2295 2 Avenue
Manhattan, NY 10035BBL 1-01667-0028Map
Owner of record: Youth Action Limitedpartnership
2295 2 Avenue is a walk-up apartment building built in 1910 in Manhattan, 10035. It has 13 residential units across 4 floors. The owner of record is Youth Action Limitedpartnership. HPD has recorded 142 housing violations here, most recently on January 27, 2026. 13 of the 50 most recent violations are still open. City tax records listed 14 rent-stabilized apartments here in 2024.
- HPD violations
- 142
- DOB violations
- 27
- ECB violations
- 33
- HPD complaints
- 187
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 142
- CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Jan 27, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2c, 2nd story, 1st apartment from west at north
Jan 27, 2026 · Apt 2C
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2d, 2nd story, 1st apartment from south at west , section at west
Jan 14, 2026 · Apt 2D
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2d, 2nd story, 1st apartment from south at west , section at west
Jan 14, 2026 · Apt 2D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department east wall, including window well in the 1st room from east located at apt 2a, 2nd story, 1st apartment from west at north , section ''east''
Dec 18, 2025 · Apt 2A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the private hallway located at apt 2a, 2nd story, 1st apartment from west at north , section ''east''
Dec 18, 2025 · Apt 2A
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 2a, 2nd story, 1st apartment from west at north , section ''east''
Dec 18, 2025 · Apt 2A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective sink base cabinet in the kitchen located at apt 2a, 2nd story, 1st apartment from west at north , section ''east''
Dec 18, 2025 · Apt 2A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the bathroom located at apt 2a, 2nd story, 1st apartment from west at north , section ''east''
Dec 18, 2025 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Dec 16, 2025
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2c, 2nd story, 1st apartment from west at north , section at west
Dec 16, 2025 · Apt 2C
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective intercom at west wall in the foyer located at apt 2d, 2nd story, 4th apartment from north at east
Nov 28, 2025 · Apt 2D
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective pressure relief valve at boiler at boiler room
Sep 10, 2025
Closed — Violation dismissed - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at at east court yard
Aug 11, 2025
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq. feet at ceiling in the bathroom located at apt 2d, 2nd story, 1st apartment from south at west , section ''west''
Aug 11, 2025 · Apt 2D
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at the ceiling in the bathroom located at apt 2d, 2nd story, 1st apartment from south at west , section at west
Aug 6, 2025 · Apt 2D
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missng in the entire apartment located at apt 2d, 2nd story, 1st apartment from south at west , section at west
Aug 6, 2025 · Apt 2D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from north at east located at apt 2d, 2nd story, 1st apartment from south at west , section at west
Aug 6, 2025 · Apt 2D
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the bathroom located at apt 2d, 2nd story, 1st apartment from south at west , section at west
Aug 6, 2025 · Apt 2D
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of water leak at boiler at boiler room
Jun 3, 2025
Open — Second no access to re-inspect violation - BHazardous
Remove the illegal fastening key operated lock at public hall bulkhead door , section at east
May 14, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective defective door latch at vestibule at public hall, 1st story
May 14, 2025
Closed — Violation closed - BHazardous
Remove the illegal fastening key operated lock at public hall bulkhead , section at west
May 14, 2025
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and south wall at public hall bulkhead , 4th story, section at east
May 14, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant ceiling approx 5 sq ft. at public hall bulkhead , 4th story, section at east
May 14, 2025
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeds maximum allowed temperature of 130 degrees at hot water fixtures in the entire apartment located at apt 2d, 2nd story, 1st apartment from east at south
Jan 31, 2025 · Apt 2D
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of bicycles at bulkhead
Jan 31, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective gfci outlet at south wall in the kitchen located at apt 2d, 2nd story, 1st apartment from south at west
Jan 31, 2025 · Apt 2D
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and walls at public hall, 1st story
Dec 12, 2024
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Dec 12, 2024
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2d, 2nd story, 1st apartment from south at west
Oct 19, 2024 · Apt 2D
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2d, 2nd story, 1st apartment from south at west
Oct 19, 2024 · Apt 2D
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection wasteline pipe under sink in the kitchen located at apt 4d, 4th story, 1st apartment from south at west
Sep 28, 2024 · Apt 4D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vestibule ceiling; north, west and south walls at public hall
Sep 28, 2024
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in sink in the kitchen located at apt 4d, 4th story, 1st apartment from south at west
Sep 28, 2024 · Apt 4D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department vestibule ceiling; north, west and south walls at public hall
