22 Riverside Drive
Manhattan, NY 10023BBL 1-01184-7501Map
Owner of record: 22 Riverside Drive Condominum
22 Riverside Drive is a condominium built in 1931 in Manhattan, 10023. It has 23 residential units across 19 floors. The owner of record is 22 Riverside Drive Condominum. HPD has recorded 43 housing violations here, most recently on July 28, 2024. City tax records listed 2 rent-stabilized apartments here in 2024.
- HPD violations
- 43
- DOB violations
- 16
- ECB violations
- 5
- HPD complaints
- 33
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 43
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at elevator machine room door at basement
Jul 28, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door at east leading to public hall stairs a at public hall, 4th story
Jun 29, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door at east leading to public hall stairs a at public hall, 9th story
Jun 29, 2024
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Aug 16, 2022
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Aug 16, 2022
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Aug 16, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Aug 16, 2022
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Aug 16, 2022
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Aug 16, 2022
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 16, 2022
Closed — Violation dismissed
Show 33 more ↓
- ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 16, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .... in the entrance located at apt 4b, 4th story, 1st apartment from south at west
Aug 9, 2022 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .... in the entrance located at apt 15b, 15th story, 1st apartment from south at west
Aug 9, 2022 · Apt 15B
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 16, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 16, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2019
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceilings and walls in the entire apartment located at apt 9a, 9th story, apartment at south
Mar 14, 2007 · Apt 9A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color wall in the 1st room from east at north located at apt 9a, 9th story, 1st apartment from east at south
Aug 8, 2006 · Apt 9A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceilimg in the kitchen located at apt 14a, 14th story, apartment at south
Jul 27, 2006 · Apt 14A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the bathroom located at apt 14a, 14th story, apartment at south
Jul 27, 2006 · Apt 14A
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceilings and walls in the entire apartment located at apt 10a, 10th story, 1st apartment from east at south
Jun 17, 2006 · Apt 10A
Closed — Violation dismissed - ANon-hazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 10a, 10th story, 1st apartment from east at south
Jun 17, 2006 · Apt 10A
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 10a, 10th story, 1st apartment from east at south
Jun 17, 2006 · Apt 10A
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north located at apt 9a, 9th story, 1st apartment from east at south
Jun 7, 2006 · Apt 9A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceili ng and walls in closet in the 1st room from north located at apt 9a, 9th story, 1st apartment from east at south
Jun 7, 2006 · Apt 9A
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the private hallway located at apt 9a, 9th story, 1st apartment from east at south
Jun 7, 2006 · Apt 9A
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective doors on wall cabinets in the kitchen located at apt 9a, 9th story, 1st apartment from east at south
Jun 7, 2006 · Apt 9A
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective electrical wall outlets on north wall in the 2nd room from north located at apt 9a, 9th story, 1st apartment from east at south
Jun 7, 2006 · Apt 9A
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective ceiling light fixture in the foyer located at apt 9a, 9th story, 1st apartment from east at south
Jun 7, 2006 · Apt 9A
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 9a, 9th story, 1st apartment from east at south
Jun 7, 2006 · Apt 9A
Closed — Violation dismissed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 9a, 9th story, 1st apartment from east at south
Jun 7, 2006 · Apt 9A
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective ceramic tiles around bathtub (by grouting) in the bathroom located at apt 9a, 9th story, 1st apartment from east at south
Jun 7, 2006 · Apt 9A
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the radiator in the kitchen located at apt 9a, 9th story, 1st apartment from east at south
Jun 7, 2006 · Apt 9A
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective wood floor in the 2nd room from north located at apt 9a, 9th story, 1st apartment from east at south
Jun 7, 2006 · Apt 9A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department south wall in the 2nd room from north located at apt 9a, 9th story, 1st apartment from east at south
Jun 7, 2006 · Apt 9A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from north located at apt 15b, 15th story
Mar 4, 2004 · Apt 15B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color livingroom east wall in the 1st room from north located at apt 15b, 15th story
Mar 4, 2004 · Apt 15B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceilings & walls 4 sty west apt 4b thru out. , section '' ''
Aug 14, 1991 · Apt 4B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department wood trim thru outnortheast & southwest rooms 4 sty west apt 4b. , section '' ''
Aug 14, 1991 · Apt 4B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department interior surface main entrance door public hall to 4 sty west apt 4b. , section '' ''
Aug 14, 1991 · Apt 4B
Closed — Violation closed - ANon-hazardous
D26-10.01 adm code properly repair with similar material the broken or defective ceiling boiler room cellar.
Jan 14, 1985
Closed — Violation closed - ANon-hazardous
D26-12.01 adm code paint with light colored paint to the satisfaction of this department walls ceilings north and south fire stairs allstys.
Jan 14, 1985
Closed — Violation closed - ANon-hazardous
D26-12.01 adm code paint with light colored paint to the satisfaction of this department ceilings public halls all stys.
Jan 14, 1985
Closed — Violation closed
DOB building violations · 16
- Construction other optional
A-1 structure rendered non-compliant due to lighting struck at exposure#2 up at water tower. jarred some copping bricks loose, however sidewalk shed in process of going up at exposure#1 and howard l. zimmerman architect and engineers are involved with the building repairs.
