1575 Lexington Avenue
Manhattan, NY 10029BBL 1-01628-0050Map
Owner of record: 1575 Lexington LLC
1575 Lexington Avenue is a walk-up apartment building built in 1920 in Manhattan, 10029. It has 34 residential units across 6 floors. The owner of record is 1575 Lexington LLC. HPD has recorded 421 housing violations here, most recently on September 1, 2026. 50 of the 50 most recent violations are still open. City tax records listed 28 rent-stabilized apartments here in 2024.
- HPD violations
- 421
- DOB violations
- 11
- ECB violations
- 23
- HPD complaints
- 548
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 421
- BHazardous
Repair the leaky and/or defective faucets at the bathtub in the bathroom located at apt 3, 1st story, 1st apartment from east at south
Sep 1, 2026 · Apt 3
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at the wash basin in the bathroom located at apt 12, 3rd story, 1st apartment from east at south
Sep 1, 2026 · Apt 12
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective concrete flooring at basement
Sep 1, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 24, 5th story, 1st apartment from east at south
Sep 1, 2026 · Apt 24
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hotwater exceeding the maximum temperature of 130 degerees at all hot water fixtures in entire apartment located at apt 26, 5th story, 2nd apartment from south at west
Sep 1, 2026 · Apt 26
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch set at entrance door at boiler room
Sep 1, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door and latch set at boiler room
Sep 1, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective wood subfloor in the kitchen located at apt 24, 5th story, 1st apartment from east at south
Sep 1, 2026 · Apt 24
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of key-operated lock on the door knob of the room leading to the fire escape in the 1st room from east located at apt 24, 5th story, 1st apartment from east at south
Sep 1, 2026 · Apt 24
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch set at door in the entrance located at apt 11, 3rd story, 1st apartment from north at east
Sep 1, 2026 · Apt 11
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges and latch set at entrance to basement
Sep 1, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Sep 1, 2026 · Apt 1
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective fire retardant material at south wall at public hall, 5th story
Sep 1, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall at public hall, 5th story
Sep 1, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at lower sash of fire escape window in the 4th room from north located at apt 31, 6th story, 1st apartment from south at west
Sep 1, 2026 · Apt 31
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the riser in the 1st room from east located at apt 3, 1st story, 1st apartment from east at south
Sep 1, 2026 · Apt 3
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the riser in the 3rd room from east located at apt 28, 6th story, 2nd apartment from west at north
Sep 1, 2026 · Apt 28
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at lower sash of fire escape window in the 1st room from north located at apt 32, 6th story, 2nd apartment from south at west
Sep 1, 2026 · Apt 32
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceilings throughout in the entire apartment located at apt 26, 5th story, 2nd apartment from south at west
Sep 1, 2026 · Apt 26
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door in the entrance located at apt 26, 5th story, 2nd apartment from south at west
Sep 1, 2026 · Apt 26
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective outlet at west wall in the kitchenette located at apt 26, 5th story, 2nd apartment from south at west
Sep 1, 2026 · Apt 26
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq feet observed at ceiling and west wall in the bathroom located at apt 26, 5th story, 2nd apartment from south at west
Sep 1, 2026 · Apt 26
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 26, 5th story, 2nd apartment from south at west
Sep 1, 2026 · Apt 26
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 26, 5th story, 2nd apartment from south at west
Sep 1, 2026 · Apt 26
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 11, 3rd story, 1st apartment from north at east
Sep 1, 2026 · Apt 11
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 11, 3rd story, 1st apartment from north at east
Sep 1, 2026 · Apt 11
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 11, 3rd story, 1st apartment from north at east
Sep 1, 2026 · Apt 11
Open — Nov sent out - BHazardous
Properly secure the loose light fixture at the ceiling in the 5th room from north located at apt 11, 3rd story, 1st apartment from north at east
Sep 1, 2026 · Apt 11
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 2nd room from north located at apt 11, 3rd story, 1st apartment from north at east
Sep 1, 2026 · Apt 11
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood subfloor (sloping) in the private hallway located at apt 11, 3rd story, 1st apartment from north at east
Sep 1, 2026 · Apt 11
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling throughout in the entire apartment located at apt 24, 5th story, 1st apartment from east at south
Sep 1, 2026 · Apt 24
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 24, 5th story, 1st apartment from east at south
Sep 1, 2026 · Apt 24
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east located at apt 24, 5th story, 1st apartment from east at south