Sep 28, 2024
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2d, 2nd story, 1st apartment from south at west
Sep 5, 2024 · Apt 2D
Closed — Violation closed - CImmediately hazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 2d, 2nd story, 1st apartment from south at west
Sep 5, 2024 · Apt 2D
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at door to cellar (west section) at public hall, 1st story
Sep 5, 2024
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2d, 2nd story, 1st apartment from south at west
Sep 5, 2024 · Apt 2D
Closed — Violation closed - BHazardous
Replace with new the missing door at sink base cabinet in the kitchen located at apt 2d, 2nd story, 1st apartment from south at west
Sep 5, 2024 · Apt 2D
Closed — Violation closed - BHazardous
Replace with new the missing drawer at sink base cabinet in the kitchen located at apt 2d, 2nd story, 1st apartment from south at west
Sep 5, 2024 · Apt 2D
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water (at 169 degrees f.) exceeding the maximum allowable temperature of 130 degrees (f) at all fixtures creating a hazard in the entire apartment located at apt 2d, 2nd story, 1st apartment from south at west
Sep 5, 2024 · Apt 2D
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective drawer at sink base cabinet in the kitchen located at apt 2d, 2nd story, 1st apartment from south at west
Sep 5, 2024 · Apt 2D
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at fire door to east section at public hall, 1st story
Sep 5, 2024
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 3; in the entire apartment located at apt 2d, 2nd story, 1st apartment from south at west
Sep 5, 2024 · Apt 2D
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2d, 2nd story, 1st apartment from south at west
Sep 5, 2024 · Apt 2D
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls in the bathroom located at apt 2d, 2nd story, 1st apartment from south at west
Sep 5, 2024 · Apt 2D
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling at east bulkhead at public hall, 4th story
Sep 5, 2024
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retarding material at ceiling at east bulkhead at public hall, 4th story
Sep 5, 2024
Closed — Violation closed
DOB building violations · 27
- Construction other optional
Failure to maintain building in code compliant manner.observed the fol lowing defected conditions.exposure 1 north elevation,crack at parapet and spalling above window lintels,crack stuco and corrosions of fire e scape.spalling missing stone exposure 2.spalling exposure 3.crack expo sure 4.remedy:repair and/or replace
May 19, 2026
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Construction other optional
Failure to maintain building in a code compliant manner.note at time o f inspection,exp1 north elev,spalling stucco at parapet.spalling brick at parapet window area rusted corroded lintels.loose spalling stucco i n multiple areas of exp1,exp2 loose stucco cracks on stucco.at parapet lv missing brick exp3 observed damaged coping stone.repair or replace
Mar 25, 2025
Dob violation - active - Construction other optional
Failure to maintain building in a compliant manner. note: at time of inspection exp#1 north elev loose/spalling stucco @ parapet spalling brick @ parapet/window area. rusted corroded lintes, loose spalling stucco in multiple areas @ exp4, exp 2 loose stucco cracks on stucco @ parapet stucco. remedy: repair and/or replace
Oct 1, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 10, 2024
Dob violation - active - Construction other optional
Failure to maintain bldg in compl manner.exp#1 (n.ele) loose spalling stucco. parapet spalling brk¶/window arches; rusted/corroded lintels;loose sealant arnd wind:@ exp2 (e.ele) loose struc & parapet lev; spalled/missing brk@ 2nd lev;cracks on stucco;vert crk @ crn of exp3 spall/spalling brks;hairline crks. remedy:fix and/or replace
May 7, 2024
Dob violation - active - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Jan 8, 2024
Dob violation - active - Immediate emergency anythingoptional
Remedy: erect 115' linear feet of sidewalks shed at exposure #1 north elevation and appoximately 65' lieaner feet at exposure #2 east elevat ion. also provide sidewalk shed in courtyard at northeast corner appr ox 65' linear feet and 25' linear feet respectively
Jan 8, 2024
Dob violation - dismissed - Construction other optional
Emergency work order due to defective-spalling stucco/bricks&hairline cracks at 2nd level on exp#2;spalling brick&step crack@ parapet level on exp#3;step crack at parapet level on exp#4 and missin/broken camel coping stone@roof level exp#1,3&4.remedy:immed.remove/fix defect.cond &provide safety measures under dirct supervision of lic.professsional
Jan 4, 2024
Dob violation - active - Construction other optional
Failure to maintain exterior building at time of inspection@expo#1 parapet level spalling stucco spalling brick at paarapet level and near window arches.exp#2 spalling brick hairline cracks at 3rd level exp#3spalling brick step crack at parapet level.@ exp#4 step crack @ parapet level.remedy:fix and repair exterior building
Jan 4, 2024
Dob violation - active
Show 17 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 31, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 22, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 11, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 30, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 4, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 7, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - active
ECB violations · 33
- Class - 1
Failure to provide unobstructed exit passageway. note: at the time of inspection observed item stored at the 2nd floor landing at exposure 1north elevation. remedy: remove egress obstruction.
