254 West 35 Street
Manhattan, NY 10001BBL 1-00784-0071Map
Owner of record: 254 West 35 Holdings LLC
254 West 35 Street is a factory / industrial built in 1924 in Manhattan, 10001. The owner of record is 254 West 35 Holdings LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 373
- ECB violations
- 114
- HPD complaints
- 2
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 373
- High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - active
Show 40 more ↓
- High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 external hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2024 internal hgh pressure inspection
Nov 14, 2025
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 internal hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - active - High pressure boiler boiler required
Violation issued-failure to file 2023 external hgh pressure inspection
Sep 23, 2024
Dob violation - active - Failure to correct swarmp conditions (facade) facade required
Failure to correct swarmp conditions
Aug 1, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 17, 2024
Dob violation - dismissed - Hazardous condition (facade) facade required
Cycle 9a unsafe report filed
Jan 16, 2024
Dob violation - active - Construction other optional
Emergency work order,due to the large sperate step crack at parapet level of exposure#1(north),facade on west 35th street.remedy:make imme immed.repairs under the supervision of licensed professional remove secure all loose materials,as per 1rcny 103-04
Nov 28, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed
ECB violations · 114
- Class - 2
At time of inspection observed inadequate fire extinguisher on entire site. on active construction site all extinguishers are store on floor contrary to fire code. also observed extinguishers with expired tags
Jul 8, 2026 · Penalty $625
Resolve - Class - 2
At time of inspection observed active construction activities. upon requesting construction super logs competent person was unable to provide logs. no records of any visit to site was provided, multiple hazardo
Jul 8, 2026 · Penalty $5,000
Resolve - Class - 2
At time of inspection observed active construction activities. upon requesting documents to competent person multiple documents were not provided. sidewalk shed drawings, initial installation drawings, daily in
Jul 8, 2026 · Penalty $1,250
Resolve - Class - 1
At time of inspection on a 16 story building observed active construction activities on all floors. failure to maintain standpipe in state of readiness. on second floor observed standpipe cut off. no fdny lette
Jul 8, 2026 · Penalty $5,000
Resolve - Class - 2
At time of inspection observed active construction site. notice on multiple floors inadequate lighting on hallway, stairs and rooms. observed workers using phone lighting to be able to work. hazardous condition
Jul 8, 2026 · Penalty $2,500
Resolve - Class - 2
Failure to file acceptable amended cycle 9a report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #901680. remedy: file acceptable report.
Apr 20, 2026 · Penalty $1,250
Active - Class - 2
At the time of inspection, i observed sidewalk shed for facade repairs and pedestrian protection at 254 west 35th street installed without a permit upon reviewing the department system records indicate no permi
Jan 2, 2024 · Penalty $625
Resolve - Class - 1
Failure to maintain exterior building facade and appurtenances. note: observed at time of inspection large separated step crack on parapet level of exposure #1(north). also observed broken glass on the 3rd floo
Nov 28, 2023 · Penalty $1,250
Active - Class - 2
Failure to maintain exterior building facade and appurtenances. noted at time of inspection north elevation exposure#1(w 35th st) loose and broken glass in 3rd fl windows due to recent fire. remedy:maintain ext
Apr 21, 2023 · Penalty $1,250
Active - Class - 1
On 17th floor erected full height partition wall to create illegal occupancy as driving school, class room & office facilities without a permit. also sidewalk shed erected on expo # 01 and no active permit on f
Apr 20, 2023 · Penalty $2,500
Active
Show 40 more ↓
- Class - 1
Emergency exit from cellar to street on stairwell a sealed with metal gate, padlocks & nailed down at grade level & 6th floor exit door. also observed 7th, 9th, 10th 11th and 17th floor exit door partially obst
Apr 20, 2023 · Penalty $1,250
Active - Class - 1
