roofy

250 West 34 Street

Manhattan, NY 10001BBL 1-00783-0070Map

Owner of record: Korpenn LLC

250 West 34 Street is an office building built in 1972 in Manhattan, 10001. The owner of record is Korpenn LLC. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
611
ECB violations
162
HPD complaints
2

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 611

  • Construction other optional

    Borough commissioner stop work order application m01193176-i1 due to applicant withdrawal.

    Aug 20, 2026

    Dob violation - active
  • Construction other optional

    Borough commissioner stop work order application m01193178-i1 due to applicant withdrawal.

    Aug 20, 2026

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9c technical report by 2/21/2024

    Feb 22, 2024

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 30, 2022

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 18, 2021

    Dob violation - dismissed
  • Construction other optional

    Damaged observed to the cmu block wall at level 8 of underground parki ng garage due to a water main break in the street

    Aug 8, 2021

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 10, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 10, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 10, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 10, 2021

    Dob violation - resolved
Show 40 more ↓
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 17, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 25, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 25, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 25, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 22, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 22, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 22, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 22, 2020

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Sprinkler none

    Failed to file final sprinkler report by july 1, 2019

    Sep 3, 2019

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator - failure to file category 1 2017 inspection/test

    Apr 5, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 6, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 6, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 6, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 6, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 10, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 10, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 10, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 10, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 9, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 6, 2018

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed

ECB violations · 162

  • Class - 2

    Failure to submit an acceptable required cycle 9c report critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #901670. remedy: submit acceptable require

    Apr 8, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    28-323.1. failure to maintain parking structure insafe condition. noted at time of inspection on an occupied parking structure consisting of9 level ground, cellar, sub-cellar below 57 story building. qpsi filed

    Feb 14, 2025 · Penalty $1,250

    Resolve
  • Class - 2

    I observed unsafe/unsuitable conditions in electrical closets (b) located on 16 flr and 17 flr open panels (208v and 277v), shorts extension cords coming out of the panels being used for temporary connections,

    Sep 18, 2024

    Resolve
  • Class - 2

    57 story building,i observed active use of outrigger susp. scaffold at exp3, with equipment installed on 55fl. upon closer inspection, i discovered outrigger tieback does not conform to plans(no tied from the f

    Sep 20, 2023

    Resolve
  • Class - 2

    At time of inspection observed a construction fence around parking garage and public plaza, upon review of departmental records to show compliance, which revealed the temporary construction equipment, construct

    May 6, 2023

    Resolve
  • Class - 1

    At the time of inspection i observed installation of window panels taking place on the 28th floor under app# 123511903. upon request for ssp & ssm none was provided or available. pw1 was changed in which waiver

    Jun 6, 2022 · Penalty $625

    Resolve
  • Class - 1

    Observed installtion of window panels @28th floor perimeter edge with inadequate guardrails in place constructed of metal studs contrary to fall protection plan and bc 3308.7 creating an unsafe fall hazard, pro

    Jun 6, 2022 · Penalty $2,500

    Resolve
  • Class - 2

    At the time of inspection i observed installtion of window panels @28th floor perimeter edge under app # 123511903 with no vaild ahv permit for mention job#, obtain after hours variance; stop all after hours wo

    Jun 6, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to provide approved plans at site.at time of inspection on active jobsite of exisitng 57 story building observed work in progress under alt 1 #123821454.lobby renovation and facade alteration work.reque

    Dec 29, 2021

    Resolve
  • Class - 1

    Documents to be kept at site.at time of inspection of active jobsite observed suspended scaffold-outrigger beams installed and in operations.request for installation and pre-installation inspection report for s

    Dec 29, 2021 · Penalty $625

    Resolve
Show 40 more ↓
  • Class - 2

    Jobsite fence not constructed or maintained pursuant to subsection.at time of inspection of active jobsite observed construction fence erected at exrosures under permit #m0033376p expires 9/23/22.fence not pain

    Dec 29, 2021 · Penalty $500

    Resolve
  • Class - 1

    1rcny104-20(k) certificate of fitness for suspended scaffold user.at time of inspection of active jobsite observed suspended scaffold installed and in operation with workers jose gonzalez,rolando garcia,pavel l

    Dec 29, 2021 · Penalty $6,250

    Resolve
  • Class - 2

    Expired permit(cd5)for suspended scaffold.at time of inspection of active jobsite observed suspended scaffold installed and in operation outrigger beams have been inspected by nail adzemoric(osp)and is safe for

