115 East 60 Street
Manhattan, NY 10022BBL 1-01395-0007Map
Owner of record: Vrahos LLC
115 East 60 Street is a walk-up apartment building built in 1900 in Manhattan, 10022. It has 7 residential units across 5 floors. The owner of record is Vrahos LLC. HPD has recorded 67 housing violations here, most recently on April 29, 2026. 20 of the 50 most recent violations are still open. City tax records listed 3 rent-stabilized apartments here in 2024.
- HPD violations
- 67
- DOB violations
- 4
- ECB violations
- 14
- HPD complaints
- 217
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 67
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2025
Open — Info nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing consisting of kick stand installed at door at vestibule at basement
Sep 1, 2025
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items/stroller at public hall, 3rd story
May 20, 2025
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3f, 3rd story, 1st apartment from east at south
Jan 28, 2025 · Apt 3F
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3f, 3rd story, 1st apartment from east at south
Jan 28, 2025 · Apt 3F
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3f, 3rd story, 1st apartment from east at south
Jan 28, 2025 · Apt 3F
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective inoperative intercom system from building entrance to north wall panel in the 2nd room from north located at apt 3f, 3rd story, 1st apartment from east at south
Jan 28, 2025 · Apt 3F
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 3f, 3rd story, 1st apartment from east at south
Jan 28, 2025 · Apt 3F
Open — Nov sent out
Show 40 more ↓
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 22, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3f, 3rd story, 1st apartment from east at south
Feb 6, 2024 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked in basement. at boiler room
Feb 6, 2024
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3f, 3rd story, 1st apartment from east at south
Feb 6, 2024 · Apt 3F
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3f, 3rd story, 1st apartment from east at south
Feb 6, 2024 · Apt 3F
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at hinges in the entrance located at apt 3f, 3rd story, 1st apartment from east at south
Feb 6, 2024 · Apt 3F
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3f, 3rd story, 1st apartment from east at south
Feb 4, 2024 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Feb 4, 2024
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3f, 3rd story, 1st apartment from east at south
Feb 4, 2024 · Apt 3F
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3f, 3rd story, 1st apartment from east at south
Feb 4, 2024 · Apt 3F
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3f, 3rd story, 1st apartment from east at south
Feb 4, 2024 · Apt 3F
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing kick foot stand installed at vestibule door , 1st story
Feb 4, 2024
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Aug 11, 2020
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of tables and chairs etc. at public hall, 1st story
Feb 13, 2017
Closed — Violation closed - ANon-hazardous
Paint or post a sign indicating floors , at public hall, 1st story
Feb 13, 2017
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked. at boiler room
Dec 5, 2015
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3f, 3rd story, 1st apartment from east at south
Dec 5, 2015 · Apt 3F
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit located at apt 3r, 2nd story, 1st apartment from north at east
Nov 29, 2015 · Apt 3R
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 1, 2015
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of a standing disconnected radiator in the 2nd room from north located at apt 3f, 2nd story, 1st apartment from east at south
Aug 22, 2015 · Apt 3F
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of an uncapped steam pipe in the 2nd room from north located at apt 3f, 2nd story, 1st apartment from east at south
Aug 22, 2015 · Apt 3F
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of free standing radiator in the 1st room from north located at apt 3f, 3rd story, apartment at west
Aug 15, 2015 · Apt 3F
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story
Aug 15, 2015
Open — Not complied with - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Aug 15, 2015
Open — Not complied with - ANon-hazardous
Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story
Aug 15, 2015
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .. at public hall, 1st story
