412 West 56 Street
Manhattan, NY 10019BBL 1-01065-0041Map
Owner of record: Uvi Holdings LLC
412 West 56 Street is a walk-up apartment building built in 1920 in Manhattan, 10019. It has 20 residential units across 5 floors. The owner of record is Uvi Holdings LLC. HPD has recorded 47 housing violations here, most recently on June 9, 2026. 17 of the 47 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 47
- DOB violations
- 1
- ECB violations
- 1
- HPD complaints
- 17
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 47
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling, north wall, south wall, west wall in the 2nd bathroom from east located at apt 2, 1st story, 2nd apartment from south at west
Jun 9, 2026 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 30 sq. ft. at ceiling, north wall, west wall, south wall, and east wall in the 2nd bathroom from east located at apt 2, 1st story, 2nd apartment from south at west
Jun 9, 2026 · Apt 2
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall in the 2nd bathroom from east located at apt 2, 1st story, 2nd apartment from south at west
Jun 9, 2026 · Apt 2
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall in the 1st room from north located at apt 2, 1st story, 2nd apartment from south at west
Jun 9, 2026 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl .. at community bathroom, 1st story
Jun 9, 2026
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from north at east wall in the 2nd bathroom from east located at apt 2, 1st story, 2nd apartment from south at west
Jun 9, 2026 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall, 1st door frame from south at west wall, south wall, 1st window frame from east at south wall in the 1st bathroom from east located at apt 2, 1st story, 2nd apartment from south at west
Jun 9, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door from north at east wall, 1st door frame from north at east wall, east wall, west wall in the kitchen located at apt 2, 1st story, 2nd apartment from south at west
Jun 9, 2026 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame, 1st window frame from west at north wall, 2nd window frame from west at north wall in the 1st room from north located at apt 2, 1st story, 2nd apartment from south at west
Jun 9, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from north at east wall in the 2nd bathroom from east located at apt 2, 1st story, 2nd apartment from south at west
Jun 9, 2026 · Apt 2
Open — Civ14 mailed
Show 37 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall, west wall in the kitchen located at apt 2, 1st story, 2nd apartment from south at west
Jun 9, 2026 · Apt 2
Open — Civ14 mailed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door from north at east wall, 1st door frame from north at east wall in the kitchen located at apt 2, 1st story, 2nd apartment from south at west
Jun 9, 2026 · Apt 2
Open — Civ14 mailed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2, 1st story, 2nd apartment from south at west
Jun 9, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from north at east wall in the 2nd bathroom from east located at apt 2, 1st story, 2nd apartment from south at west
Jun 9, 2026 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall, ceiling in the 1st bathroom from east located at apt 2, 1st story, 2nd apartment from south at west
Jun 9, 2026 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall, south wall, picture moulding at east wall, picture moulding at west wall in the kitchen located at apt 2, 1st story, 2nd apartment from south at west
Jun 9, 2026 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the 1st room from north located at apt 2, 1st story, 2nd apartment from south at west
Jun 9, 2026 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall, north wall in the 1st room from north located at apt 2, 1st story, 2nd apartment from south at west
Jun 9, 2026 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 30 sq. feet at ceilng and all walls ceiling in the 1st bathroom from north located at apt 2, 1st story, 2nd apartment from south at west
Jun 5, 2026 · Apt 2
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2, 1st story, 2nd apartment from south at west
Jun 5, 2026 · Apt 2
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2, 1st story, 2nd apartment from south at west
Jun 5, 2026 · Apt 2
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2, 1st story, 2nd apartment from south at west
Jun 5, 2026 · Apt 2
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling ceiling in the 4th room from north located at apt 2, 1st story, 2nd apartment from south at west
Jun 5, 2026 · Apt 2
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 16, 2023
Closed — Violation dismissed - CImmediately hazardous
Abate the nuisance consisting of excessive storage of material ..personal items and refuse preventing access to fire escape window in the 1st room from north located at apt 12, 3rd story, 1st apartment from south at west
Feb 1, 2023 · Apt 12
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at bulkhead
Feb 1, 2023
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing consisting of hook and eye latch installed at vestibule door, 1st story
Feb 1, 2023
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of hook and eye latch installed at building entrance door
Feb 1, 2023
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ...