Failure to maintain issues: cellar level wall & ceiling stucco cracks, missing and disrepair. all exit stairwell doors on a & b damaged and disrepair bulkhead skylight metal rotten & loose., repair and/replace
Apr 20, 2023 · Penalty $1,250
Active - Class - 1
Observed prohibited hardware key operable locks & latches erected on emergency exit door on lobby level and mezzanine level between 1st & 2nd floor., provide legal hardware
Apr 20, 2023 · Penalty $1,250
Active - Class - 1
Occupancy contrary to permitted document on 17th floor. building occupancy recorded as garments manufacturing business but half of 17th floor occupied as driving school, class room & office facilities which con
Apr 20, 2023
Resolve - Class - 1
Failure to maintain building exterior walls facade and appurtenances. observed at exp1 north elevation cracked window pane at multiple locations,corrosion of metal 1 floor.eroded mortar joints and damaged facad
Feb 2, 2023 · Penalty $2,500
Active - Class - 2
Failure to submit acceptable required cycle 9a report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control #901680.remedy:submit acceptable required te
Dec 9, 2022 · Penalty $1,250
Active - Class - 2
Class 2: 5.j.1 car door gate hitting locks while traveling causing possible entrapments. adjust car to proper clearance. 25.m.7 fire signage missing in lobby. provide required signage at every floor landing. 24
Nov 16, 2022 · Penalty $1,562
Resolve - Class - 1
Class 1 restore to service for proper inspection by
Feb 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/the commissioner's order contained in summons/violation #35581729k issued on 9/15/21 & to file a certificate of correction pursuant to 28-201.1 & 1rcny 102-01.remedy:comply w/commissioner's
Jan 21, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/the commissioner's order contained in summons/violation #35581729k issued on 9/15/21 & to file a certificate of corrections pursuant to 28-201.1 & 1rcny 102-01.no c/of/c on file.remedy:compl
Nov 10, 2021 · Penalty $3,125
Resolve - Class - 1
Failure to provide unobstructed exit passageway.as noted:at time of inspection at main lobby observed two glass doors chained and padlocked partially obstructing exit passageway.remedy:remove obstruction.make s
Sep 15, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to comply w/the comm's order to file a cert of correction w/the dept of bldgs for violating conditions cited in nov#35405894l issued03/29/19 pursuant to 28-201.2;28-204.4;1rcny 102.01. remedy: file cert
Aug 19, 2021 · Penalty $6,250
Active - Class - 2
Unapproved/unsafe/unsuitable electrical equipment apparatus materials devices appliances or wiring in use.throughout suite 11b loose exposedunsecured unprotected wires open boxes and ungrounded fixtures.rem:com
Feb 24, 2021 · Penalty $800
Active - Class - 2
Failure to comply w/commissioner's order contained in summons/v#35365811n issued11/21/19&to file cert of correction pursuant to28.201.1&1rcny102-01d2.acceptible cert hasn't yet been filed despite respondent ent
Feb 3, 2021 · Penalty $1,250
Resolve - Class - 2
Restore device to service.
Dec 28, 2020 · Penalty $625
Resolve - Class - 2
Restore device to service.
Dec 28, 2020 · Penalty $625
Resolve - Class - 1
Cease use 21-r-10, 100-m-07, 59-m-7. 21-r-10 hoistway foor locks illegally jumped out @can taller along the elvator to run with the hoistwaydoor open cause a hazardous conditions repair*contact dob elevator ir
Dec 3, 2019 · Penalty $1,250
Resolve - Class - 1
Cease use 21-r-10, 2-x-10, 1-x-11, 2-m-7, 98-m-7, 100-m-7, 61-m-7. 21-r-10 hoistway(clan) interlocks illegally jumped out @cellar controllercause a hazardous conditions by allowing elevator to
Dec 3, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to maintain exterior building facade and appurtenances.note:exposure 1 north elevation 9th floor,center right window missing,replaced with plywood & fan.note:exposure #3 south elevation multiple levels
Nov 21, 2019 · Penalty $1,250
Active - Class - 2
Failure to maintain bld. in code compliant manner.at 12th fl,stairway a&b,install/use of prohibited hardware per bc 1008.1.8,27-311.having installed deadbolt lock @stairway a & "shed bar"@ stairway b.rem:provid
Mar 29, 2019 · Penalty $312
Resolve - Class - 1
Occupancy contrary to that allowed by the d.o.b records.now at 12th flsuite"a"converted/used as a house of prostitution having up to 3 ro oms & 1 sleeping quarters.rem:discontinue illegal occupancy.
