the bathroom , the 2nd room from north at east, the kitchen located at apt 9, 3rd story, 1st apartment from east at south

    Aug 19, 2026 · Apt 9

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 9, 3rd story, 1st apartment from east at south

    Aug 19, 2026 · Apt 9

    Open — Nov sent out
  • C

    Fire escape defective. replace with new the broken, defective and/or missing metal tread 4th from bottom up at 5th story balcony at rear court at fire escape

    Jul 18, 2026

    Closed — Violation dismissed
  • C

    Fire escape defective. replace with new the broken, defective and/or missing metal tread 5th from bottom up at 2nd story balcony at rear court at fire escape

    Jul 18, 2026

    Closed — Violation dismissed
  • C

    Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods drop ladder out of gravity hook at west exterior wall at fire escape

    Jul 18, 2026

    Closed — Violation dismissed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes houshold items at 1st story balcony at west exterior wall at fire escape

    Jul 18, 2026

    Closed — Violation dismissed
  • C

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the construction material at west yard

    Jul 18, 2026

    Closed — Violation dismissed
  • C

    Immediately provide a fire guard as directed by the nyc dept. of housing preservation & development (hpd) and/or the nyc dept. of buildings (dob) to protect against fire hazards observed by hpd and/or dob. fire hazards observed by hpd have resulted in the following additional hpd violation(s): violation# 19089057 and 19089058 in order to protect public safety against imminent fire hazards observed, a fire guard must be provided forthwith for continuous 24 hour coverage, notwithstanding the correction and certification dates set forth above (the correction and certification dates set forth above are applicable for purposes of civil penalties that may be assessed pursuant to nyc administrative code § 27-2115, but do not reflect the date by which a fire guard must be provided). a fire guard must be provided immediately due to the exigency of the dangerous fire hazard conditions observed. the violation requiring a fire guard to be provided will remain open until such time as the fire hazards resulting in the hpd violation(s) referenced above and/or the fire hazards resulting in related dob violation(s) have been dismissed.

    Jul 18, 2026

    Open — Nov certified on time
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the private hallway located at apt 3, 2nd story, 1st apartment from north at east

    Jun 25, 2026 · Apt 3

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective baseboard at wash basin cabinet in the bathroom located at apt 3, 2nd story, 1st apartment from north at east

    Jun 25, 2026 · Apt 3

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3, 2nd story, 1st apartment from north at east

    Jun 25, 2026 · Apt 3

    Open — Notice of issuance sent to tenant
  • B

    Abate the nuisance consisting of pests. evidence of flies in the entire apartment located at apt 3, 2nd story, 1st apartment from north at east

    Jun 25, 2026 · Apt 3

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of scalding hot water above 130 degrees in the entire apartment located at apt 3, 2nd story, 1st apartment from north at east

    Jun 25, 2026 · Apt 3

    Closed — Violation closed
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Jun 1, 2026

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system door locked in basement at boiler room

    Jun 1, 2026

    Open — Not complied with
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 2nd story, 1st apartment from north at east

    Jun 1, 2026 · Apt 3

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3, 2nd story, 1st apartment from north at east

    May 13, 2026 · Apt 3

    Closed — Violation closed
  • B

    Repair the leaky and/or defective water supply pipe at kitchen sink in the kitchen located at apt 3, 2nd story, 1st apartment from north at east

    May 13, 2026 · Apt 3

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 3, 2nd story, 1st apartment from north at east

    May 13, 2026 · Apt 3

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3, 2nd story, 1st apartment from north at east

    May 13, 2026 · Apt 3

    Open — Notice of issuance sent to tenant
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3, 2nd story, 1st apartment from north at east

    May 13, 2026 · Apt 3

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3, 2nd story, 1st apartment from north at east

    Apr 29, 2026 · Apt 3

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3, 2nd story, 1st apartment from north at east

    Apr 29, 2026 · Apt 3

    Open — Notice of issuance sent to tenant
  • C

    M/d law abate the nuisance consisting of refrigerator with doors at public hall, 1st story

    Apr 29, 2026

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant material at west wall at public hall, 1st story

    Apr 29, 2026

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 3, 2nd story, 1st apartment from north at east

    Apr 29, 2026 · Apt 3

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3, 2nd story, 1st apartment from north at east

