340 East 61 Street
Manhattan, NY 10065BBL 1-01435-0031Map
Owner of record: 340 East 61 Realty Associates LLC
340 East 61 Street is a walk-up apartment building built in 1910 in Manhattan, 10065. It has 20 residential units across 5 floors. The owner of record is 340 East 61 Realty Associates LLC. HPD has recorded 12 housing violations here, most recently on April 1, 2021. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 12
- DOB violations
- 5
- ECB violations
- 4
- HPD complaints
- 60
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 12
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jan 26, 2021
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of air conditioner at fire escape window at 3rd story balcony at building front
Jan 26, 2021
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following minimum of 100 watts as required(light fixture(s) present). at front areaway
Jun 11, 2018
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north
Jan 5, 2018 · Apt 2A
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked boiler room at basement
Jan 5, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2016
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling north one room in the 1st room from north located at apt 2d, 2nd story, 1st apartment from east at south
Oct 23, 2012 · Apt 2D
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water at bathtub faucet in the bathroom located at apt 2d, 2nd story, 1st apartment from east at south
Oct 23, 2012 · Apt 2D
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color bathroom ceiling and east wall 1 sty east apt 1a er1. , section '' ''
Oct 10, 1990 · Apt 1A
Closed — Violation dismissed
Show 2 more ↓
- ANon-hazardous
D26-10.01 adm code refit bulkhead door roof.
Jan 7, 1987
Closed — Violation dismissed - BHazardous
D26-10.01, 10.05 adm code arrange and make self-closing the doors bulkhead door roof.
Jan 7, 1987
Closed — Violation dismissed
DOB building violations · 5
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Construction other optional
Failure to provide approved/accepted plans at jobsite at time of inspe ction contractor performing minor interior demolition partition change s with no approved plans on jobsite remedy: stop all work provide approved plans
Oct 21, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boiler boiler optional
B-boiler boiler optional
Jul 11, 1994
Vp*-violation unserved ecb- dismissed
ECB violations · 4
- Class - 2
Observed pop safety valve on hb smith boiler leaking steam. the backflow is missing the pipe down, the gauge glass is dirty. correct all violating conditions and submit a certificate of corrections
Apr 3, 2024
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operation. "no smoking" signs w/i construction site not observed or inadequate in violation of nyc fire code 1404.1 & fc 310. at time of insp
Oct 21, 2008 · Penalty $1,200
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements. noted: bldg having stored in the bsmt - laundry (residence), gas meter, rooms & common hallway. excessive construction debris in black plastic
Jul 13, 2008
Resolve - Non-hazardous
34a,50a. 50a-safety relief valve needs to be piped down with no threads on end as per code
Nov 12, 2003 · Penalty $350
Resolve
Complaints
- General
Signage missing
Sep 29, 2026 · Apt BLDG
Open - Unsanitary condition
Pests
Nov 21, 2021 · Apt 4A
Close - Water leak
Heavy flow
Nov 11, 2021 · Apt 4A
Close - Unsanitary condition
Pests
Nov 11, 2021 · Apt 4A
Close - Electric
Outlet/switch
Nov 7, 2021 · Apt 4A
Close - Water leak
Damp spot
Nov 7, 2021 · Apt 4A
Close - Electric
No lighting
Nov 7, 2021 · Apt 4A
Close - Unsanitary condition
Mold
Nov 7, 2021 · Apt 4A
Close - Heat/hot water
Apartment only
Jan 25, 2021 · Apt 2D
Close - General
Cabinet
Sep 15, 2020 · Apt 2D
Close
Show 40 more ↓
- Plumbing
Basin/sink
Sep 15, 2020 · Apt 2D
Close - Heat/hot water
Entire building
Feb 21, 2020 · Apt 1D
Close - Electric
No lighting
Jun 11, 2018 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 7, 2018 · Apt 2A
Close - Heat/hot water
Apartment only
Jan 1, 2018 · Apt 2A
Close - Heat/hot water
Apartment only
Dec 30, 2017 · Apt 2A
Close - Heat/hot water
Entire building
Dec 30, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 27, 2017 · Apt BLDG
Close - Heating
Heat related
Feb 18, 2014 · Apt NA
Close - Heating
Heat related
Feb 18, 2014 · Apt NA
Close - Heating
Heat related
Jan 22, 2014 · Apt NA
Close - Heating
Heat related
Dec 8, 2013 · Apt 2D
Close - Heating
Heat related
Nov 28, 2013 · Apt NA
Close - Plumbing
Water supply
Oct 21, 2012 · Apt 2D
Close - Paint/plaster
Ceiling
Oct 21, 2012 · Apt 2D
Close - Paint/plaster
Ceiling
Jan 28, 2010 · Apt 5C
Close - Plumbing
Basin/sink
Jan 28, 2010 · Apt 5C
Close - General
Cabinet
Jan 28, 2010 · Apt 5C
Close - Electric
Lighting
Jan 28, 2010 · Apt 5C
Close - Plumbing
Water supply
Jan 28, 2010 · Apt 5C
Close - General
Floor
Jan 28, 2010 · Apt 5C
Close - Electric
Electric-supply
May 28, 2009 · Apt 2C
Close - Heating
Heat related
Feb 21, 2009 · Apt 2C
Close - Nonconst
Vermin
Jan 6, 2009 · Apt 2C
Close - Nonconst
Vermin
Jan 6, 2009 · Apt 2C
Close - Heating
Heat related
Oct 19, 2008 · Apt 3B
Close - Nonconst
Rubbish
Oct 3, 2008 · Apt 3B
Close - Nonconst
Janitor/super
Oct 3, 2008 · Apt 3B
Close - Nonconst
Rubbish
Oct 3, 2008 · Apt 3B
Close - Nonconst
Rubbish
Sep 30, 2008 · Apt 3B
Close - Heating
Heat related
Nov 5, 2007 · Apt 3C
Close - Heating
Heat related
Feb 8, 2005 · Apt BLDG
Close - Heating
Heat related
Jan 29, 2005 · Apt 4B
Close - Heating
Heat related
Jan 28, 2005 · Apt 1A
Close - Heating
Heat related
Jan 26, 2005 · Apt 5C
Close - Heating
Heat related
Jan 26, 2005 · Apt 5C
Close - Nonconst
Janitor/super
Aug 19, 2003 · Apt BLDG
Close - Nonconst
Rubbish
Aug 19, 2003 · Apt BLDG
Close - General
Floor
Aug 4, 2003 · Apt 3B
Close - Heating
Heat related
Apr 5, 2003 · Apt 1D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C5)
- Year built
- 1910
- Floors
- 5
- Residential units
- 20
- Building area
- 9,510 ft²
- Lot area
- 2,812 ft²
- Zoning
- C8-4
- Community board
- 108
- Council district
- 5
- Block / lot
- 1435 / 31
- Assessed value
- $1,529,100
- Landmark / historic district
- No
HPD registration #108977, last renewed Jul 27, 2026.
Questions about 340 East 61 Street
Who owns 340 East 61 Street?
The owner of record in NYC Department of City Planning PLUTO data is 340 East 61 Realty Associates LLC.
Does 340 East 61 Street have violations?
Yes. NYC HPD has recorded 12 housing violations at this property.
Is 340 East 61 Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 30% of its 20 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 340 East 61 Street built?
City records list 1910 as the year it was built.
How many apartments are in 340 East 61 Street?
It has 20 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.