Aug 19, 2025
Dob violation - dismissed - Hazardous condition (facade) facade required
Cycle 9a unsafe report filed
Dec 20, 2024
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 16, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 16, 2019
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7a technical report by 02/21/2012
Jan 31, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 15, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 15, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 24, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 24, 2011
Dob violation - resolved
Show 6 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
May 24, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 13, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 14, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 23, 2003
Dob violation - resolved
ECB violations · 5
- Class - 1
Failure to take/provide required action to secure public safety at a designated unsafe building facade as per unsafe notification.note:unsafe notification#unsafe-1003673-10a-001 dated 8/19/2025 was filed by qew
Aug 27, 2025 · Penalty $10,000
Resolve - Non-hazardous
39q07.54u12.28q11.39o02.36o02. 39 install all light guard in machine room 54 reshackle drum to cut cables 28 over door operator 39 clean equipment rm # 36 clean overhead equipment rm
Mar 4, 2008 · Penalty $2,500
Resolve - Non-hazardous
38-r-09/83-b-07/38-illegal alteration for cartop remove/83-using elevator for construtcion w/o proper permits
Oct 4, 2006 · Penalty $180
Resolve - Hazardous
Sidewalk shed does not meet bldg code spec. defect noted: missing portion of sidewalk shed approx 30'l x 14'h. noted location: s.w. corner of bldg. remedy:stop all wk immediately except to make safe.
Aug 16, 2006
Resolve - Hazardous
Failure to post d.o.t. permit for st./sidewalk closing. note: sidewalkclosed w/the installation of caution tape(yellow) & 24" high cones. noted location: s.w. corner of bldg. remedy: post permit
Aug 16, 2006 · Penalty $200
Resolve
Complaints
- Paint/plaster
Wall
Jan 9, 2020 · Apt 2B
Close - Paint/plaster
Wall
Mar 6, 2007 · Apt 9A
Close - Paint/plaster
Wall
Mar 6, 2007 · Apt 9A
Close - Plumbing
Shower-stall
Mar 6, 2007 · Apt 9A
Close - Paint/plaster
Wall
Mar 6, 2007 · Apt 9A
Close - Heating
Heat related
Nov 5, 2006 · Apt 8B
Close - Plumbing
Basin/sink
Aug 14, 2006 · Apt 10A
Close - General
Windows
Aug 8, 2006 · Apt 9A
Close - Paint/plaster
Wall
Aug 8, 2006 · Apt 9A
Close - Plumbing
Water supply
Aug 7, 2006 · Apt 9A
Close
Show 23 more ↓
- Plumbing
Water supply
Aug 7, 2006 · Apt 9A
Close - General
Windows
Jul 25, 2006 · Apt 14A
Close - General
Ceramic-tile
Jul 25, 2006 · Apt 14A
Close - Paint/plaster
Wall
Jul 25, 2006 · Apt 14A
Close - General
Floor
Jul 25, 2006 · Apt 14A
Close - Plumbing
Water-leaks
Jun 15, 2006 · Apt 10A
Close - Paint/plaster
Wall
Jun 15, 2006 · Apt 10A
Close - General
Doors
Jun 15, 2006 · Apt 10A
Close - Plumbing
Water-leaks
Jun 13, 2006 · Apt 10A
Close - Paint/plaster
Wall
Jun 5, 2006 · Apt 9A
Close - Plumbing
Water-leaks
Jun 5, 2006 · Apt 9A
Close - Plumbing
Basin/sink
Jun 5, 2006 · Apt 9A
Close - Plumbing
Water supply
May 4, 2006 · Apt 9A
Close - Plumbing
Water supply
May 4, 2006 · Apt 10A
Close - Plumbing
Water supply
May 4, 2006 · Apt 10A
Close - Heating
Heat related
Mar 8, 2006 · Apt 13B
Close - Heating
Heat related
Mar 8, 2006 · Apt 1A
Close - Heating
Heat related
Dec 3, 2005 · Apt 13B
Close - Heating
Heat related
Nov 25, 2005 · Apt 3B
Close - Plumbing
Water-leaks
Mar 2, 2004 · Apt 15B
Close - Electric
Electric-supply
Feb 8, 2004 · Apt 12B
Close - Heating
Heat related
Feb 8, 2004 · Apt 12B
Close - Plumbing
Water supply
Feb 7, 2004 · Apt 15B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RD)
- Year built
- 1931
- Floors
- 19
- Residential units
- 23
- Building area
- 37,408 ft²
- Lot area
- 2,995 ft²
- Zoning
- R10A
- Community board
- 107
- Council district
- 6
- Block / lot
- 1184 / 7501
- Assessed value
- $5,587,463
- Landmark / historic district
- West End-Collegiate Historic District
HPD registration #125102, last renewed Sep 16, 2025.
Questions about 22 Riverside Drive
Who owns 22 Riverside Drive?
The owner of record in NYC Department of City Planning PLUTO data is 22 Riverside Drive Condominum.
Does 22 Riverside Drive have violations?
Yes. NYC HPD has recorded 43 housing violations at this property.
Is 22 Riverside Drive rent stabilized?
NYC Department of Finance tax bills listed 2 rent-stabilized units here in 2024 (about 9% of its 23 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 22 Riverside Drive built?
City records list 1931 as the year it was built.
How many apartments are in 22 Riverside Drive?
It has 23 residential units and 33 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.