    Apr 29, 2026 · Apt 3

    Closed — Violation closed

DOB building violations · 14

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 7, 2024

    Dob violation - dismissed
  • Construction other optional

    Failure to comply with an order of the commissioner #050818feu11101ik per ordr repr wrk was to be substantially complt by july 02,2018.owner obtained prmts for alt2 #123236514,most recent of which reprd on march 22,21.bldg has not been reprd+prev vacated portns of the prop have not been made safe for occup.comply w/commish ordr#050821feu11101ik immed

    Aug 24, 2021

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 3, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 19, 2020

    Dob violation - dismissed
  • Construction other optional

    Failure to comply with commissioner's order #050818feu11101ik. per order,repair work was to be substantially complete by july 2, 2018 owner obtained permit #123236514-01-ew-ot on june 7, 2018 & performed some work but permit expired on nov. 17, 2018 and was not revised remedy: comply with commissiomers order #050818feu11101ik

    Mar 20, 2019

    Dob violation - active
  • Construction other optional

    Ftm 6s+c,semi detach,md,in close prox to act construct site observed to have cracks on ext strl walls&int part walls.exp1 west of bear wall cracks@window lintels/sills&spandrel brick @mult flrs.exp4,cracks@ window opngs&spandrel brick@all flrs.remedy:file plans&obt perm for remed wrk by 5/21/18.wrk substant comp by 7/2/18

    May 8, 2018

    Dob violation - active
  • Construction other optional

    Ftm 6st+c,nfp,semi detach in close prox to active construct site observed to have cracks on ext strl walls&int apts walls.exp1/west of interm bear wall,cracks at window lintels/sills&spundrel brick at mult flrs.remedy:own immed engage pe eval bldg.engage lic surveyor immed install crack monitors&dev opt monit prog.min 3 monit targets per flr

    Apr 18, 2018

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 13, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 13, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
Show 4 more ↓
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed

ECB violations · 58

  • Class - 2

    At time of inspection of 6 story building observed supported scaffold not to code specification as per 3314.1 causing hazardous conditions:1. planks not tied down 2. uneven surface/2x4 lumber 3. not tight to fa

    Aug 26, 2026 · Penalty $2,500

    Active
  • Class - 1

    At the time of my inspection of a 6-story existing building performing alteration ,demolition and floor removal operation from 1st floor to roof level throughout gross floor area. i observed upon review of depa

    Aug 26, 2026 · Penalty $10,000

    Active
  • Class - 2

    At time of inspection of 6 story alteration job observe sidewalk shed in place not to code specification causing hazardous conditions 1. not tight to facade causing debris to come trough 2. missing required cat

    Aug 26, 2026 · Penalty $2,400

    Active
  • Class - 1

    At time of inspection of 6 story alt renovation job in progress throughout occupied space observed open holes/floors without guardrails causing extreme danger to all.provide guardrails as required.

    Aug 26, 2026 · Penalty $5,000

    Active
  • Class - 1

    At time of inspection of 6 story mixed use building observed work beyond approved plans with complete gut renovation (floors, wall, partitions) to apartments causing hazardous conditions to occupants.provide pr

    Aug 26, 2026 · Penalty $2,500

    Active
  • Class - 2

    Bc 3303.10.1 at time of inspection of a 6 stories building under active demolition , i observed tenants occupied 2nd and 3rd floor while active demolition in on going , upon request for tenants protection plan

    Aug 20, 2026 · Penalty $2,500

    Active
  • Class - 2

    Bc 3303.2.3.1 at time of inspection of a 6 stories building under active demolition work in progress, i observed some floors area where demolition was taken place was in darkness without temporary lighting for

    Aug 20, 2026 · Penalty $2,500

    Resolve
  • Class - 1

    Atoi observed obstructed exit doorways and required means of egress. consisting of debris, trash bags, workers personal belongings,buckets, trash cans and a dust pan. creating a hazardous condition. all seen on

    Aug 13, 2026 · Penalty $2,500

    Resolve
  • Class - 1

    Atoi no approved plans on site. failure to maintain/display on site documents required by bc chapter 33.permit # m01310272pl,m01310272gc, m01316830fn., maintain/display required documents

    Aug 13, 2026 · Penalty $2,500

    Resolve
  • Class - 1

    Atoi observed excessive debris throughout all 6 floors. consisting of demolition debris. failure to maintain. job # m01310272, repair and/replace; follow tpp

    Aug 13, 2026 · Penalty $2,500

    Resolve
Show 40 more ↓
  • Class - 1

    Not complying with vacate order under complaint # 1477683 for ecb 041818cer03dy . also not complying with vacate order under complaint # 1725325 under dob 374877 ., comply with vacate order; comply with commiss

