1399 Park Avenue
Manhattan, NY 10029BBL 1-01631-7502Map
Owner of record: Unavailable Owner
1399 Park Avenue is a condominium built in 2016 in Manhattan, 10029. It has 72 residential units across 23 floors. The owner of record is Unavailable Owner. HPD has recorded 30 housing violations here, most recently on July 15, 2025. 13 of the 30 most recent violations are still open.
- HPD violations
- 30
- DOB violations
- 7
- ECB violations
- 26
- HPD complaints
- 65
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 30
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at compactor room door at public hall, 1st story
Jul 15, 2025
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 20a, 20th story, 1st apartment from east at south
Jul 15, 2025 · Apt 20A
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at cellar
Jul 15, 2025
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jul 15, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at chute hopper door at public hall, 20th story
Jul 15, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at compactor closet door at public hall, 20th story
Jul 15, 2025
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 18, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at compactor closet door , 20th story
Feb 18, 2024
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 10b, 10th story, 2nd apartment from east at south
Jan 31, 2024 · Apt 10B
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 20a, 20th story, 1st apartment from south at west
Mar 10, 2023 · Apt 20A
Open — Invalid certification
Show 20 more ↓
- CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Mar 10, 2023
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Sep 15, 2022
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and all walls at e2 closet in the private hallway located at apt 6c, 6th story, 1st apartment from south at west
Sep 7, 2022 · Apt 6C
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... approx 10 sq.ft at north wall, approx 8 sq.ft at west wall of closet at south wall in the 2nd room from east at north located at apt 6c, 6th story, 1st apartment from south at west
Sep 7, 2022 · Apt 6C
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and all walls at south wall closet in the 2nd room from east at north located at apt 6c, 6th story, 1st apartment from south at west
Sep 7, 2022 · Apt 6C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the 2nd bathroom from east located at apt 6c, 6th story, 1st apartment from south at west
Sep 7, 2022 · Apt 6C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 2nd room from east at south located at apt 6c, 6th story, 1st apartment from south at west
Sep 7, 2022 · Apt 6C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and all walls at e1 closet in the private hallway located at apt 6c, 6th story, 1st apartment from south at west
Sep 7, 2022 · Apt 6C
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... approx 5 sq.ft at west wall, approx 5 sq.ft at north wall of e2 closet in the private hallway located at apt 6c, 6th story, 1st apartment from south at west
Sep 7, 2022 · Apt 6C
Open — First no access to re- inspect violation - BHazardous
Trace and repair the source and abate the visible mold condition... approx 5 sq.ft at west wall, approx 5 sq.ft at north wall, approx 5 sq.ft at east wall of e1 closet in the private hallway located at apt 6c, 6th story, 1st apartment from south at west
Sep 7, 2022 · Apt 6C
Open — First no access to re- inspect violation - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding 130 degrees in the entire apartment located at apt 20a, 19th story, 1st apartment from east at south
Aug 10, 2022 · Apt 20A
Closed — Violation closed - BHazardous
Properly repair the broken or defective light fixture at ceiling in the 1st room from north at west located at apt 9e, 9th story, 2nd apartment from west at north
May 26, 2022 · Apt 9E
Open — Invalid certification - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 10, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 10, 2022
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
May 20, 2021
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
May 20, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
May 20, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
May 20, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
May 20, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 20, 2021
Closed — Violation dismissed
DOB building violations · 7
- Construction other optional
Partial vacate order due to unsafe conditions.community garden already vacated for the same condition. pvo of 2fl,3fl & 4fl: office b,c & d
May 14, 2025
Dob violation - dismissed - Construction other optional
Emergency work order due to unsafe notification filed by qewi & loose materials. remedy: owner to immediately provide adequate safety measures at exp#3 south elevation under pe/ra full time supervision (re/ra to be on site full time and provide daily report to [email protected]
Apr 1, 2025
Dob violation - active - Hazardous condition (facade) facade required
Cycle 9c unsafe report filed
Mar 20, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2021
Aug 21, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - dismissed
ECB violations · 26
- Class - 2
Failure to file acceptable amended cycle 9c report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control#917369.rem:file acceptable report.
Apr 20, 2026 · Penalty $625
Active - Class - 1
Failure to take and provide and adequate safety measures such as sidewalk shed, fence, netting, etc. to secure public safety-for documented unsafe facade filing by qewi-unsafe-1017369-10c-001 dated 03/20/2025.