Sep 1, 2026 · Apt 24
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the closet in the 3rd room from east located at apt 24, 5th story, 1st apartment from east at south
Sep 1, 2026 · Apt 24
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective caulking around the bathtub in the bathroom located at apt 24, 5th story, 1st apartment from east at south
Sep 1, 2026 · Apt 24
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the foyer located at apt 24, 5th story, 1st apartment from east at south
Sep 1, 2026 · Apt 24
Open — Nov sent out - BHazardous
Repair the broken or defective connection wasteline at the sink in the kitchen located at apt 25, 5th story, 1st apartment from south at west
Sep 1, 2026 · Apt 25
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective outlet at the west wall in the kitchen located at apt 25, 5th story, 1st apartment from south at west
Sep 1, 2026 · Apt 25
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 25, 5th story, 1st apartment from south at west
Sep 1, 2026 · Apt 25
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from east located at apt 28, 6th story, 2nd apartment from west at north
Sep 1, 2026 · Apt 28
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 20, 4th story, 2nd apartment from south at west
Sep 1, 2026 · Apt 20
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch set at door in the entrance located at apt 3, 1st story, 1st apartment from east at south
Sep 1, 2026 · Apt 3
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges, door and latch set in the entrance located at apt 3, 1st story, 1st apartment from east at south
Sep 1, 2026 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 5th room from north located at apt 20, 4th story, 2nd apartment from south at west
Sep 1, 2026 · Apt 20
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of key-operated lock on door knob of room leading to fire escape in the 5th room from east located at apt 12a, 3rd story, 1st apartment from south at west
Sep 1, 2026 · Apt 12A
Open — Nov sent out - BHazardous
Properly secure the loose marble saddle at entrance in the 3rd room from east located at apt 12a, 3rd story, 1st apartment from south at west
Sep 1, 2026 · Apt 12A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective grout at floor tiles in the kitchen located at apt 12a, 3rd story, 1st apartment from south at west
Sep 1, 2026 · Apt 12A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 12a, 3rd story, 1st apartment from south at west
Sep 1, 2026 · Apt 12A
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing door sweep at interior in the entrance located at apt 12a, 3rd story, 1st apartment from south at west
Sep 1, 2026 · Apt 12A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceilings throughout in the entire apartment located at apt 12a, 3rd story, 1st apartment from south at west
Sep 1, 2026 · Apt 12A
Open — Nov sent out
DOB building violations · 11
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - active - Plumbing none
The department of buildings intends to revoke all plumbing work under permit number 123466533 due to master plumber license revocation lmp number 2084 stop all plumbing work under above mentioned permit and obtain a new master plumber to supersede the plumbing permit
Apr 7, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2019
Dob violation - active - Plumbing none
The dob intends to revoke all approvals and permits under plumbing job #123142704 due to suspension of master plumbers license. stop all plumbing work under above mentioned permit and obtain a new master plumber to supersede the plumbing permit
Oct 28, 2018
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 17, 2013
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 28, 2013
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed
Show 1 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 23
- Class - 2
Work without permit. noted: illuminated sign reads:"cherry gourmet deli", sign is approx: 30'x 4' & has a green background with white and yellow lettering. sign was installed without a permit., obtain all permi
Dec 3, 2025
Resolve - Class - 2
At time of inspection in response to complaint i observed underside of sidewalk shed a not illuminated expo #2 as per 3307.6.4.8. this creates a hazardous condition for public walking underneath while dark and
May 29, 2024 · Penalty $2,400
Active - Class - 2
B263 failure to comply with commissioners order for violation#39079299l dated 02/08/2023 comply and submit cert.of correction
Oct 19, 2023 · Penalty $3,125
Resolve - Class - 2
Found corroded and leaking water column, fittings at mixing valve also leaking water, body drains missing on safety relief valves, gas pilot line to be hard piped, cap missing on gas regulator (pilot), exposed
Feb 8, 2023 · Penalty $625
Active - Class - 2
As per dob records permit #140055687 has not been signed off therefore burner is unregistered. register burner and submit a certificate of correction.
Dec 6, 2022 · Penalty $625
Active - Class - 2
Failure to submit an acceptable required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#814369. remedy:submit acceptable requir
Oct 19, 2022 · Penalty $1,250
Active - Class - 1
Failure to maintain bldg wall(s) or appurtenances noted:atoi there were 3ac units installed above pedestrian sidewalk&above entrance to store.@6,5,4fls w/o brackets or proper support.hazard condition.install ac
Jun 9, 2021 · Penalty $2,500
Resolve - Class - 2
Failure to comply w/commissioner's order&file c/c w/dob.noted:respondent failed to file c/c w/dob for v35348216y issued10.3.18 pursuant tobldg code28-204.2.file c/c.