    Aug 13, 2026 · Penalty $25,000

    Active
  • Class - 1

    At time of inspection observed at rear of the building fire escape in state of disrepair missing tread between second and third floor. vacate apartment#3, repair and/replace

    Jul 17, 2026 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to provide unobstructed exit passageway. at time of inspection observed 6' high plywood nailed and blocking passageway to rear of building. this is a hazardous condition as tenants who use rear fire esc

    Jun 27, 2026 · Penalty $2,500

    Resolve
  • Class - 1

    Atoi observed workers on the 6th floor performing demolition work and cutting metal joists with a sawzall, contrary to partial stop work order #1725511, issued 5/15/2026, which prohibits all work under job #m01

    Jun 4, 2026

    Resolve
  • Class - 1

    Atoi observed approximately 8 cubic feet of construction debris stored on the 6th floor stairwell platform., maintain adequate construction housekeeping; clean up debris and maintain housekeeping.

    Jun 4, 2026 · Penalty $2,500

    Resolve
  • Class - 1

    At time of inspection of 6 story building observed construction renovation in progress and temporary construction equipment on site without providing requested, required documentation causing hazardous conditio

    May 15, 2026 · Penalty $2,500

    Resolve
  • Class - 2

    At time of inspection of 6 story gut renovation observed in adequate housekeeping throughout causing hazardous conditions to tenants 1. large holes in floors 2.excessive construction debris 3.cut expose pipes a

    May 15, 2026

    Resolve
  • Class - 1

    Failure to safeguard the public and property affected by construction operations. at the time of inspection it observed construction operations taking place in apartment above apartment 10 have caused a partial

    May 15, 2026 · Penalty $10,000

    Resolve
  • Class - 2

    At time of inspection of 6 story building observed sidewalk shed in place with permit m00053319 expired 5-28-22 causing hazardous conditions.

    Oct 31, 2024 · Penalty $3,125

    Resolve
  • Class - 2

    At time of inspection of 6 story mixed use building observed sidewalk shed in place with lighting not in operating conditions.provide lighting as required

    Oct 31, 2024 · Penalty $2,400

    Resolve
  • Class - 2

    At time of inspection of 6 story mixed use building observed supported scaffold in place with permit m00395813 expired 5-28-2022 causing hazardous conditions.

    Oct 31, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    At time of inspection of 6 story mixed use building observed sidewalk shed and supported scaffold in place with permit #m00053319/m00395813expired 5-28-22

    Sep 3, 2024 · Penalty $3,125

    Resolve
  • Class - 2

    At time of inspection of 6 story mixed use building observed sidewalk shed in place not maintained per code causing hazardous conditions 1. rotting wood, 2.exposed wiring and 3.missing vandal proof fixtures and

    Sep 3, 2024 · Penalty $2,400

    Resolve
  • Class - 2

    At time of inspection of 6 story mixed use building observed sidewalk shed in place without information panel on parapet causing hazardous conditions.provide information panel

    Sep 3, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    At time of inspection observed pipe scaffold at expo#1 m00395813-i1-sf-permit expires: 05/28/2022 -no construction activity taking place ,stop all use of pipe scaffold at expo#1stop all use of pipe scaffold at

    Jun 18, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    At time of inspection observed scaffold permits have expired under, (job no.m00495813 expired 05/28/2022). failure to file dob appr0ved permits., renew permit

    May 16, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    At time of inspection observed sidewalk shed permit has expired, (job no.m00053319 expired 05/13/2021). failure to file dob approved permit., renew permit

    May 16, 2024 · Penalty $1,250

    Resolve
  • Class - 1

    Sidewalk shed is cracked, with detached broads, and exposed electrical wires and vegetation growing on top. failure to maintain. sidewalk shed can collapse and or fall endangering property, occupants, life, and

    May 16, 2024 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to comply with the commissioners order contained in summons/violation# 35541879j issued on 12/11/2020 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. failure to file adequ

    May 14, 2024

    Resolve
  • Class - 2

    At time of inspection of 6 story mixed use building observed sidewalk shed in place with lighting not in operating condition causing hazardous conditions.provide lighting dusk/dawn

    Mar 15, 2024 · Penalty $5,000

    Resolve
  • Class - 2

    At time of inspection of 6 story mixed use building observed sidewalk shed in place without information panel on parapetprovide information panel

    Mar 15, 2024 · Penalty $5,000

    Resolve
  • Class - 2

    At time of inspection of 6 story mixed use building observed supported scaffold in place with permit m00395813 expired 5-28-22

