243 East 83 Street
Manhattan, NY 10028BBL 1-01529-0020Map
Owner of record: 243 E 83 Realty LLC
243 East 83 Street is a walk-up apartment building built in 1930 in Manhattan, 10028. It has 22 residential units across 5 floors. The owner of record is 243 E 83 Realty LLC. HPD has recorded 8 housing violations here, most recently on March 13, 2026. City tax records listed 9 rent-stabilized apartments here in 2024.
- HPD violations
- 8
- DOB violations
- 2
- ECB violations
- 6
- HPD complaints
- 38
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 8
- BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from north located at apt 5c, 5th story, 1st apartment from north at east
Mar 13, 2026 · Apt 5C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north and west walls in the 1st room from north located at apt 5c, 5th story, 1st apartment from north at east
Mar 13, 2026 · Apt 5C
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the 2nd room from north located at apt 5c, 5th story, 1st apartment from north at east
Mar 13, 2026 · Apt 5C
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall in the 1st room from north located at apt 5c, 5th story, 1st apartment from north at east
Mar 13, 2026 · Apt 5C
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing kick down door stop at entrance door to building. , 1st story
Mar 13, 2026
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 2nd room from north located at apt 5c, 5th story, 1st apartment from north at east
Mar 13, 2026 · Apt 5C
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north located at apt 5c, 5th story, 1st apartment from north at east
Mar 13, 2026 · Apt 5C
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective lower sash window counter balance in the 1st room from east located at apt 4d, 4th story, 2nd apartment from north at east
Jul 18, 2017 · Apt 4D
Closed — Violation dismissed
DOB building violations · 2
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 6
- Class - 1
Sec. 3314.8.2 failure to maintain vertical netting. at the time of inspection,i observed a sidewalk shed w/scaffolding w/vertical netting atexp#1 w/multiple holes in netting system. hazardous condition to the
Aug 8, 2019 · Penalty $2,500
Resolve - Class - 2
Storage:storage not allowed unless permits states designated area.note:at time of inspection observed sidewalk shed being used for storage at expo.1 equipment and materials,gang box, garbage bags, laders blick
Sep 14, 2018 · Penalty $2,400
Resolve - Class - 1
Partial stop work order of supported scaffold and all facde job issued to 28-207.2 and posted at site,work doesn't conform to approved consturction docuemnt of approve amendments.noted:at time of inspection i o
Sep 14, 2018
Resolve - Class - 2
3307.6.5.8-no periodic inspection-note:at time of inspection i observed sidewalk shed and supported scaffold in place, no six month insp on site as required by code.comply with code provide six month inspection
Sep 14, 2018 · Penalty $620
Resolve - Class - 1
Failure to maintain adequate house keeping at time of inspection observed that housekeeping was inadequate at various locations through out the job site and debris found on supported scaffold walk wall at expo
Sep 14, 2018
Resolve - Class - 1
Work does not conform to approved plans.note:at time of inspection i observed sidewalk shed in place at exposure#1 the distance from face of building is approx.3' that does not meet approved plans and also the
Sep 14, 2018 · Penalty $2,500
Resolve
Complaints
- Water leak
Slow leak
Feb 11, 2026 · Apt 5C
Close - Water leak
Damp spot
Feb 11, 2026 · Apt 5C
Close - Unsanitary condition
Mold
Feb 11, 2026 · Apt 5C
Close - General
Ventilation system
Jul 8, 2017 · Apt 4D
Close - Heating
Heat related
Mar 4, 2014 · Apt 3B
Close - Heating
Heat related
Nov 14, 2012 · Apt 4A
Close - Heating
Heat related
Nov 6, 2012 · Apt 4D
Close - Paint/plaster
Ceiling
Aug 16, 2011 · Apt 5C
Close - Paint/plaster
Ceiling
Aug 16, 2011 · Apt 5C
Close - Paint/plaster
Ceiling
Aug 16, 2011 · Apt 5C
Close
Show 28 more ↓
- Nonconst
Smoke detector
Aug 16, 2011 · Apt 5C
Close - Plumbing
Water-leaks
Aug 16, 2011 · Apt 5C
Close - Plumbing
Water-leaks
Aug 16, 2011 · Apt 5C
Close - Heating
Heat related
Feb 14, 2010 · Apt 2A
Close - Heating
Heat related
Jan 30, 2010 · Apt 2A
Close - Heating
Heat related
Jun 29, 2008 · Apt 2A
Close - Heating
Heat related
Dec 26, 2005 · Apt 3A
Close - Heating
Heat related
Dec 26, 2005 · Apt BSMT
Close - Heating
Heat related
Dec 26, 2005 · Apt 3C
Close - Nonconst
Janitor/super
Dec 26, 2005 · Apt 3C
Close - Heating
Heat related
Jan 25, 2005 · Apt 3C
Close - Heating
Heat related
Dec 25, 2004 · Apt 1C
Close - Heating
Heat related
Dec 25, 2004 · Apt BLDG
Close - Heating
Radiator
Nov 1, 2004 · Apt 1A
Close - General
Locks
Nov 1, 2004 · Apt 1A
Close - Nonconst
Vermin
Nov 1, 2004 · Apt 1A
Close - Paint/plaster
Ceiling
Aug 16, 2004 · Apt 5A
Close - Plumbing
Basin/sink
Mar 12, 2003 · Apt GRA
Close - Plumbing
Bathtub/shower
Mar 3, 2003 · Apt GA
Close - Paint/plaster
Wall
Mar 3, 2003 · Apt GA
Close - General
Windows
Mar 3, 2003 · Apt GA
Close - Heating
Radiator
Mar 3, 2003 · Apt GA
Close - General
Ventilators
Mar 3, 2003 · Apt GA
Close - Electric
Wiring
Mar 3, 2003 · Apt GA
Close - General
Doors
Mar 3, 2003 · Apt GA
Close - General
Doors
Mar 3, 2003 · Apt GA
Close - General
Floor
Mar 3, 2003 · Apt GA
Close - General
Mold
Mar 3, 2003 · Apt GA
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C5)
- Year built
- 1930
- Floors
- 5
- Residential units
- 22
- Building area
- 9,780 ft²
- Lot area
- 2,860 ft²
- Zoning
- R8B
- Community board
- 108
- Council district
- 5
- Block / lot
- 1529 / 20
- Assessed value
- $1,476,900
- Landmark / historic district
- No
HPD registration #120523, last renewed Jul 27, 2026.
Questions about 243 East 83 Street
Who owns 243 East 83 Street?
The owner of record in NYC Department of City Planning PLUTO data is 243 E 83 Realty LLC.
Does 243 East 83 Street have violations?
Yes. NYC HPD has recorded 8 housing violations at this property.
Is 243 East 83 Street rent stabilized?
NYC Department of Finance tax bills listed 9 rent-stabilized units here in 2024 (about 41% of its 22 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 243 East 83 Street built?
City records list 1930 as the year it was built.
How many apartments are in 243 East 83 Street?
It has 22 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.