319 East 83 Street
Manhattan, NY 10028BBL 1-01546-0013Map
Owner of record: Dny1 83rd LLC
319 East 83 Street is a walk-up apartment building built in 1920 in Manhattan, 10028. It has 20 residential units across 5 floors. The owner of record is Dny1 83rd LLC. HPD has recorded 41 housing violations here, most recently on June 14, 2026. 5 of the 41 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 41
- DOB violations
- 2
- ECB violations
- 4
- HPD complaints
- 42
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 41
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the kitchen located at apt 1c, 1st story, 1st apartment from north at east
Jun 14, 2026 · Apt 1C
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the kitchen located at apt 1c, 1st story, 1st apartment from north at east
Jun 14, 2026 · Apt 1C
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1c, 1st story, 1st apartment from north at east
Jun 14, 2026 · Apt 1C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1c, 1st story, 1st apartment from north at east
Jun 14, 2026 · Apt 1C
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the bathroom located at apt 2d, 2nd story, 2nd apartment from south at west
May 27, 2026 · Apt 2D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroom located at apt 2d, 2nd story, 2nd apartment from south at west
May 27, 2026 · Apt 2D
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroom located at apt 2d, 2nd story, 2nd apartment from south at west
May 27, 2026 · Apt 2D
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1c, 1st story, 1st apartment from north at east
May 26, 2026 · Apt 1C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1c, 1st story, 1st apartment from north at east
May 26, 2026 · Apt 1C
Closed — Violation dismissed - BHazardous
Replace with new the missing escutcheon plate at upper riser pipe in the bathroom located at apt 2d, 2nd story, 2nd apartment from south at west
May 10, 2026 · Apt 2D
Open — Nov sent out
Show 31 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroom located at apt 2d, 2nd story, 2nd apartment from south at west
May 10, 2026 · Apt 2D
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft at ceiling in the bathroom located at apt 2d, 2nd story, 2nd apartment from south at west
Aug 30, 2025 · Apt 2D
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the bathroom located at apt 2d, 2nd story, 2nd apartment from south at west
Aug 30, 2025 · Apt 2D
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2d, 2nd story, 2nd apartment from south at west
Aug 30, 2025 · Apt 2D
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2d, 2nd story, 2nd apartment from south at west
Aug 30, 2025 · Apt 2D
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and south wall in the bathroom located at apt 2d, 2nd story, 1st apartment from south at west
Aug 22, 2025 · Apt 2D
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the bathroom located at apt 2d, 2nd story, 1st apartment from south at west
Aug 22, 2025 · Apt 2D
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2d, 2nd story, 1st apartment from south at west
Aug 22, 2025 · Apt 2D
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building front entrance door at public hall, 1st story
Apr 15, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1c, 1st story, 1st apartment from north at east
Mar 31, 2024 · Apt 1C
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame at public hall, 1st story
Sep 21, 2023
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing hook and eye device at building front entrance door
Sep 21, 2023
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Aug 30, 2023
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of hook and eye, at the vestibule door
Aug 30, 2023
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Aug 30, 2023
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Aug 30, 2023
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frames missing at public hall, 1st story
Aug 30, 2023
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 30, 2023
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 30, 2023
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Aug 30, 2023
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Aug 30, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Jul 26, 2021
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Jul 26, 2021
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Apr 11, 2021
Closed — Violation closed - CImmediately hazardous
Arrange and make self-closing the doors .. in the entire apartment located at apt 4c, 4th story, 1st apartment from north at east
Apr 11, 2021 · Apt 4C
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - BHazardous
§ 53,187,231 m/d law & dept rules & reg. provide means of egress from yard to street by fireproof passageway for which application must be filed for approval,or by unlocked door or gate in fence to adjoining premises with consent of adjacent owner.