    Mar 15, 2024 · Penalty $5,000

    Resolve
  • Class - 2

    Reviewed bis and dobnow revealed sws permit m00053319 expired 05/28/2022 and was not renewed and in violation of cited provision of law. building owner has responsibility of maintenance of sws per bc3307.6.5.3

    Feb 27, 2024 · Penalty $3,125

    Resolve
  • Class - 2

    Observed at 610am lights not maintained exp1 created dark areas of public sidewalk hazardous conditions of slip,trip,no preventive measures for criminal activity,bc3307.6.4.8 states sidewalk sheds shall illumin

    Feb 27, 2024 · Penalty $10,000

    Active
  • Class - 1

    Unlawful acts: failure to comply with the commissioners order contained in summons/violation# 35541879j issued on 12/11/2020 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01., compl

    Dec 21, 2023 · Penalty $6,250

    Resolve
  • Class - 2

    Inactive facade repair on 6 story building. observed sidewalk shed at exposure 1 with lose panels and rotten boards. hazard of falling objections exist for pedestrians walking under sidewalk shed. observed sws

    May 30, 2023 · Penalty $1,250

    Resolve
  • Class - 2

    Inactive facade repair on a 6 story building. observed supported scaffold approximately 60ft sitting on top of a sidewalk shed at exposure 1. upon researching dob records the permit #m00395813 expired 05/28/202

    May 30, 2023 · Penalty $1,250

    Resolve
  • Class - 2

    Inactive facade repair on a 6 story building. observed sidewalk shed at exposure 1. upon researching dob records the permit #m00053319 expired 05/28/2022.

    May 30, 2023 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to comply with dob commissioner's order #050818feu11101ik issued may 5,2018 which required owner file plans & obtain permits for remedial work by may 21,2018 & complete work substantially by july 2,2018

    Mar 9, 2023

    Resolve
  • Class - 2

    Site closed at time of inspection, observed a supported scaffold in place at exp.#1, approx 60ft high, upon researching the department of buildings data-base, i observed the permit for the supp. scaffold had ex

    Oct 17, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Site closed at time of inspection, observed a sidewalk shed in place at exp.#1, upon researching the department of buidings data-base, i observed the permit for the s.w.s had expired on 5/28/2022, renew permit

    Oct 17, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    3307.6.4.8 at time of inspection of a 6 story residential building facade jobsite.i observed a sidewalk shed in place at exp1 under permit# m00053319(active)upon further inspection it was observed the electrica

    Feb 23, 2022 · Penalty $10,000

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons.violation #39013568z issued on 11-27-19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to maintain buil

    Jun 9, 2021 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to comply w/the commissioner's order contained in summons/violation #39013568z issued on 11/27/19 & to file a certificate of correction pursuant to 28-201.1 & 1rcny 102-01.remedy:comply w/commissioner's

    Apr 9, 2021 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#39013568z issued on 11/27/19 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg in code compliant mannr.

    Feb 11, 2021 · Penalty $3,125

    Resolve
  • Class - 1

    Sec. 28-201.1 inadequate tenant protection plan. note: at time of inspection observed work being performed under the aforementioned job #. the submitted tpp lack specific means & methods of protecting tenants

    Dec 11, 2020 · Penalty $12,500

    Active
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#39013568z issued on 11/27/19 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg in code compliant manner.

    Dec 9, 2020 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order contained in summons/violation#39013568z issued on 11/29/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.rem:comply with commissi

    Oct 1, 2020 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to comply with commissioners order contained in summons/violation #39013568z issued on 11-27-2019,and to file a certificate of correction pursuant to 28-201.1 and 1 rcny 102-01.comply with commissioners

    Mar 7, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to post or properly post permit for work at premises:noted:upon inspection observed expired permit#m00053319 posted expiration date was 5/13/19. new valid permit is observed in dob public portal under s