Feb 1, 2023
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at east wall at bulkhead , 5th story
Mar 28, 2022
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall at bulkhead , 5th story
Mar 28, 2022
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
Mar 28, 2022
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of excessive storage of material .... personal items, garbage covering entire floor in the entire apartment located at apt 12, 3rd story, 1st apartment from south at west
Mar 21, 2022 · Apt 12
Open — Not complied with - BHazardous
Remove all encumbrances consisting of ....personal items, garbage preventing access to fire escape window at south wall ... in the 2nd room from north located at apt 12, 3rd story, 1st apartment from south at west
Mar 21, 2022 · Apt 12
Open — Not complied with - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 1st story
Nov 30, 2020
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at east wall and ceiling at public hall, 1st story
Nov 30, 2020
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and east at public hall, 1st story
Nov 30, 2020
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at the ceiling and east wall at public hall, 1st story
Nov 30, 2020
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 26, 2016
Closed — Violation dismissed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration cellar front windows now blocked up by cement block.
Oct 13, 1995
Closed — Violation closed - BHazardous
D26-10.01 adm code provide window or vent for kitchenette 1 sty front west apt 2. located at apt 2
Oct 13, 1995 · Apt 2
Open — Not complied with - ANon-hazardous
Discontunue unlawful use of kitchen for sleeping purposes 3 sty southwest apt 12. located at apt 12
Oct 13, 1995 · Apt 12
Closed — Violation closed - CImmediately hazardous
Remove all obstructions and repair all defects in wasteline sink kitchenette 5 sty northeast apt 17 er1. , section '' ''
Oct 13, 1995 · Apt 17
Open — First no access to re- inspect violation - ANon-hazardous
M/d law abate the nuisance consisting of electrical extension cord north wall center room 5 sty northeast apt 17. , section '' ''
Oct 13, 1995 · Apt 17
Open — First no access to re- inspect violation - BHazardous
D26-10.01 adm code provide window or vent for kitchenette 2 sty southwest apt 8. located at apt 8
Oct 13, 1995 · Apt 8
Open — Not complied with
DOB building violations · 1
- Construction other optional
C-construction other optional
Dec 13, 2000
Vw*-violation - work w/o permit dismissed
ECB violations · 1
- Non-hazardous
Work without a permit. work noted: removed gypsum plaster ceiling firerated protection from entir 3"x12" wood blams approx 75 beams. erecting new metal studs partitions to crat rooms without a permit in the cel
Dec 13, 2000 · Penalty $2,500
Resolve
Complaints
- Heat/hot water
Entire building
Jun 4, 2026 · Apt UNIT9
Close - Heat/hot water
Entire building
Jun 4, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 4, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 3, 2026 · Apt 3
Close - Heat/hot water
Entire building
Jun 3, 2026 · Apt 3
Close - Heat/hot water
Entire building
Apr 20, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 21, 2025 · Apt 8
Close - Flooring/stairs
Floor
Nov 19, 2020 · Apt 5
Close - General
Ventilation system
Nov 19, 2020 · Apt 5
Close - Plumbing
Water supply
Nov 19, 2020 · Apt 5
Close
Show 7 more ↓
- Heat/hot water
Entire building
Jan 24, 2016 · Apt 2
Close - Heat/hot water
Apartment only
Jan 10, 2015 · Apt 2
Close - Electric
Lighting
Nov 25, 2012 · Apt 2
Close - Plumbing
Water-leaks
Nov 25, 2012 · Apt 2
Close - Nonconst
Vermin
Jun 23, 2011 · Apt 3
Close - Plumbing
Water supply
Jan 23, 2011 · Apt 8
Close - Nonconst
Vermin
Feb 15, 2005 · Apt 10
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1920
- Floors
- 5
- Residential units
- 20
- Building area
- 7,500 ft²
- Lot area
- 2,241 ft²
- Zoning
- R8
- Community board
- 104
- Council district
- 6
- Block / lot
- 1065 / 41
- Assessed value
- $614,250
- Landmark / historic district
- No
HPD registration #117116, last renewed Jun 18, 2025.
Questions about 412 West 56 Street
Who owns 412 West 56 Street?
The owner of record in NYC Department of City Planning PLUTO data is Uvi Holdings LLC.
Does 412 West 56 Street have violations?
Yes. NYC HPD has recorded 47 housing violations at this property.
Is 412 West 56 Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 30% of its 20 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 412 West 56 Street built?
City records list 1920 as the year it was built.
How many apartments are in 412 West 56 Street?
It has 20 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.