May 19, 2026 · Penalty $2,500
Active - Class - 2
Expired sidewalk shed permit. note: at the time of inspection observedthat permit #140646718-01-eq-sh expires on 05/31/2019. remedy: renew permit.
May 19, 2026 · Penalty $3,125
Active - Class - 2
Expired sidewalk shed permit. at time of inspection observed sidewalk shed in place. at building exp #1 and 2 observed no valid permit posted or on bis or dob now. remedy: renew permit.
Mar 25, 2025 · Penalty $3,125
Active - Class - 2
Expired sidewalk shed permit. note at time of inspection observed sidewalk shed in place at building exposure #1, 2 observed no valid permitposted or no valid permit on bis or dob now. remedy: renew permit.
Oct 1, 2024 · Penalty $1,250
Active - Class - 2
Failure to comply with commissioner's order contained in summons#35639801p issued on 12/30/2021,and failure to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2).an acceptable certific
Aug 26, 2024 · Penalty $1,250
Active - Class - 2
At time of inspection of 4 story building observed sidewalk shed in place with permit 140646718 expired 5-31-2019
May 21, 2024 · Penalty $1,250
Active - Class - 1
Failure to provide unobstructed exit passageway.note:observed at 2nd level fire escape obstruction caused by garage bag on exp#1(north elevation).rem:remove obstruction.
May 7, 2024 · Penalty $1,250
Active - Class - 2
Project information panel/sidewalk shed parapet panel/construction sign not provided or not properly secured and leaning outward in danger of falling onto parked cars causing proerty damage. remedy: comply with
Aug 11, 2023 · Penalty $1,250
Active - Class - 2
At time of inspection i observed sidewalk shed erected and inadequately maintained with panels not properly secured and leaning outward in danger of falling onto street causing property damage to cars.properly
Aug 11, 2023 · Penalty $1,250
Active - Class - 2
At time of inspection i observed sidewalk shed erected and inadequately maintained upon search in dob now and bis both showed permit has expired 5-31-2019 and has not been renewedproperly renew and maintain per
Aug 11, 2023 · Penalty $1,250
Active
Show 23 more ↓
- Class - 2
Temporary construction equipment on site-expired permit. at time of inspection i observed sidewalk shed erected and inadequately maintained upon search in dob now and bis systems both show permit has expired on
Aug 11, 2023 · Penalty $1,250
Active - Class - 2
At time of inspection of 4 story of building observed sidewalk shed in place not maintained 1.parapets leaning 2.rotted mudsills 3.bolt covers missing 4. rotted metal 5. rotting wood 6. vandal proof fixture mis
Jul 28, 2023 · Penalty $2,400
Active - Class - 2
At time of inspection observed of 4 story building with sidewalk shed in place with permit 140646718 expired 5-31-2019
Jul 28, 2023 · Penalty $1,250
Active - Class - 2
At time of inspection observed sidewalk shed in place not maintained bracing not secure bulb out parapets leanings and corrugated metal and planks rotted create unsafe condition for pedestrial comply
Mar 28, 2023 · Penalty $2,400
Active - Class - 2
At time of inspection observed sidewalk shed erected at exposure# 1-2 no filing was found in bis or dobnow for permit for sidewalk shedobtain permit
Mar 28, 2023 · Penalty $1,250
Active - Class - 2
Failure to obtain temporary construction permit observed sidewalk shederected at exposure 4 no filing was found in bis or dobnow for permit for sidewalk shed.rem:obtain permit.