    Dec 29, 2021

    Resolve
  • Class - 1

    Inadequate site safety plan(ssp)at time of inspection on an active jobsite observed suspended scaffold-outrigger beams installed and in operation.site safety plan does not indicate suspended scaffold-outrigger

    Dec 29, 2021 · Penalty $625

    Resolve
  • Class - 2

    Failure to safeguard all persons&property affected by const ops.note:atoi of 57styaltb,work in progress.i observed that contractor failed tosafeguard workers from slipping,tripping,&falling conditions as protec

    Nov 12, 2021 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to safeguard all persons and property affected by constructionoperation.at time of inspection it was observed that safety unit(2 by 6)fall from the 3rd floor during window operation and hit a worker at

    Oct 29, 2021

    Resolve
  • Class - 1

    Failure to provide sidewalk shed where required.note at time of inspection responding to a complaint where a member of the public was hurt. when during window replacement on the south east corner of the 3rd fl.

    Oct 29, 2021

    Resolve
  • Class - 1

    Failure to safeguard all public & property affected by construction operations.note:at time of inspection responding to a complaint where a member of the public was hurt.when during window replacement on the ea

    Oct 29, 2021 · Penalty $5,000

    Resolve
  • Class - 1

    I observed in cellar gas meter room gas meter removed and plug installed which created a future gas connection on main gas line at time of inspection which is prohibited and not code complaint, repair and/repla

    Oct 18, 2021

    Resolve
  • Class - 1

    I observed in gas meter room in cellar gas meter area removed and gas line on distribution side plugged with new fresh sealant and work was performed 100% at time of inspection, obtain permit

    Oct 18, 2021

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons/violation#39041232k issued on 05/17/21 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.remedy:comply with commis

    Jun 24, 2021 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to safeguard all persons and property affected by const. operations. fire rated materials (cmu) removed to create access point to mech shaft 'b' located on column line g7, floors sub-cl 2 thru 3rd fl wi

    May 17, 2021 · Penalty $10,000

    Resolve
  • Class - 1

    Failure to notufy the department of an accident/incidnet that resulted in a fatlity or an injury a worker suffered cut his arm while performing duct work the worker went to an urgent care center for treatment a

    Nov 20, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to institute and maintain safety measures. at time of comp inspections at 58 story commercial building i observed approx 12 broken windows. failure to adhere to high wind warnings and properly secure su

    Nov 16, 2020 · Penalty $5,000

    Resolve
  • Class - 2

    Failure to safeguard all persosn and property affecte dby construction operation note at time of my inspection of a 57 story building under alt permit and installation curtain wall in response to an incident

    Sep 2, 2020 · Penalty $5,000

    Resolve
  • Class - 1

    Bc3301.8.1-tampering with evidence note at the time of my inspectionof a 57 story building under an alt permit installing glass curtain wallin response to an incidet that took place on 9-01-2020 a worker moving

    Sep 2, 2020 · Penalty $625

    Resolve
  • Class - 1

    Failure to notify the department immediately of an incident prompty note at tim eo finspetcion of a 57 story nuilding under alt permit with installation of glass curtain wall on going in response to an incident

    Sep 2, 2020 · Penalty $5,000

    Resolve
  • Class - 1

    Failure to communicate required information to workers during pre shift safety meeting note at the time of my inspection of a 57 story building under an alt permit installing of a glass curtain wall in response

    Sep 2, 2020

    Resolve
  • Class - 1

    Site safety manager failed to immediately notify the department of an incident note at time of my inspection of a 57 stories building under alt permit with installation of glass curtain walls on going in respon

    Sep 2, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to notify the department of an accident or incident that resulted in a fatality or injury a worker was oeprating operating a corded drill when he injured his back worker was taken to hospital as per a c

    Jan 7, 2020 · Penalty $5,000

    Resolve
  • Class - 2

    27-929.1 a.c. 27-929.1,failure to complete the installation of a full system of automatic sprinklers and file a final sprinkler report prepared by a registered design professional by 7/1/19,in an office buildin

    Nov 15, 2019 · Penalty $620

    Resolve
  • Class - 1

    Prohibited outdoor advertising company sign on sidewalk shed. at the time of my inspection it was observed a sws installed at exposure 1,2,3,4 where it was noted that advertising signs were erected on sws parap

    Nov 8, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    86i11cu; 89i11cu; 99b1cu; 100i10cu. 86i11-cease use 2 or more comb teeth in a row broken; 89i11-cease use multiple steps broken; 88b1-cease use lh handrail pinch point at top of unit. 100i10-cease use lh inlet

