179 East 100 Street
Manhattan, NY 10029BBL 1-01628-0024Map
Owner of record: NYC Department Of Homeless Services
179 East 100 Street is a walk-up apartment building built in 1910 in Manhattan, 10029. It has 35 residential units across 6 floors. The owner of record is NYC Department Of Homeless Services. HPD has recorded 15 housing violations here, most recently on September 10, 2015.
- HPD violations
- 15
- DOB violations
- 7
- ECB violations
- 22
- HPD complaints
- 28
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 15
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1a, 1st story, 2nd apartment from north at east
Sep 10, 2015 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at cellar
Sep 10, 2015
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Sep 9, 2015
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 9, 2015
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2b, 2nd story, 1st apartment from north at east
Sep 2, 2015 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4d, 4th story, 1st apartment from east at south
Aug 30, 2015 · Apt 4D
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1b, 1st story, 1st apartment from north at east
Jan 16, 2015 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the bathroom located at apt 1b, 1st story, 1st apartment from north at east
Jan 16, 2015 · Apt 1B
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice located at apt 1b, 1st story, 1st apartment from north at east
Jan 16, 2015 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective rotten wood floor near west wall in the foyer located at apt 1b, 1st story, 1st apartment from north at east
Jan 16, 2015 · Apt 1B
Closed — Violation closed
Show 5 more ↓
- CImmediately hazardous
Provide adequate supply of hot water for the fixtures ... in the entire apartment located at apt 2d, 2nd story, 1st apartment from east at south
Sep 26, 2013 · Apt 2D
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt na, 5th story, 1st apartment from east at south , section at west
Sep 19, 2013 · Apt NA
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room at basement
Sep 19, 2013
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2d, 2nd story, 1st apartment from west at north
Dec 6, 2002 · Apt 2D
Closed — Violation closed - BHazardous
Provide adequate supply of hot water for the fixtures , in the entire apartment located at apt 2d, 2nd story, 1st apartment from north at east
Jul 3, 2002 · Apt 2D
Closed — Violation closed
DOB building violations · 7
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 22
- Class - 2
Failure to maintain building in code-compliant manner. observed obstructing baby carriage in public corridor. located on the first floor. potential fire hazard., repair and/or replace
Oct 1, 2026 · Penalty $1,250
Active - Class - 2
Failure to maintain building in code-compliant manner. cracked cobble stone on roof level., repair and/or replace
Nov 14, 2024 · Penalty $625
Active - Class - 2
Exit door not self-closing. observed non self closing doors throughout building. potential fire and smoke hazard., repair/replace door
Nov 14, 2024 · Penalty $625
Active - Class - 2
I observed in the first floor maintenance room no gfci protection within 6 feet of a sink., install gfc1 protection; provide gfci protection.
Nov 14, 2024 · Penalty $2,400
Active - Class - 1
Failure to maintain building in code-compliant manner: no fire stopping per bc 712.3 (2014 code); 27-345; bc 711.2.4 (2022 code. observed hole penetrations throughout building. this is a potential fire or smoke
Nov 14, 2024 · Penalty $2,500
Active - Class - 2
Active leak on sprinkler branch line in the compactor room located in the basement/cellar., repair and/or replace
Nov 13, 2024 · Penalty $625
Active - Class - 2
Large cracks in the retaining wall located on exposure #2 property line wall cellar/side corridor., repair and/or replace; repair and or replace
Jul 27, 2023 · Penalty $625
Active - Class - 2
Observed: at roof level exit door, cellar level front exit door and upk doors do not close properly when inspected., repair/replace door
Jan 3, 2023 · Penalty $625
Active - Class - 2
Failure to maintain building in code compliant manner lack of emergency lighting for exits exit discharges and public corridors per bc 1006 1.27-542.observed 5 story building with front and back exits without e
Nov 5, 2021 · Penalty $1,250
Active - Class - 2
Noted: observed at exposure #1 south elevation, bulging cement and an approximately 1" horizontal crack throughout the length of the retaining wall., maintain exterior building wall
Sep 11, 2019
Resolve
Show 12 more ↓
- Class - 2
Failure to maintain building wall(s) or appurtenances. noted: observedat exp1 south elevation. an apprx 1"horizontal crack across the lengthof entire retaining wall. rmdy: maintain exterior building wall.
Mar 22, 2019
Active - Class - 2
Failure to maintain building wall(s) or appurtenances. noted: at roof,(rear) opening at parapet wall leading to fire escape, coping stones are cracked and loose. remedy: maintain exterior building noted
Sep 28, 2018
Active - Class - 2
Failure to maintain bldg wall(s) or appurtenances. noted: observed at exposure #1, front of building. retaining wall have horizontal cracks apprx 1" in width across the entire length of the wall. rmdy: maintain
Apr 6, 2018
Active - Class - 1
Misc violation. residential gas flex used on commercial equipment. ob served in laundry room residental gas flex hoses being used to supply gas to two commercial clothes dryers (gas fired). rmdy: comply with co
Apr 6, 2018
Active - Class - 1
Fgc 411.1 residential gas flex on commercial equip,ent observed on 08/22/2017 @the above address residential gas flex used on commercial equipment.*photo taken* rem:comply w/the summons.