Aug 15, 2015
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 15, 2015
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of leaking steam at disconnected radiator gate valve in the 1st room from north located at apt 3f, 3rd story, apartment at west
Aug 15, 2015 · Apt 3F
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and all walls in the entire apartment located at apt 3f, 3rd story, apartment at west
Aug 15, 2015 · Apt 3F
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Jun 25, 2015
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of flower pot hanging exterior top rail on 1st story balcony above basemnt building front entrance
Jun 25, 2015
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing
Aug 15, 2014
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt bldg, 4th story, 1st apartment from east at south
Aug 15, 2014 · Apt BLDG
Open — First no access to re- inspect violation - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 5r, 4th story, 1st apartment from north at east
May 30, 2013 · Apt 5R
Closed — Violation closed - CImmediately hazardous
Replace with new the missing balustrade at public hall stairs, 3rd story
Dec 17, 2012
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north located at apt 3f, 3rd story, 2nd apartment from east at south
Nov 18, 2011 · Apt 3F
Closed — Violation closed
DOB building violations · 4
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 26, 2019
Dob violation - dismissed - Construction other optional
Failure to provide fire rating on structural assemblies under first fl oor at rear two story noted: alt 1 permit #110341719 remedy: provide code comlaint fire protection of floor joists
Jan 27, 2009
Dob violation - dismissed - Construction other optional
Work does not conform to approved construction documents noted: at 1 p ermit #110341719.no 4" x6' x3/8" steel angle installed at rear to secu re floor joists under first floor no joists ancharage shown on plans t o secure joists in masonry walls at front new joist welded to steel an gles under roof remedy: stop all work provide plans for joists install
Jan 27, 2009
Dob violation - dismissed - Construction other optional
Miscelaneous violations failure to comply with a stop work by dob part ial swo issued 7/26/08 ecb 34689432h dob 072608ci08kp01 for removal of walls & ceilings workers on site at time of inspection removing plast er & lath walls & ceilings at apt 2r & 2f and as per statment by forem an have been doing remedy: stop all work immedialty comply with notice
Oct 21, 2008
Dob violation - dismissed
ECB violations · 14
- Class - 2
Altered/changed building occupied w/o a valid certificate of occupancy as per 28-118.3.1-28-118.3.2. noted; alt-1 job# 110341719 permit issued on 12/12/17 at time of inspection, job not signed off, premised is
Jan 31, 2023 · Penalty $1,250
Active - Class - 2
Altered/changed building occupied w/o a valid certificate of occupancyas per 28-118.3.1-28-118.3.2. noted;alt-1 job#110341719 permit issued on 12/12/17 at time of inspection,job not signed off,and no valid or r
Nov 10, 2020 · Penalty $6,250
Active - Class - 2
Failure to comply w/ commissioner's order contained in summons/violation#35359252p issued on 3/6/19,and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2). an acceptable certificate
Jan 14, 2020 · Penalty $625
Resolve - Class - 2
Failure to comply w/ commissioner's order contained in summons/violation#35359255k issued on 3/6/19,and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2). an acceptable certificate
Jan 14, 2020 · Penalty $625
Resolve - Class - 2
Fail to provide effective electrical continuity for metal raceway enclosures cable armor.raceways enclosures cable armor.raceways to hallwayfixtures not continuous.rem:provide effective electrical continuity
Mar 6, 2019 · Penalty $1,200
Resolve - Class - 2
Failure to provide face plate cover lamp holder luminaire canopy for electrical outlet end line box cover missing in basement.rem:comply with ec code
Mar 6, 2019 · Penalty $500
Resolve - Class - 1
Electrical work without a permit.observed at 11:45 am exit and emergency lights installed.no application on file for electrical work.rem:obtain permit
Mar 6, 2019 · Penalty $1,600
Resolve - Class - 2
Unapproved unsafe unsuitable electrical equipment devices apparatus appliances materials or wiring in use expose wiring in hallways.rem:comply with ec code
Mar 6, 2019 · Penalty $800
Resolve - Class - 2
Fail to maintain/secured exhaust fan on roof.noted:commercial kitchen exhaust which belongs to "amali restaurant" on 1st fl is not secured properly on isolators causing vibration & discomfort to tenant below.