Jun 9, 2021 · Penalty $6,250
Active - Class - 2
Failure to submit an acceptable required cycle 8b report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control#814369. agg1: prior nov#37013525x under
Jun 1, 2021 · Penalty $3,125
Active - Class - 2
Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control# 814369. remedy: submit required technical report.
Oct 15, 2018 · Penalty $6,250
Active
Show 13 more ↓
- Class - 1
Work without a permit.noted:exterior business illuminated sign erected appoxmately 5'x4' at front on the 2nd floor with metal frame and metal braket attached to the building.obtain permit
Oct 3, 2018 · Penalty $8,000
Active - Class - 3
Failure to maintain building in code-compliant manner. noted: in the courtyard observed the rain drain pipe is broken and causes water leakage on rainy days. the defect is located between 1st and 2nd fl. rem: r
Aug 8, 2018
Resolve - Class - 2
Failure to maintain facade and appurtenances. noted: at west/front/#1 and north #2 exposures a/c units were observed being unlawfully supported by wood blocks at outside sill. rmdy: comply with 1rcy 103-04 & su
Sep 24, 2014 · Penalty $2,500
Active - Class - 2
B254,50a,50b,50c,50d,50e,50f,50g. 50a-sail switch not working on fresh air fan; 50b-glass missing in rear of boielr to sight fire; 50c-bolts missing on boiler doors front and rear; 50d-need support for smoke
Sep 3, 2013 · Penalty $2,500
Resolve - Class - 2
Failure to install ground fault circuit interrupter (gfci) protection as required. the entire apt 28 & 30: branch circuit wiring, living rm,bedroom, a/c outlet. remedy: install gfci protection.
Apr 26, 2013 · Penalty $800
Active - Class - 2
Kitchen outlets is more than 20"in height above countertop. the entireapts kitchen outlets, 7,11,21,10,28,30. remedy: comply with ec code.
Apr 26, 2013 · Penalty $400
Active - Class - 1
Electrical work w/o a permit. the entire of this apts 7,11,21,10,28,30:some branch circuit wiring,receptacle outlets,switches,lighting fixtures. rmdy: obtain permit.
Apr 26, 2013 · Penalty $1,600
Active - Class - 1
B154,11c,21a,32a,50,5a,51. 50- sump pump not working/repair/replace. 50a- oil pump set has no guards/install guards. do not operate boiler until all hazardous conditions are immediately corrected and dob is
Jan 7, 2013 · Penalty $1,000
Resolve - Class - 3
Failure to maintain building in a code-compliant manner. noted: at the 6th fl south west corner apt (apt 31) the ceiling is damage & has fallen down in the living room because of water damage. size of damaged
Jun 26, 2009 · Penalty $500
Resolve - Class - 2
Failure to maintain building walls and/or appurtenances. at the west exposure cornice at the roof/parapet level. the sheet metal cornice is deteriorated leaving holes along it's entire length. birds are enterin
Jun 26, 2009 · Penalty $2,500
Resolve - Non-hazardous
B4a,28a,3a,50a,b,c,d,e,f,g,h,i,j,k,l. 50a oil leak at pump 50b 530c valve rotted 50c excessive soot condition 50d rear inspection door scorded 50e fresh air fan jumped out 50f remove debris in boiler pit 50g
Dec 11, 2007 · Penalty $180
Active - Non-hazardous
B4a,16,21a,50,32a,50a,50b,50c,50d,50e,50f.50-oil pumps leaking.50a-sight glass missing on chamber door.50b-sail switch jumped out.50c-backflow not piped down.50d-water pipes not supported in boiler room.50e-
Mar 16, 2007 · Penalty $350
Active - Non-hazardous
Work without a permit. noted: ground floor southeast corner commercial store erected full height partition wall with entrance door. at rear upper level two 2-piece bathroom with full plumbing service. new
Jun 12, 2003 · Penalty $2,500
Resolve
Complaints
- Heat/hot water
Entire building
Jan 18, 2026 · Apt BLDG