Apr 1, 2025 · Penalty $10,000
Active - Class - 2
At south side of building,at 5th,6th and 7th floors hairline cracks appear running diagonally between windows., maintain exterior building wall
Jul 14, 2023 · Penalty $500
Active - Class - 2
Job site fence not constructed or maintained 23 story new building topped and enclosed i observed construction damaged in various location,was not constructed of solid material in various locations,especially a
Jan 11, 2019
Resolve - Class - 1
Failure to provide protection for sidewalk and walkways. 23 story new building topped and enclosed,i observed workers carrying large debris from site exit to dumpster,traveling via the ssp recommended walkway f
Jan 11, 2019 · Penalty $10,000
Resolve - Class - 2
Failure to safeguard all persons and property. 23 story new building topped and enclosed,i observed electrical cord plugged into receptacle/outlet(energized) that was clearly damaged. the plastic of the recepta
Jan 11, 2019 · Penalty $5,000
Resolve - Class - 2
Failure to maintain adequate housekeeping. 23 story new building topped&enclosed,i observed various working floors w/ an exceptional amount of debris. workers were walking in and/or over the debris. debris shal
Jan 11, 2019
Resolve - Class - 2
Sws parapet panel not in compliance w/ section. 23 story new building topped and enclosed,i observed broken parapet panel and did not run along the long axis as per bc 3301.9.2.2. sws parapet info panel should
Jan 11, 2019
Resolve - Class - 2
Failure to comply w/ manufacturer specs. 23 story new building topped and enclosed,i observed yodock barriers at exposure 1 and 2 that were not setup to manufacturers specifications. said barriers must be made
Jan 11, 2019
Resolve - Class - 1
Sec. 3307.7 fence at the time of my inspection on an active jobsite,i observed fence was missing at exp#3. the missing fence poses an immediate danger to the public as it allows access to site from adjacenet
Jul 10, 2018 · Penalty $2,530
Resolve
Show 16 more ↓
- Class - 1
Failure to maintain adequate housekeeping. at the time of my inspection i observed on an active jobsite debris blocking egress throughout the site on multiple floors. pipes,debris,lumber,etc was also piled thro
Jul 10, 2018 · Penalty $2,530
Resolve - Class - 1
Sec. 3307.6.5.8 failrue to provide a perodic inspection report. note: at time of my inspection of an active jobsite,w/construction work in progress. upon request for perodic inspection report for sidewalk shed
Jul 10, 2018 · Penalty $2,530
Resolve - Class - 1
Sidewalk shed where required at time of my inspection on an active jobsite i observed at exp#2 as per site safety plan the sidewalk shed was not installed creating an immediate hazard to the public & workers.
Jul 10, 2018 · Penalty $10,030
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35309489h issued on 05-15-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: file a c of c.
Jul 2, 2018 · Penalty $1,280
Resolve - Class - 1
Cables: note @ time of insp of a follow up following an incident of debris falling from bldg. observed that vertical netting installed & secured by cables observed that the o cables @ survival floors & exposure
May 16, 2018 · Penalty $2,530
Resolve - Class - 1
Failure to maintain adequate housekeeping: note @ time of insp of a 23story @ roof level. observe construction material, cut off & discarded wrapping of materials scattered & piles up @ different floors & locat
May 16, 2018 · Penalty $2,530
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations.noted:at the time of inspection observed styro foam and 2 x10 wooden plank have fallen from the 15th flr set back and fell sidewa
May 15, 2018 · Penalty $10,030
Resolve - Class - 2
Pedestrian protection does not meet code specs.noted:@ time of inspection temporary walk way under the sidewalk shed that installed on park ave is less than 5 ft in width,the gap above the construction fence is
Feb 6, 2018 · Penalty $2,400
Resolve - Class - 2
330.7.7.failure to provide solid construction fence.noted:@ time of inspection chain link fence is installed on e 104 st side.new building is being constructed.rem:provide solid construction fence.