    Jan 8, 2020 · Penalty $1,562

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Oct 7, 2026 · Apt 3

    Open
  • Unsanitary condition

    Pests

    Sep 28, 2026 · Apt 3

    Open
  • Electric

    Power outage

    Aug 28, 2026 · Apt 3

    Close
  • Paint/plaster

    Wall

    Aug 26, 2026 · Apt 9

    Close
  • Electric

    Power outage

    Aug 26, 2026 · Apt 9

    Close
  • General

    Signage missing

    Aug 25, 2026 · Apt 3

    Close
  • Electric

    Power outage

    Aug 25, 2026 · Apt 3

    Close
  • Electric

    Outlet/switch

    Aug 24, 2026 · Apt 3

    Close
  • Plumbing

    Water supply

    Aug 24, 2026 · Apt 3

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Aug 22, 2026 · Apt BLDG

    Close
Show 40 more ↓
  • Electric

    No lighting

    Aug 20, 2026 · Apt 2NDAND

    Close
  • General

    Bell/buzzer/intercom

    Aug 13, 2026 · Apt 9

    Close
  • Paint/plaster

    Wall

    Aug 13, 2026 · Apt 9

    Close
  • Unsanitary condition

    Mold

    Aug 13, 2026 · Apt 9

    Close
  • Plumbing

    Radiator

    Aug 13, 2026 · Apt 9

    Close
  • Door/window

    Door

    Aug 13, 2026 · Apt 9

    Close
  • Door/window

    Window frame

    Aug 13, 2026 · Apt 9

    Close
  • Electric

    Power outage

    Aug 6, 2026 · Apt 9

    Close
  • General

    Janitor/super

    Jul 26, 2026 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Jul 26, 2026 · Apt 3

    Close
  • Unsanitary condition

    Pests

    Jul 26, 2026 · Apt 3

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jul 26, 2026 · Apt 3

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jul 18, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jun 24, 2026 · Apt 3

    Close
  • Safety

    Fire escape

    Jun 24, 2026 · Apt 3

    Close
  • General

    Bell/buzzer/intercom

    Jun 24, 2026 · Apt 3

    Close
  • Plumbing

    Water supply

    Jun 24, 2026 · Apt 3

    Close
  • Plumbing

    Water supply

    Jun 5, 2026 · Apt 3

    Close
  • Plumbing

    Water supply

    Jun 5, 2026 · Apt 3

    Close
  • Paint/plaster

    Ceiling

    Jun 4, 2026 · Apt 9

    Close
  • General

    Cooking gas

    Jun 4, 2026 · Apt 9

    Close
  • Paint/plaster

    Ceiling

    Jun 4, 2026 · Apt 9

    Close
  • Plumbing

    Water supply

    Jun 4, 2026 · Apt 9

    Close
  • Unsanitary condition

    Mold

    Jun 4, 2026 · Apt 9

    Close
  • General

    Cooking gas

    Jun 4, 2026 · Apt 9

    Close
  • Heat/hot water

    Entire building

    Jun 2, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jun 1, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    May 31, 2026 · Apt 9

    Close
  • Heat/hot water

    Entire building

    May 30, 2026 · Apt 3

    Close
  • Plumbing

    Basin/sink

    May 24, 2026 · Apt 3

    Close
  • Paint/plaster

    Ceiling

    May 14, 2026 · Apt 10

    Close
  • Plumbing

    Toilet

    May 14, 2026 · Apt 10

    Close
  • Plumbing

    Water supply

    May 14, 2026 · Apt 10

    Close
  • Plumbing

    Water supply

    May 12, 2026 · Apt 3

    Close
  • Appliance

    Refrigerator

    Apr 30, 2026 · Apt 3

    Close
  • Unsanitary condition

    Mold

    Apr 25, 2026 · Apt 3

    Close
  • Appliance

    Refrigerator

    Apr 20, 2026 · Apt 3

    Close
  • General

    Bell/buzzer/intercom

    Apr 14, 2026 · Apt 3

    Close
  • Plumbing

    Basin/sink

    Apr 14, 2026 · Apt 3

    Close
  • Flooring/stairs

    Floor

    Apr 14, 2026 · Apt 3

    Close

Sales history

DatePriceTypeUnits
Jan 7, 2026$3,000,000Rentals - walkup apartments29

Building details

Building type
Walk-up apartment building (C7)
Year built
1920
Floors
6
Residential units
28
Building area
15,330 ft²
Lot area
3,785 ft²
Zoning
R7A
Community board
111
Council district
8
Block / lot
1677 / 44
Assessed value
$1,020,600
Landmark / historic district
No

HPD registration #119743, last renewed May 12, 2026.

Questions about 312 East 106 Street

Who owns 312 East 106 Street?

The owner of record in NYC Department of City Planning PLUTO data is 312 E 106 Realty LLC.

Does 312 East 106 Street have violations?

Yes. NYC HPD has recorded 520 housing violations at this property.

Is 312 East 106 Street rent stabilized?

NYC Department of Finance tax bills listed 24 rent-stabilized units here in 2024 (about 86% of its 28 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 312 East 106 Street built?

City records list 1920 as the year it was built.

How many apartments are in 312 East 106 Street?

It has 28 residential units and 29 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.