Aug 22, 2017
Active - Class - 2
Failure to maintain bldg in code-compliant manner observed on 08/22/2017 @above address (drain) (&) down raiser pipe in laundry room located on the 1st fl broken & rotted away.*photo taken* rem:repair &/or repl
Aug 22, 2017
Active - Class - 2
Failure to maintain building wall(s) or appurtenances. noted: observed at front of structure, retaining wall has horizontal cracks (approx. 20ft) spanning the length of the wall, also at roof observed loose and
Aug 22, 2017
Active - Class - 2
Failure to maintain bldg in code compliant manner. observed on 3-27-17in basement/cellar sprinkler pipe appears to be leaking in compactor room. remedy: repair &/or replace.
Mar 27, 2017
Active - Class - 2
Failure to maintain bldg in code compliant manner. observed on 3-27-17in basement of above address no sprinkler in the compactor. remedy: repair &/or replace.
Mar 27, 2017
Active - Class - 2
Failure to maintain in code-compliant manner.defect noted:retaining wall at front of premises has approx 2"wide horizontal crack along thelength of the wall. rmdy: comply w.notice of violation.
Sep 16, 2016
Active - Class - 1
Misc viol. observed on 9/16/16 at 9:15am gas coin operated dryer had installed resid gas flex connector on comm dryer. photos taken. rmdy: comply with nov.
Sep 16, 2016
Active - Hazardous
Failure to safely&properly remove materials/debris from construction site. noted:construction debris from 179 east 100th street has been dumped/stored in the rear yard&also changed elevation-both near/around fi
Apr 10, 1991
Resolve
Complaints
- Plumbing
Water supply
Sep 9, 2015 · Apt 1A
Close - Heat/hot water
Apartment only
Sep 6, 2015 · Apt 1A
Close - Heat/hot water
Entire building
Sep 4, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 4, 2015 · Apt 3C
Close - Heat/hot water
Entire building
Aug 31, 2015 · Apt 5D
Close - Heat/hot water
Apartment only
Aug 29, 2015 · Apt 1A
Close - Plumbing
Boiler
Aug 27, 2015 · Apt 4D
Close - Flooring/stairs
Floor
Jul 2, 2015 · Apt 1C
Close - Unsanitary condition
Pests
Jul 2, 2015 · Apt 1C
Close - Heat/hot water
Apartment only
Jan 5, 2015 · Apt 1B
Close
Show 18 more ↓
- Unsanitary condition
Pests
Jan 5, 2015 · Apt 1B
Close - Unsanitary condition
Pests
Jan 5, 2015 · Apt 1B
Close - Water leak
Heavy flow
Jan 5, 2015 · Apt 1B
Close - Heating
Heat related
Sep 24, 2013 · Apt 2A
Close - Heating
Heat related
Sep 19, 2013 · Apt NA
Close - Heating
Heat related
Sep 13, 2013 · Apt NA
Close - Heating
Heat related
Feb 26, 2013 · Apt 5A
Close - Heating
Heat related
Feb 20, 2013 · Apt 5A
Close - Heating
Heat related
Jan 27, 2013 · Apt 3D
Close - Heating
Heat related
Jan 4, 2013 · Apt 3C
Close - Heating
Heat related
Feb 4, 2012 · Apt 5B
Close - Heating
Heat related
Dec 18, 2008 · Apt 2C
Close - Heating
Heat related
Nov 22, 2008 · Apt 183
Close - Paint/plaster
Wall
Feb 6, 2006 · Apt 4
Close - General
Doors
Feb 6, 2006 · Apt 4
Close - Paint/plaster
Wall
Feb 6, 2006 · Apt 4
Close - Heating
Heat related
Jan 20, 2005 · Apt 3C
Close - Heating
Heat related
Dec 20, 2004 · Apt 3C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1910
- Floors
- 6
- Residential units
- 35
- Building area
- 21,870 ft²
- Lot area
- 5,046 ft²
- Zoning
- R7A
- Community board
- 111
- Council district
- 8
- Block / lot
- 1628 / 24
- Assessed value
- $1,380,600
- Landmark / historic district
- No
Questions about 179 East 100 Street
Who owns 179 East 100 Street?
The owner of record in NYC Department of City Planning PLUTO data is NYC Department Of Homeless Services.
Does 179 East 100 Street have violations?
Yes. NYC HPD has recorded 15 housing violations at this property.
Is 179 East 100 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 179 East 100 Street built?
City records list 1910 as the year it was built.
How many apartments are in 179 East 100 Street?
It has 35 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.