Feb 6, 2018 · Penalty $2,000
Resolve - Class - 1
Failure to maintain/display on site documents as required by chapter 33. note: 23 sty bldg erected to the 7th fl observed spyder crane operations in progress at the 7th fl in form w/operations. spyder crane
May 6, 2017 · Penalty $500
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations. noted: 23 sty bldg erected to the 7th fl. formwork rebar work in progress. at exp#1&2. there is no overhead protection in place
May 6, 2017 · Penalty $5,000
Resolve - Class - 1
No concrete safety manager present during all concrete operations as required. note: observed 23 sty bldg erected to the 7th fl. formwork rebar work,spyder crane operations in progress. regiatered concrete safe
May 6, 2017 · Penalty $6,000
Resolve - Hazardous
Faiure to maintain exterior building wall hazardous noted:(1)verical cracks approx 2"from roof down at rear wall (2) sidewall(park ave side)building approx 3'x 4 creating a hazardous remedy:provide sidewalk she
Sep 21, 2005 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain exterior wall. noted: at rear wall (south) sw corner of building, a crack approx 5'in length has occured in exterior wall. crack may continue to spread if not repaired. remedy: "maintain
Apr 11, 2005 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintian exterior building wall. noted : deteriorating stucco on east side wall and parapet wall south wall is bulding out at center of ferst floor. remedy : maintian exterior wall
Jul 29, 2002 · Penalty $180
Resolve - Non-hazardous
Ng.lure to maintain (hazardous) defect is: wood beams at cellar are rotted, sagging and supported by temporary shoring throughout remedy: make all necessary repairs and symnitran engineers report as to stabilit
Dec 31, 1990 · Penalty $575
Resolve
Complaints
- Heat/hot water
Apartment only
Jul 11, 2025 · Apt 20A
Close - Heat/hot water
Apartment only
Nov 15, 2024 · Apt 20A
Close - Heat/hot water
Apartment only
Oct 24, 2024 · Apt 20A
Close - Heat/hot water
Apartment only
Oct 19, 2024 · Apt 20A
Close - Electric
Lighting
May 1, 2024 · Apt 9E
Close - Heat/hot water
Apartment only
May 1, 2024 · Apt 9E
Close - Heat/hot water
Entire building
Feb 15, 2024 · Apt 8B
Close - Plumbing
Water supply
Feb 12, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 30, 2024 · Apt 8B
Close - Plumbing
Water supply
Jan 23, 2024 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jan 23, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 7, 2024 · Apt 8B
Close - Plumbing
Water supply
Nov 12, 2023 · Apt 20A
Close - Heat/hot water
Apartment only
Jul 26, 2023 · Apt 20A
Close - Plumbing
Water supply
Jun 30, 2023 · Apt 20A
Close - Plumbing
Water supply
Mar 9, 2023 · Apt 20A
Close - Heat/hot water
Entire building
Feb 24, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 10, 2023 · Apt 10C
Close - Heat/hot water
Entire building
Feb 10, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 10, 2023 · Apt BLDG
Close - Plumbing
Water supply
Dec 13, 2022 · Apt 20A
Close - Heat/hot water
Apartment only
Dec 4, 2022 · Apt 20A
Close - Door/window
Door
Oct 25, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Sep 14, 2022 · Apt 12E
Close - Heat/hot water
Entire building
Sep 14, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 14, 2022 · Apt BLDG
Close - Plumbing
Water supply
Sep 14, 2022 · Apt 8D
Close - Plumbing
Water supply
Sep 10, 2022 · Apt 7D
Close - Water leak
Heavy flow
Aug 30, 2022 · Apt 6C
Close - Unsanitary condition
Mold
Aug 30, 2022 · Apt 6C
Close - Unsanitary condition
Mold
Aug 30, 2022 · Apt 6C
Close - Plumbing
Water supply
Aug 25, 2022 · Apt APT20A
Close - General
Signage missing
Aug 25, 2022 · Apt BLDG
Close - Plumbing
Water supply
Jul 28, 2022 · Apt 20A
Close - Safety
Fire escape
Jul 27, 2022 · Apt BLDG
Close - Safety
Fire escape
Jul 17, 2022 · Apt BLDG
Close - Electric
Lighting
May 16, 2022 · Apt 9E
Close - Electric
No lighting
May 12, 2022 · Apt 9E
Close - Heat/hot water
Apartment only
Jan 30, 2022 · Apt 17A
Close - Heat/hot water
Apartment only
Jan 29, 2022 · Apt 20A
Close - Heat/hot water
Apartment only
Jan 29, 2022 · Apt 20A
Close - Heat/hot water
Apartment only
Jan 28, 2022 · Apt 20A
Close - Heat/hot water
Entire building
Jan 27, 2022 · Apt 17A
Close - Heat/hot water
Entire building
Jan 25, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2022 · Apt 20A
Close - Heat/hot water
Entire building
Jan 24, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 20, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 20, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 19, 2022 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 2016
- Floors
- 23
- Residential units
- 72
- Building area
- 109,737 ft²
- Lot area
- 9,127 ft²
- Zoning
- R7-2
- Community board
- 111
- Council district
- 8
- Block / lot
- 1631 / 7502
- Assessed value
- $11,804,408
- Landmark / historic district
- No
HPD registration #144788, last renewed Aug 18, 2025.
Questions about 1399 Park Avenue
Who owns 1399 Park Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.
Does 1399 Park Avenue have violations?
Yes. NYC HPD has recorded 30 housing violations at this property.
Is 1399 Park Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1399 Park Avenue built?
City records list 2016 as the year it was built.
How many apartments are in 1399 Park Avenue?
It has 72 residential units and 74 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.