roofy

350 East 89 Street

Manhattan, NY 10128BBL 1-01551-0033Map

Owner of record: East 89 St 350 LLC

350 East 89 Street is a walk-up apartment building built in 1915 in Manhattan, 10128. It has 12 residential units across 5 floors. The owner of record is East 89 St 350 LLC. HPD has recorded 62 housing violations here, most recently on November 6, 2024. 47 of the 50 most recent violations are still open. City tax records listed 4 rent-stabilized apartments here in 2024.

HPD violations
62
DOB violations
3
ECB violations
0
HPD complaints
99

What to know

Concern
7 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Nov 6, 2024

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
4
About 33% of the building's 12 apartments
Down from 5 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 62

  • C

    Remove device preventing door from being self-closing hook and eye installed at vestibule door at public hall, 1st story

    Nov 6, 2024

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Nov 6, 2024

    Open — Nov sent out
  • B

    Provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing sign at public hall, 1st story

    Nov 6, 2024

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Nov 6, 2024

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Nov 6, 2024

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame at public hall, 1st story

    Nov 6, 2024

    Open — Nov sent out
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Nov 6, 2024

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Nov 6, 2024

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing sign at public hall, 1st story

    Nov 6, 2024

    Open — Nov sent out
  • B

    Abate the infestation consisting of bedbugs in the entire apartment located at apt apt2b, 2nd story, 1st apartment from east at south

    Dec 20, 2021 · Apt APT2B

    Open — Nov sent out
Show 40 more ↓
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north at east located at apt apt2b, 2nd story, 1st apartment from east at south

    Dec 20, 2021 · Apt APT2B

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north at east located at apt apt2b, 2nd story, 1st apartment from east at south

    Dec 20, 2021 · Apt APT2B

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Dec 20, 2021

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Dec 20, 2021

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Dec 20, 2021

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Dec 20, 2021

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Dec 20, 2021

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 1st story

    Dec 20, 2021

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 25, 2016

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from north located at apt 3b, 3rd story, 1st apartment from east at south

    Apr 26, 2016 · Apt 3B

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of nails protruding through the floor in the 3rd room from north located at apt 3b, 3rd story, 1st apartment from east at south

    Apr 26, 2016 · Apt 3B

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the bathroom located at apt 3b, 3rd story, 1st apartment from east at south

    Apr 26, 2016 · Apt 3B

    Open — Nov sent out
  • A

    Properly secure the loose locking device at door in the entrance located at apt 3b, 3rd story

    Apr 26, 2016 · Apt 3B

    Open — Nov sent out
  • A

    Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story

    Apr 26, 2016

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Apr 26, 2016

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at public hall, 1st story

    Apr 26, 2016

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 1st story

    Apr 26, 2016

    Open — Nov sent out
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Apr 26, 2016

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Apr 26, 2016

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Apr 26, 2016

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north at west located at apt 3b, 3rd story, 1st apartment from east at south

    Nov 12, 2015 · Apt 3B

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroom located at apt 3b, 3rd story, 1st apartment from east at south

    Nov 12, 2015 · Apt 3B

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 3rd room from north at west located at apt 3b, 3rd story, 1st apartment from east at south

    Nov 12, 2015 · Apt 3B

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of scalding hot water exceeding the maximum of 130 degrees (found hot water to be 156 degrees) in the entire apartment located at apt 3b, 3rd story, 1st apartment from east at south

    Nov 12, 2015 · Apt 3B

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector inoperative in the entire apartment located at apt 3b, 3rd story, 1st apartment from east at south

    Nov 12, 2015 · Apt 3B

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). - inoperative in the entire apartment located at apt 3b, 3rd story, 1st apartment from east at south

    Nov 12, 2015 · Apt 3B

    Open — Nov sent out
  • A

    Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at lobby, 1st story

    Jul 19, 2014

    Open — Nov sent out
  • C

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1b, 1st story, 1st apartment from south at west

    Feb 6, 2012 · Apt 1B

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1b, 1st story, 1st apartment from south at west

    Feb 6, 2012 · Apt 1B

    Open — Nov sent out
  • C

    Provide an adequate supply of gas to the fixtures at the stove in the kitchen located at apt 1b, 1st story, 1st apartment from south at west

    Nov 29, 2011 · Apt 1B

    Open — Nov certified late
  • A

    Properly repair the broken or defective the electrical outlet at the south wall in the 3rd room from north located at apt 1b, 1st story, 1st apartment from south at west

    Nov 29, 2011 · Apt 1B

    Open — Nov sent out
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Nov 29, 2011

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Nov 10, 2011

    Open — Nov sent out
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Nov 10, 2011

    Open — Nov sent out
  • A

    Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story

    Nov 10, 2011

    Open — Nov sent out
  • B

    Properly repair the broken or defective electric outlet at south wall in the 2nd room from north located at apt 1b, 1st story

    Nov 10, 2011 · Apt 1B

    Open — Nov sent out
  • C

    Provide an adequate supply of gas to the fixtures at stove in the kitchen located at apt 1b, 1st story, 2nd apartment from south at west

    Nov 10, 2011 · Apt 1B

    Open — Nov sent out
  • A

    Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor , at public hall, 1st story

    Aug 31, 2011

    Open — Nov sent out
  • A

    Properly repair the broken or defective wood base and doors at the cabinets below the sink in the kitchen located at apt 1b, 1st story, 1st apartment from south at west

    Aug 31, 2011 · Apt 1B

    Open — Nov sent out
  • C

    Provide an adequate supply of gas to the fixtures gas range in the kitchen located at apt 1a, 1st story, 2nd apartment from south at west