Mar 30, 2013 · Penalty $250
Resolve - Class - 2
Failure to provide approved/accepted plans at job site at time of inspection. contractor installing new joists and performing partial interior demolition in apts 2f & 2r with no plans on job site at time of ins
Oct 21, 2008 · Penalty $250
Resolve
Show 4 more ↓
- Class - 2
Sec.27-323 714.1 misc violations. failure to provide required fire rating on structural members or assemblies,contractor has removed finish flooring,sub flooring,plaster & lath at apts 2f & 2r exposing load bea
Oct 21, 2008 · Penalty $400
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations. "no smoking" signs w/i construction site not observed orinadequate in violation of nyc fire code 1401.1 and fc 310. at time of in
Oct 21, 2008
Resolve - Class - 2
Work w/o a permit. work noted: bldg having on 1st floor - apts #2r & 2f removed walls & ceilings finished to expose beams & studs of bathrooms areas & removed partitions at entrance area of front apt. also
Jul 26, 2008 · Penalty $800
Resolve - Non-hazardous
Work contrary to approved plans:noted:plans #104529609 dated 9/13/06 show existing interior non-bearing,walls by kitchen & bathroom to remain at inspection these walls where demolished not complying w/plans.rem
Aug 7, 2007
Resolve
Complaints
- Paint/plaster
Ceiling
Mar 12, 2026 · Apt 3F
Close - Water leak
Slow leak
Mar 12, 2026 · Apt 3F
Close - Water leak
Heavy flow
Feb 4, 2025 · Apt 3F
Close - Water leak
Slow leak
Feb 4, 2025 · Apt 3F
Close - Water leak
Heavy flow
Feb 4, 2025 · Apt 3F
Close - Heat/hot water
Apartment only
Jan 25, 2025 · Apt 5R
Close - Water leak
Heavy flow
Jan 23, 2025 · Apt 3F
Close - Paint/plaster
Ceiling
Jan 23, 2025 · Apt 3F
Close - Unsanitary condition
Mold
Jan 23, 2025 · Apt 3F
Close - Unsanitary condition
Pests
Jan 23, 2025 · Apt 3F
Close
Show 40 more ↓
- Unsanitary condition
Sewage
Jan 23, 2025 · Apt 3F
Close - Heat/hot water
Apartment only
Jan 9, 2025 · Apt 5R
Close - Heat/hot water
Entire building
Nov 27, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 25, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 24, 2024 · Apt 3F
Close - Heat/hot water
Entire building
Feb 6, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2024 · Apt 3F
Close - Heat/hot water
Entire building
Feb 4, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 3, 2024 · Apt 3F
Close - Heat/hot water
Entire building
Jan 27, 2024 · Apt 3F
Close - Heat/hot water
Entire building
Jan 15, 2024 · Apt 3F
Close - Heat/hot water
Entire building
Nov 23, 2023 · Apt 3F
Close - Heat/hot water
Entire building
Apr 5, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 5, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 7, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 23, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 13, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 31, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 8, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 14, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 26, 2021 · Apt 3F
Close - Heat/hot water
Entire building
Nov 25, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 23, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 23, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 21, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 24, 2020 · Apt 3F
Close - Heat/hot water
Entire building
Sep 11, 2020 · Apt A1
Close - Heat/hot water
Entire building
Sep 8, 2020 · Apt 3F
Close - Plumbing
Water supply
Aug 7, 2020 · Apt 4R
Close - Heat/hot water
Entire building
Jul 18, 2020 · Apt 3F
Close - Heat/hot water
Entire building
Jul 17, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 17, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 14, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 13, 2020 · Apt BLDG
Close - Plumbing
Water supply
Jun 22, 2020 · Apt 5R
Close - Heat/hot water
Entire building
Feb 14, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 2, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 1, 2019 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1900
- Floors
- 5
- Residential units
- 7
- Building area
- 6,860 ft²
- Lot area
- 2,008 ft²
- Zoning
- R8B
- Community board
- 108
- Council district
- 4
- Block / lot
- 1395 / 7
- Assessed value
- $2,389,500
- Landmark / historic district
- No
HPD registration #133483, last renewed Dec 3, 2024.
Questions about 115 East 60 Street
Who owns 115 East 60 Street?
The owner of record in NYC Department of City Planning PLUTO data is Vrahos LLC.
Does 115 East 60 Street have violations?
Yes. NYC HPD has recorded 67 housing violations at this property.
Is 115 East 60 Street rent stabilized?
NYC Department of Finance tax bills listed 3 rent-stabilized units here in 2024 (about 43% of its 7 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 115 East 60 Street built?
City records list 1900 as the year it was built.
How many apartments are in 115 East 60 Street?
It has 7 residential units and 9 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.