315 East 105 Street
Manhattan, NY 10029BBL 1-01677-0009Map
Owner of record: Ka2 Development LLC
315 East 105 Street is an elevator apartment building built in 2004 in Manhattan, 10029. It has 24 residential units across 7 floors. The owner of record is Ka2 Development LLC. HPD has recorded 17 housing violations here, most recently on December 18, 2025. City tax records listed 24 rent-stabilized apartments here in 2018.
- HPD violations
- 17
- DOB violations
- 11
- ECB violations
- 4
- HPD complaints
- 60
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 17
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 7d, 7th story, 1st apartment from south at west
Dec 18, 2025 · Apt 7D
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2b, 2nd story, 1st apartment from east at south
Sep 7, 2024 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch of hopper door at compactor closet at public hall, 6th story
Aug 9, 2024
Closed — Violation closed - ANon-hazardous
Repair the leaky and/or defective faucets at shower stall in the bathroom located at apt 6c, 6th story, 2nd apartment from east at south
Jul 15, 2024 · Apt 6C
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at compactor closet door at public hall, 6th story
Jul 15, 2024
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective faucet at bathtub in the bathroom located at apt 6c, 6th story, 1st apartment from west at north
Jul 12, 2024 · Apt 6C
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 7b, 7th story, 1st apartment from east at south
Jan 15, 2024 · Apt 7B
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 7b, 7th story, 1st apartment from east at south
Jan 15, 2024 · Apt 7B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 7d, 7th story, 1st apartment from south at west
Oct 25, 2023 · Apt 7D
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 19, 2021
Closed — Violation dismissed
Show 7 more ↓
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 19, 2021
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective light fixture at ceiling at public hall, 4th story
Mar 18, 2020
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective light fixture at ceiling at public hall, 3rd story
Mar 18, 2020
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches at compactor closet, 2nd story
Jan 29, 2020
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 7c, 7th story, 2nd apartment from east at south
Mar 8, 2017 · Apt 7C
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 25, 2016
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Apr 22, 2015
Closed — Violation dismissed
DOB building violations · 11
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 7, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 28, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 26, 2010
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 2, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 20, 2006
Dob violation - resolved
Show 1 more ↓
- Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Oct 1, 2005
Dob violation - dismissed
ECB violations · 4
- Class - 2
Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #913945. remedy: submit acceptable requ
Apr 11, 2024 · Penalty $1,250
Active - Class - 2
Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control# 813945. remedy: submit required technical report
Oct 15, 2018 · Penalty $625
Resolve - Class - 2
B251.100l11,61l10,68m07,67l10,39o02,41l10,05l10,40o02,70o02,03l10,15i10.#100:fire ext(abc)#61:ground & comm in same line.#69:no maint log.# 67:phone not work.#39:clean car top.#40:clean m.r.#70:clean pit.#41:se
Mar 21, 2014
Resolve - Non-hazardous
Failure to safeguard public and property affected by construction operations.noted:cracks appear on adjacent building wall adjacent to excavation and underpinning.building affected is 319 e 105 st on walls abov
May 24, 2004 · Penalty $1,000
Resolve
Complaints
- Plumbing
Toilet
Jun 1, 2026 · Apt 3B
Close - Plumbing
Water supply
Jan 15, 2026 · Apt 7D
Close - Heat/hot water
Apartment only
Dec 15, 2025 · Apt 7D
Close - Heat/hot water
Entire building
Nov 20, 2025 · Apt 7D
Close - Heat/hot water
Entire building
Nov 17, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 17, 2025 · Apt 3B
Close - Heat/hot water
Entire building
Nov 16, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 28, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 27, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 16, 2024 · Apt BLDG
Close
Show 40 more ↓
- General
Cabinet
Aug 12, 2024 · Apt ALL
Close - Unsanitary condition
Pests
Aug 12, 2024 · Apt ALL
Close - Plumbing
Toilet
Jul 30, 2024 · Apt 6C
Close - Plumbing
Basin/sink
Jul 30, 2024 · Apt 6C
Close - Plumbing
Bathtub/shower
Jul 30, 2024 · Apt 6C
Close - Door/window
Door
Jul 2, 2024 · Apt 16
Close - Plumbing
Basin/sink
Jul 2, 2024 · Apt 16
Close - Plumbing
Bathtub/shower
Jul 2, 2024 · Apt 16
Close - Plumbing
Water supply
Jun 20, 2024 · Apt 6C
Close - Plumbing
Bathtub/shower
Jun 20, 2024 · Apt 6C
Close - Door/window
Door
Jun 20, 2024 · Apt 6C
Close - Plumbing
Water supply
Jun 7, 2024 · Apt 6C
Close - Plumbing
Bathtub/shower
Jun 7, 2024 · Apt 6C
Close - Plumbing
Water supply
May 9, 2024 · Apt 3B
Close - Heat/hot water
Entire building
Feb 11, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 21, 2024 · Apt 7B
Close - Heat/hot water
Apartment only
Jan 21, 2024 · Apt 7B
Close - Heat/hot water
Apartment only
Jan 16, 2024 · Apt 7B
Close - Heat/hot water
Apartment only
Jan 13, 2024 · Apt 7B
Close - Heat/hot water
Entire building
Dec 30, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 16, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 23, 2023 · Apt 7D
Close - Heat/hot water
Entire building
Oct 19, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 26, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 26, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 24, 2022 · Apt 4B
Close - Heat/hot water
Apartment only
Nov 16, 2022 · Apt 7D
Close - Plumbing
Water supply
Oct 26, 2022 · Apt 7B
Close - Heat/hot water
Apartment only
Oct 17, 2022 · Apt 7D
Close - Heat/hot water
Apartment only
Oct 17, 2022 · Apt 7D
Close - Heat/hot water
Apartment only
Oct 16, 2022 · Apt 7D
Close - Heat/hot water
Entire building
Oct 16, 2022 · Apt 7D
Close - Heat/hot water
Apartment only
Oct 16, 2022 · Apt 7D
Close - Heat/hot water
Entire building
Oct 3, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 3, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 3, 2022 · Apt BLDG
Close - Plumbing
Basin/sink
May 16, 2022 · Apt 1H
Close - Door/window
Door
May 16, 2022 · Apt 1H
Close - Plumbing
Bathtub/shower
May 16, 2022 · Apt 1H
Close - General
Cabinet
May 16, 2022 · Apt 1H
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 2004
- Floors
- 7
- Residential units
- 24
- Building area
- 18,207 ft²
- Lot area
- 4,037 ft²
- Zoning
- R7A
- Community board
- 111
- Council district
- 8
- Block / lot
- 1677 / 9
- Assessed value
- $1,985,400
- Landmark / historic district
- No
HPD registration #142773, last renewed Jul 16, 2026.
Questions about 315 East 105 Street
Who owns 315 East 105 Street?
The owner of record in NYC Department of City Planning PLUTO data is Ka2 Development LLC.
Does 315 East 105 Street have violations?
Yes. NYC HPD has recorded 17 housing violations at this property.
Is 315 East 105 Street rent stabilized?
NYC Department of Finance tax bills listed 24 rent-stabilized units here in 2018 (about 100% of its 24 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 315 East 105 Street built?
City records list 2004 as the year it was built.
How many apartments are in 315 East 105 Street?
It has 24 residential units and 25 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.