Jun 6, 1994
Open — Not complied with
DOB building violations · 2
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed
ECB violations · 4
- Class - 2
At the time of inspection i observed removal of all hallway light fixture and installation of sixteen new porcelain fixtures. also installation of 6/3 riser from the basement to several apartments in the buildi
Apr 10, 2023 · Penalty $2,000
Resolve - Class - 1
Work without a permit-noted:at time of inspection at apt 1c and commonarea as the third floor new installation of new electrical cables for light in the ceiling.no record of permits issued according to dob reco
Dec 10, 2022 · Penalty $1,250
Resolve - Non-hazardous
Failure to provide approved plans at time of inspection work noted:facade work at md without approved plans noted:install scaffolding to building south facade to repair damaged store and brickwork and roof capp
Mar 27, 2000
Resolve - Non-hazardous
Work without a permit. work noted erected sidewalk shed approx 45'longat facade south of building without a permit. noted location east to west front south. noted illumnated property and maintian however note
Mar 14, 2000
Resolve
Complaints
- Water leak
Heavy flow
Jun 14, 2026 · Apt 1C
Close - Paint/plaster
Ceiling
Jun 14, 2026 · Apt 1C
Close - Paint/plaster
Ceiling
May 26, 2026 · Apt 2D
Close - Paint/plaster
Ceiling
May 25, 2026 · Apt 2D
Close - Water leak
Slow leak
May 8, 2026 · Apt 1C
Close - Plumbing
Steam pipe/riser
May 6, 2026 · Apt 2D
Close - Paint/plaster
Ceiling
May 6, 2026 · Apt 2D
Close - Paint/plaster
Ceiling
May 6, 2026 · Apt 2D
Close - Water leak
Damp spot
May 6, 2026 · Apt 2D
Close - Paint/plaster
Wall
May 6, 2026 · Apt 2D
Close
Show 32 more ↓
- Plumbing
Steam pipe/riser
May 4, 2026 · Apt 2D
Close - Paint/plaster
Ceiling
May 4, 2026 · Apt 2D
Close - Water leak
Damp spot
May 4, 2026 · Apt 2D
Close - Heat/hot water
Entire building
Mar 23, 2026 · Apt BLDG
Close - Door/window
Door
Jan 15, 2026 · Apt 2D
Close - Water leak
Slow leak
Aug 20, 2025 · Apt 2D
Close - Paint/plaster
Ceiling
Aug 20, 2025 · Apt 2D
Close - Paint/plaster
Wall
Aug 20, 2025 · Apt 2D
Close - Unsanitary condition
Mold
Aug 20, 2025 · Apt 2D
Close - Plumbing
Water supply
Aug 15, 2025 · Apt 2D
Close - Plumbing
Water supply
Aug 15, 2025 · Apt 2D
Close - Unsanitary condition
Mold
Jul 25, 2025 · Apt 2D
Close - Electric
Power outage
Jul 1, 2025 · Apt 2A
Close - Heat/hot water
Apartment only
May 24, 2025 · Apt 1C
Close - Heat/hot water
Apartment only
Apr 7, 2025 · Apt 1C
Close - Heat/hot water
Apartment only
Nov 11, 2024 · Apt 1C
Close - Heat/hot water
Apartment only
May 5, 2024 · Apt 1C
Close - Heat/hot water
Apartment only
Apr 2, 2024 · Apt 1C
Close - Heat/hot water
Apartment only
Mar 31, 2024 · Apt 1C
Close - Heat/hot water
Apartment only
Mar 30, 2024 · Apt 1C
Close - Electric
Power outage
Nov 11, 2022 · Apt 1A
Close - Electric
Power outage
Jul 23, 2021 · Apt 4C
Close - Unsanitary condition
Pests
Mar 30, 2021 · Apt 4C
Close - Unsanitary condition
Pests
Mar 30, 2021 · Apt 4C
Close - Nonconst
Vermin
Jul 30, 2013 · Apt 5A
Close - Nonconst
Vermin
Jul 30, 2013 · Apt 5A
Close - Plumbing
Water supply
Jun 3, 2010 · Apt 1D
Close - Plumbing
Water supply
Jun 3, 2010 · Apt 1D
Close - Nonconst
Rubbish
Jun 3, 2010 · Apt 1D
Close - Paint/plaster
Wall
Jun 6, 2005 · Apt 1D
Close - General
Floor
Jun 6, 2005 · Apt 1D
Close - General
Floor
Jun 6, 2005 · Apt 1D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1920
- Floors
- 5
- Residential units
- 20
- Building area
- 9,880 ft²
- Lot area
- 2,554 ft²
- Zoning
- R8B
- Community board
- 108
- Council district
- 5
- Block / lot
- 1546 / 13
- Assessed value
- $1,286,100
- Landmark / historic district
- No
HPD registration #103962, last renewed Sep 23, 2025.
Questions about 319 East 83 Street
Who owns 319 East 83 Street?
The owner of record in NYC Department of City Planning PLUTO data is Dny1 83rd LLC.
Does 319 East 83 Street have violations?
Yes. NYC HPD has recorded 41 housing violations at this property.
Is 319 East 83 Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 30% of its 20 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 319 East 83 Street built?
City records list 1920 as the year it was built.
How many apartments are in 319 East 83 Street?
It has 20 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.