287 3 Avenue
Manhattan, NY 10010BBL 1-00903-0003Map
Owner of record: Tempo Properties LLC
287 3 Avenue is a mixed residential and retail building built in 1910 in Manhattan, 10010. It has 6 residential units across 4 floors. The owner of record is Tempo Properties LLC. HPD has recorded 6 housing violations here, most recently on April 17, 2013. 5 of the 6 most recent violations are still open. City tax records listed 2 rent-stabilized apartments here in 2024.
- HPD violations
- 6
- DOB violations
- 9
- ECB violations
- 5
- HPD complaints
- 9
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 6
- ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall
Apr 17, 2013
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items in cellar at boiler room
Aug 10, 2010
Open — Nov certified late - BHazardous
Remove all encumbrances consisting of household items at 4th sty public hall
Aug 10, 2010
Open — Nov certified late - BHazardous
D26-10.01 adm code properly repair with similar material the broken or defective ceiling & walls leading to cellar from restaurant.
May 27, 1982
Open — Not complied with - BHazardous
D26-10.01 adm code properly repair with similar material the broken or defective clg of cellar thru out.
May 27, 1982
Open — Not complied with - BHazardous
D26-10.01 adm code properly repair the broken or defective locking device 4 sty rear apt 4r entrance door. , section '' ''
Mar 27, 1981 · Apt 4R
Open — Second no access to re-inspect violation
DOB building violations · 9
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 16, 1997
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Apr 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed - Construction other optional
C-construction other optional
May 27, 1992
Dob violation - active
ECB violations · 5
- Class - 2
B254,21b,48a,50a,b. 50a- defective flue pipe w/separating seams. 50b- inadequate fresh air intake @ enclosed boiler room. correct all defects to comply w/nyc codes. file c/c w/dob. (weil mclain ci boiler).
Aug 2, 2013
Resolve - Class - 3
B354.15.16.34b.50a.50b.50c.50d.50e 50a hole on boiler rm doo rmust be sealed 50b check valve required to be between backflow preventor and where feed goes into return 50c remove band iron on smoke pipe replacin
Aug 26, 2009 · Penalty $200
Resolve - Non-hazardous
Work w/o a permit : work noted at roof top level at northwest corner ¢er. vent pipe for restaurant has been installed with 9" pipe & motorizes difuser & in a pigy back fashion also on top of a smaller flexi
Mar 30, 2004
Resolve - Non-hazardous
Installation of air conditioning unit before obtaining an equipment use or equipment work permit. in that an air conditioning unit in excess of 2 ton capacity has been installed to provide air conditioning for
Aug 14, 1997
Resolve - Non-hazardous
B5c 27-185 installation of ait conditon equipment without firest obtaining an equipemnt use perit or equipment work permit in that a 7 ton air conditioning unit air temp amana has been installec on roof to supp
Mar 24, 1997
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Feb 3, 2022 · Apt BLDG
Close - Heating
Heat related
Jan 9, 2014 · Apt NA
Close - Heating
Heat related
May 20, 2013 · Apt 4F
Close - Nonconst
Janitor/super
Feb 28, 2013 · Apt 2R
Close - Heating
Heat related
Jan 8, 2013 · Apt 2R
Close - Heating
Heat related
Aug 5, 2009 · Apt BLDG
Close - Plumbing
Water supply
May 30, 2009 · Apt 3R
Close - Appliance
Sprinker cert
Jul 26, 2004
Close - Plumbing
Water supply
Jun 16, 2003 · Apt BLDG
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Mar 26, 2026 | $1,980,000 | Rentals - 4-10 unit | 7 |
Building details
- Building type
- Mixed residential and retail building (S5)
- Year built
- 1910
- Floors
- 4
- Residential units
- 6
- Building area
- 5,468 ft²
- Lot area
- 1,575 ft²
- Zoning
- C2-8A
- Community board
- 106
- Council district
- 2
- Block / lot
- 903 / 3
- Assessed value
- $1,397,250
- Landmark / historic district
- No
HPD registration #137515, last renewed Sep 8, 2025.
Questions about 287 3 Avenue
Who owns 287 3 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Tempo Properties LLC.
Does 287 3 Avenue have violations?
Yes. NYC HPD has recorded 6 housing violations at this property.
Is 287 3 Avenue rent stabilized?
NYC Department of Finance tax bills listed 2 rent-stabilized units here in 2024 (about 33% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 287 3 Avenue built?
City records list 1910 as the year it was built.
How many apartments are in 287 3 Avenue?
It has 6 residential units and 7 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.