Jun 27, 2022 · Penalty $1,250
Active - Class - 2
Expired permit.note:at time of inspection observed sidewalk shed in place with permit 140646718 expired 5/31/19.remedy:comply with code-renew permit.
Dec 30, 2021 · Penalty $3,125
Active - Class - 2
Failure to maintain.note:at time of inspection observed sidewalk shed in place not maintained bracing not secure bulb out parapets leanings.remedy:comply with code-maintain
Dec 30, 2021 · Penalty $2,400
Active - Class - 2
Expired temporary construction equipment.at time of my inspection i observed a 4 story building occupied.i noticed a sws on site upon doing my research i came across no permits valid for sidewalk.rem:comply wit
Jul 13, 2020 · Penalty $1,250
Active - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35345976n issued on 07-18-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg walls or appurtenances. remedy: comply
Sep 8, 2018 · Penalty $625
Resolve - Class - 1
Failure to maintain building walls or appurtenances.noted:at exp#1 at e 118 st vertical masonry cracks with missing plaster cladding at parapet.at exp #2 facing to 2nd ave horizontal cracks at bricks between 3
Jul 18, 2018 · Penalty $6,250
Resolve - Class - 1
Failure to maintain building walls or appurtenances.noted:at exp#1 horizontal crack on exterior bric wall at exp.#2,vertical crack at the corner of the building where brick connects.crack from top of roof to bo
May 31, 2018 · Penalty $6,250
Resolve - Class - 1
Failure to maintain bldg wall(s) or apputrenance.noted:observed @exp#4facing east 118 street between third & fourth fl horizontal cracks.rem:maintain exterior bldg wall.
Apr 19, 2018 · Penalty $6,250
Resolve - Class - 1
Failure to maintain building wall(s) or appurtenances. note: at the time of inspection observed exposure #4 facing east 118th street between 3rd floor and 4th floors horizontal cracked areas at 15-20', vertical
Mar 6, 2018 · Penalty $1,000
Resolve - Class - 1
Failure to maintain building walls or appurtenances.noted:at the time of inspection @ exp#2 a vertical crack at the corner of the building where the brick connect.the crack is approx:25'long.rem:maintain buildi
Jan 2, 2018 · Penalty $1,000
Resolve - Class - 1
Failure to maintain building wall(s)or appurtenances.at the time of myinspection at the above address on the above date i observed vertical cracks at exposure 2 and exposure 4 of the building.*photos taken*rem:
Nov 11, 2017 · Penalty $500
Resolve - Non-hazardous
Failure to provide approved plans. remedy: provide approved plans.
Oct 7, 1998 · Penalty $2,500
Active - Non-hazardous
Work without a permit. noted: at time of inspection an excavation machine was digging a hole & another hole approx 6'0 deep was already dug.a review of dept records sho no permit was issued for said work. "stop
Oct 7, 1998 · Penalty $2,500
Active - Hazardous
Failure to provide 8 foot high fence where required during excavation operations. "stop all work" remedy: provide fence in accordance with code make safe.
Oct 7, 1998 · Penalty $2,500
Active - Non-hazardous
No department of transportation permit posted for crossing the sidewalk noted: excavation machine at said premises in operation at time of inspection. remedy: obtain necessary permits.