    Mar 2, 2011 · Apt 1A

    Open — Nov sent out

DOB building violations · 3

  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Construction other optional

    C-construction other optional

    May 5, 2011

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active

ECB violations · 0

No ECB violations on record

Complaints

  • Heat/hot water

    Apartment only

    Jan 24, 2026 · Apt 1C

    Close
  • Heat/hot water

    Apartment only

    Feb 21, 2025 · Apt 3A

    Close
  • Door/window

    Door

    Oct 23, 2024 · Apt APT1A

    Close
  • Water leak

    Slow leak

    Jul 31, 2023 · Apt 3A

    Close
  • Paint/plaster

    Ceiling

    Mar 22, 2023 · Apt 3B

    Close
  • Plumbing

    Basin/sink

    Mar 22, 2023 · Apt 3B

    Close
  • Electric

    Outlet/switch

    Mar 22, 2023 · Apt 3B

    Close
  • Door/window

    Window frame

    Mar 22, 2023 · Apt 3B

    Close
  • Unsanitary condition

    Pests

    Dec 21, 2022 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    Dec 6, 2021 · Apt APT2B

    Close
Show 40 more ↓
  • Unsanitary condition

    Pests

    Nov 8, 2021 · Apt 2B

    Close
  • Paint/plaster

    Ceiling

    Sep 9, 2021 · Apt 5A

    Close
  • Water leak

    Slow leak

    Sep 9, 2021 · Apt 5A

    Close
  • Heat/hot water

    Apartment only

    Jan 18, 2020 · Apt 3B

    Close
  • Heat/hot water

    Apartment only

    Dec 17, 2019 · Apt 4B

    Close
  • Heat/hot water

    Apartment only

    Dec 17, 2019 · Apt 4B

    Close
  • Water leak

    Slow leak

    Sep 26, 2017 · Apt 3A

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jan 19, 2017 · Apt BLDG

    Close
  • Door/window

    Door

    Apr 18, 2016 · Apt 3B

    Close
  • Flooring/stairs

    Floor

    Apr 18, 2016 · Apt 3B

    Close
  • Paint/plaster

    Ceiling

    Apr 18, 2016 · Apt 3B

    Close
  • Paint/plaster

    Wall

    Apr 18, 2016 · Apt 3B

    Close
  • Heat/hot water

    Entire building

    Nov 30, 2015 · Apt 3B

    Close
  • Paint/plaster

    Wall

    Oct 30, 2015 · Apt 3B

    Close
  • Paint/plaster

    Wall

    Oct 30, 2015 · Apt 3B

    Close
  • Flooring/stairs

    Floor

    Oct 30, 2015 · Apt 3B

    Close
  • Flooring/stairs

    Floor

    Oct 30, 2015 · Apt 3B

    Close
  • Paint/plaster

    Ceiling

    Oct 30, 2015 · Apt 3B

    Close
  • Heat/hot water

    Entire building

    Oct 22, 2014 · Apt 4B

    Close
  • Appliance

    Refrigerator

    Jul 12, 2014 · Apt 5A

    Close
  • Door/window

    Door

    Jul 12, 2014 · Apt 59

    Close
  • Door/window

    Door

    Jul 12, 2014 · Apt 59

    Close
  • Nonconst

    Janitor/super

    Dec 2, 2013 · Apt 3B

    Close
  • Nonconst

    Janitor/super

    Dec 2, 2013 · Apt 3B

    Close
  • Nonconst

    Vermin

    Dec 2, 2013 · Apt 3B

    Close
  • Nonconst

    Rubbish

    Dec 2, 2013 · Apt 3B

    Close
  • Nonconst

    Rubbish

    Dec 2, 2013 · Apt 3B

    Close
  • Electric

    Wiring

    Dec 2, 2013 · Apt 3B

    Close
  • General

    Locks

    Dec 2, 2013 · Apt 3B

    Close
  • Nonconst

    Janitor/super

    Dec 2, 2013 · Apt 3B

    Close
  • General

    Windows

    Dec 2, 2013 · Apt 3B

    Close
  • Plumbing

    Basin/sink

    Dec 2, 2013 · Apt 3B

    Close
  • Electric

    Wiring

    Dec 2, 2013 · Apt 3B

    Close
  • Electric

    Wiring

    Dec 29, 2012 · Apt 1C

    Close
  • Electric

    Electric-supply

    Dec 29, 2012 · Apt 1C

    Close
  • Nonconst

    Janitor/super

    Nov 21, 2011 · Apt 1B

    Close
  • Electric

    Wiring

    Nov 21, 2011 · Apt 1B

    Close
  • General

    Cooking gas

    Nov 21, 2011 · Apt 1B

    Close
  • Appliance

    Electric/gas range

    Oct 28, 2011 · Apt 1B

    Close
  • Electric

    Wiring

    Oct 28, 2011 · Apt 1B

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1915
Floors
5
Residential units
12
Building area
8,435 ft²
Lot area
2,585 ft²
Zoning
R8B
Community board
108
Council district
5
Block / lot
1551 / 33
Assessed value
$568,350
Landmark / historic district
No

HPD registration #100746, last renewed Sep 5, 2025.

Questions about 350 East 89 Street

Who owns 350 East 89 Street?

The owner of record in NYC Department of City Planning PLUTO data is East 89 St 350 LLC.

Does 350 East 89 Street have violations?

Yes. NYC HPD has recorded 62 housing violations at this property.

Is 350 East 89 Street rent stabilized?

NYC Department of Finance tax bills listed 4 rent-stabilized units here in 2024 (about 33% of its 12 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 350 East 89 Street built?

City records list 1915 as the year it was built.

How many apartments are in 350 East 89 Street?

It has 12 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.