    Dec 29, 2018 · Penalty $1,280

    Resolve
  • Class - 2

    86i11,99bb5,87b6. 86i11 - replace multiple broken combs top and bott om; 87b6-secure landing pale; 99bb5-expired cat1 tag

    Dec 29, 2018 · Penalty $655

    Resolve
  • Class - 2

    86i11,99bb5,87b6

    Dec 29, 2018 · Penalty $625

    Resolve
  • Class - 1

    Cu89i11,92b11cu,86i11. 89i11-cease use. multiple broken steps; 92b11 cease use screws in decking not flush causing snag point; 86i11-damaged combteeth.

    Dec 29, 2018 · Penalty $1,280

    Resolve
  • Class - 1

    Cu93m07-ceiling intersection guard missing/provide.

    Dec 29, 2018 · Penalty $1,280

    Resolve
  • Class - 1

    Cu92m07 glass balastrade missing from lower left provide.

    Dec 29, 2018 · Penalty $1,280

    Resolve
  • Class - 2

    Zr37-73/violation of condition as of right privately owned public space open air cafe non compliant.as per nyc zoning resolution chapter(7)section 37-73(b)where open air cafe is provided it shall be permanently

    Dec 28, 2017 · Penalty $4,000

    Resolve
  • Class - 2

    Zr37-73/violation of conditions as of right privately owned public space open air cafe non compliant.as per nyc zoning resolution chapter(7)section 37-73.where open aircafe is provided it"shall be"permanently u

    Dec 28, 2017

    Resolve
  • Class - 2

    Work without a permit.time of inspection i observed (4)four business accessory signs.(2)illuminated signs structure approx size 4'x 12' copyon sign "park icon".(2)illuminated sign strucures approx size 5'x8"cop

    Dec 28, 2017 · Penalty $800

    Resolve
  • Class - 2

    Zr27-741/violation of condition as of right privately owned public space plaza seating non compliant.nyc zoning resolution 37-741 device or forms affixed or incorporated into planter edges that would otherwise

    Dec 28, 2017

    Resolve
  • Class - 2

    Zr37-77/violation of condition as of right privately owned public space general maintenance non compliant.nyc zoning resolution 37-77 building owner shall be responsible for the maintenance of public plaza.at t

    Dec 28, 2017 · Penalty $4,000

    Resolve
  • Class - 3

    Failure to maintain buildin gin code compliant manner.noted:at time of inspection obsreved missing handrails at the steps at front entrance to the building25.remedy:repair and replace

    Jun 21, 2017

    Resolve
  • Class - 2

    89h11,86i11. 89h11-replace worn steps; 89i11-replace comb plates bottom.

    Nov 7, 2015 · Penalty $1,250

    Resolve
  • Class - 2

    01l10,86i10. 01l10- repair bottom alarm; 86i10-replace bototm combs.

    Nov 7, 2015 · Penalty $500

    Resolve
  • Class - 3

    91l10 repair defective top stop switch buzzer

    Nov 7, 2015 · Penalty $200

    Resolve
  • Class - 2

    97x10 upon inspection device #1e,20022 was out of service. rmdy:returnto service immediately.

    Nov 7, 2015 · Penalty $500

    Resolve
  • Class - 2

    97l10, 92d06. 97-return to service; 92-properly secure left decking.

    Nov 7, 2015 · Penalty $500

    Resolve
  • Class - 2

    91m07,86i11. 91-top stop switch cover missing; 86-top comb broken teeh.

    Nov 7, 2015 · Penalty $500

    Resolve

Complaints

  • Plumbing

    Steam pipe/riser

    Jan 21, 2026 · Apt C108

    Close
  • Heat/hot water

    Entire building

    Dec 9, 2025 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Office building (O4)
Year built
1972
Floors
57
Residential units
—
Building area
2,689,635 ft²
Lot area
127,966 ft²
Zoning
C6-4
Community board
105
Council district
3
Block / lot
783 / 70
Assessed value
$437,083,650
Landmark / historic district
No

Questions about 250 West 34 Street

Who owns 250 West 34 Street?

The owner of record in NYC Department of City Planning PLUTO data is Korpenn LLC.

Does 250 West 34 Street have violations?

NYC HPD has no housing violations on record for this property.

Is 250 West 34 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 250 West 34 Street built?

City records list 1972 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.