Close - Water leak
Slow leak
Jan 7, 2026 · Apt 15
Close - Unsanitary condition
Mold
Jan 7, 2026 · Apt 15
Close - Heat/hot water
Entire building
Jan 5, 2026 · Apt 28
Close - Water leak
Slow leak
Nov 15, 2025 · Apt 4
Close - Electric
Power outage
Oct 10, 2025 · Apt 28
Close - Flooring/stairs
Floor
Oct 2, 2025 · Apt 11
Close - Paint/plaster
Ceiling
Oct 2, 2025 · Apt 11
Close - Electric
Lighting
Oct 2, 2025 · Apt 11
Close - Flooring/stairs
Floor
Oct 2, 2025 · Apt 11
Close
Show 40 more ↓
- Heat/hot water
Entire building
Sep 25, 2025 · Apt 28
Close - Heat/hot water
Apartment only
Sep 25, 2025 · Apt 25
Close - Plumbing
Water supply
Sep 25, 2025 · Apt 28
Close - Heat/hot water
Entire building
Sep 25, 2025 · Apt 28
Close - Heat/hot water
Apartment only
Sep 25, 2025 · Apt 15
Close - Plumbing
Water supply
Sep 8, 2025 · Apt 28
Close - Heat/hot water
Entire building
Sep 7, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Sep 7, 2025 · Apt 15
Close - Heat/hot water
Entire building
Aug 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 23, 2025 · Apt BLDG
Close - General
Cooking gas
Aug 23, 2025 · Apt 28
Close - Heat/hot water
Entire building
Aug 23, 2025 · Apt 28
Close - General
Cooking gas
Aug 13, 2025 · Apt 21
Close - Heat/hot water
Entire building
Aug 13, 2025 · Apt BLDG
Close - Unsanitary condition
Mold
Aug 13, 2025 · Apt 28
Close - Door/window
Door
Aug 13, 2025 · Apt 28
Close - Unsanitary condition
Pests
Aug 13, 2025 · Apt 28
Close - Heat/hot water
Entire building
Aug 13, 2025 · Apt 21
Close - General
Cooking gas
Aug 13, 2025 · Apt BLDG
Close - Appliance
Electric/gas range
Aug 7, 2025 · Apt 28
Close - Heat/hot water
Entire building
Aug 7, 2025 · Apt 28
Close - General
Cooking gas
Aug 7, 2025 · Apt 4
Close - Heat/hot water
Entire building
Aug 7, 2025 · Apt 4
Close - General
Cooking gas
Aug 5, 2025 · Apt 5
Close - Appliance
Electric/gas range
Jul 29, 2025 · Apt 19
Close - Heat/hot water
Entire building
Jul 26, 2025 · Apt 28
Close - General
Cooking gas
Jul 26, 2025 · Apt 28
Close - General
Cooking gas
Jul 25, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 24, 2025 · Apt 28
Close - Door/window
Door
Jul 24, 2025 · Apt 28
Close - Paint/plaster
Wall
Jul 24, 2025 · Apt 28
Close - Unsanitary condition
Pests
Jul 24, 2025 · Apt 28
Close - Unsanitary condition
Mold
Jul 24, 2025 · Apt 28
Close - General
Cooking gas
Jul 24, 2025 · Apt 28
Close - Heat/hot water
Entire building
May 17, 2025 · Apt 28
Close - Unsanitary condition
Pests
May 17, 2025 · Apt 28
Close - Door/window
Door
May 17, 2025 · Apt 28
Close - Heat/hot water
Entire building
May 4, 2025 · Apt 28
Close - Heat/hot water
Apartment only
Feb 21, 2025 · Apt 28
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1920
- Floors
- 6
- Residential units
- 34
- Building area
- 24,170 ft²
- Lot area
- 4,837 ft²
- Zoning
- R7-2
- Community board
- 111
- Council district
- 8
- Block / lot
- 1628 / 50
- Assessed value
- $1,453,950
- Landmark / historic district
- No
HPD registration #115242, last renewed Sep 9, 2025.
Questions about 1575 Lexington Avenue
Who owns 1575 Lexington Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 1575 Lexington LLC.
Does 1575 Lexington Avenue have violations?
Yes. NYC HPD has recorded 421 housing violations at this property.
Is 1575 Lexington Avenue rent stabilized?
NYC Department of Finance tax bills listed 28 rent-stabilized units here in 2024 (about 82% of its 34 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1575 Lexington Avenue built?
City records list 1920 as the year it was built.
How many apartments are in 1575 Lexington Avenue?
It has 34 residential units and 40 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.