Oct 7, 1998 · Penalty $2,500
Active - Hazardous
Failure to weather proof adjacent building upon inspection at said premises the beams pockets was not filled on floor no 2,3,4, and otherholes was not nake good or parged up to make it weather tight see phot
Aug 6, 1998 · Penalty $500
Resolve - Hazardous
Failure tosafeguard public and property in that there is no 8 ft. fence around the site at time of inspection there was two caste iorn pipes appx 3 ft. long and one contaner no fence see photo. remedy:
Aug 6, 1998
Resolve - Non-hazardous
Work without a permit work noted entire interior renovation of 3rd &4th fllor, new paritions and ceiling windows,door & plywood floor remedy"stop work" obtain permits and approvals from this dept. submit engine
Oct 1, 1990
Resolve
Complaints
- Door/window
Window frame
Sep 16, 2026 · Apt 3A
Open - Plumbing
Toilet
Sep 16, 2026 · Apt 3A
Open - Paint/plaster
Wall
Sep 16, 2026 · Apt 3A
Open - Plumbing
Basin/sink
Jul 7, 2026 · Apt 2A
Open - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 24, 2026 · Apt 2C
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 17, 2025 · Apt 2C
Close - Heat/hot water
Apartment only
Dec 14, 2025 · Apt 2C
Close - Plumbing
Basin/sink
Dec 4, 2025 · Apt 2A
Close
Show 40 more ↓
- Plumbing
Bathtub/shower
Dec 4, 2025 · Apt 2A
Close - Door/window
Window pane
Dec 4, 2025 · Apt 2A
Close - Unsanitary condition
Mold
Aug 4, 2025 · Apt 2D
Close - Water leak
Slow leak
Aug 4, 2025 · Apt 2D
Close - Paint/plaster
Wall
Aug 4, 2025 · Apt 2D
Close - Door/window
Door
Jan 19, 2025 · Apt 2B
Close - Plumbing
Basin/sink
Sep 24, 2024 · Apt 4D
Close - Unsanitary condition
Pests
Sep 24, 2024 · Apt 4D
Close - Plumbing
Basin/sink
Sep 24, 2024 · Apt 4D
Close - Unsanitary condition
Mold
Sep 24, 2024 · Apt 4D
Close - Plumbing
Basin/sink
Sep 24, 2024 · Apt 4D
Close - Heat/hot water
Apartment only
Nov 21, 2023 · Apt 3A
Close - Paint/plaster
Wall
Nov 21, 2023 · Apt 3A
Close - Door/window
Window frame
Nov 21, 2023 · Apt 3A
Close - Unsanitary condition
Mold
Nov 21, 2023 · Apt 3A
Close - Heat/hot water
Entire building
Nov 20, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 10, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 8, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 27, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 27, 2022 · Apt 3A
Close - Heat/hot water
Entire building
Nov 25, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 23, 2022 · Apt 3A
Close - Heat/hot water
Apartment only
Nov 14, 2022 · Apt 4D
Close - Appliance
Refrigerator
Jun 9, 2022 · Apt 4D
Close - Appliance
Refrigerator
Apr 15, 2022 · Apt 4D
Close - Appliance
Refrigerator
Apr 15, 2022 · Apt 4D
Close - Heat/hot water
Entire building
Jan 11, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 11, 2022 · Apt 4B
Close - Heat/hot water
Entire building
Jan 4, 2022 · Apt BLDG
Close - Unsanitary condition
Sewage
Sep 14, 2021 · Apt 4D
Close - Plumbing
Toilet
Sep 14, 2021 · Apt 4D
Close - Heat/hot water
Apartment only
Nov 23, 2020 · Apt 4D
Close - Appliance
Electric/gas range
Nov 23, 2020 · Apt 4D
Close - Plumbing
Toilet
Nov 23, 2020 · Apt 4D
Close - Plumbing
Toilet
Nov 23, 2020 · Apt 4D
Close - Heat/hot water
Apartment only
Nov 2, 2020 · Apt 1D
Close - Heat/hot water
Entire building
Oct 30, 2020 · Apt 3A
Close - Door/window
Door frame
Oct 10, 2020 · Apt 4D
Close - Plumbing
Bathtub/shower
Oct 10, 2020 · Apt 4D
Close - Plumbing
Basin/sink
Oct 10, 2020 · Apt 4D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1910
- Floors
- 4
- Residential units
- 13
- Building area
- 14,611 ft²
- Lot area
- 5,551 ft²
- Zoning
- R9A
- Community board
- 111
- Council district
- 8
- Block / lot
- 1667 / 28
- Assessed value
- $299,250
- Landmark / historic district
- No
HPD registration #141587, last renewed Aug 18, 2025.
Questions about 2295 2 Avenue
Who owns 2295 2 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Youth Action Limitedpartnership.
Does 2295 2 Avenue have violations?
Yes. NYC HPD has recorded 142 housing violations at this property.
Is 2295 2 Avenue rent stabilized?
NYC Department of Finance tax bills listed 14 rent-stabilized units here in 2024 (about 100% of its 13 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2295 2 Avenue built?
City records list 1910 as the year it was built.
How many apartments are in 2295 2 Avenue?
It has 13 residential units and 15 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.