Mar 29, 2019
Resolve - Class - 2
Work w/o a permit.work noted:suite "a' at 12th floor.,installed water & waste lines to create 3 pc bathroom electrical & plumbing work performed to install hwh.rem:obtain permits
Mar 29, 2019 · Penalty $1,250
Active - Class - 2
Pedestrian protection does not meet code specification.note:@ time of inspection i observed (1) bracing to the sidewalk shed was missing.(2)bracing to the side walk shed was not connected & hanging on the fl(3)
Oct 25, 2018 · Penalty $2,400
Resolve - Class - 2
Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control#801680. remedy: submit required technical report
May 18, 2018 · Penalty $1,250
Resolve - Class - 2
36,b254. pacific steam, 23kw,electric high pressure steam supply boiler, nb12351, built 2012. 36-reference boiler was installed and made operational at the stated place of occurrence w/o being registerd on the
Apr 13, 2016 · Penalty $500
Active - Class - 2
36,b254. fulton, v.t. boiler,10hp,high pressure steam boiler nb67908,built 1992. 36-reference boiler was found in operation on the 4th floorof premises. the boiler is not registered on the dob database.the resp
Apr 13, 2016 · Penalty $500
Active - Class - 2
36,b254 pacific steam, 18 kw,electric high pressure steam boiler, nb10497, built 2007: referenced boiler was found in operation on the 3rd flr or the premises. the boiler is not registered on the dept of bldgs
Apr 13, 2016 · Penalty $530
Active - Class - 2
36, b254. fulton v.t. boiler, 15hp;high pressure steam boiler, nb71195,gas-fired, built 1991: 36-referenced boiler was found in operation onthe 16th flr of the premises. the boiler is not registered on the dept
Apr 13, 2016 · Penalty $500
Active - Class - 1
Failure to maintain building in code compliant manner. at the time of my inspection at 10:43am at the above address and date i observed on the 12th floor the installation of a gas fired commercial food steamer
Apr 11, 2016 · Penalty $1,000
Resolve - Class - 1
3a,50a,5a,b154. fulton v.t. boiler, 20hp, nb69679, hp sm,gas fd, 199431-corroded section of side vent flue pipe of the referenced boiler with overhang on 35th street sidewalk. potential collapse hazard; 50a
Apr 11, 2016 · Penalty $1,000
Resolve - Class - 1
Failure to maintain bldg in code-compliant manner(prohibited material)at the time of my inspection at 10:43am at the above address and date i observed on the 12th floor installation of union and gas valve of ma
Apr 11, 2016 · Penalty $1,000
Resolve - Class - 1
Work w/o s permit. on the above date at 11:00am i observed the installation of one commercial food steamer and associated gas/water piping. (all work on 12th flr). utility locked gas valve. rmdy: obtain all req
Apr 11, 2016 · Penalty $800
Resolve - Class - 2
36,b254 fulton v.t. boiler, 15hp, nb60532, hp steam, gas fd, 1990(36)referenced boiler was moved from 335 west 35 st 4th floor and install ed at 254 west 35 st 11th floor. boiler not registered on dob database
Apr 11, 2016 · Penalty $500
Active - Class - 2
50a,50b50c. fulton v.t. boiler, 6hp,nb77470,hpsm, gas fired, 1996; 50a-high ambient temperature in boiler room. mechanical fan not working.repair fan; 50b-spill switchn missing; 50c-excessive furnace cement at
Apr 11, 2016 · Penalty $500
Active - Class - 1
Failure to have new or altered plumbing system tested. at the time of my inspection at 10:43 am at the above address and date i observed onthe 12th flr the installation of gas piping feeding gas fired steamer
Apr 11, 2016 · Penalty $1,000
Resolve - Class - 2
Failure to file an acceptable 6 round tech report in compliance w/ code provisions:periodic inspec of exterior walls & appurtenances as required by article 28.302 & the dept of bldgs rules & regulations 3601580
Dec 15, 2011 · Penalty $800
Resolve - Class - 2
69m07 22j01 21i10 79b07 100m07 100m07 69code data plate 22-adjust parking device not consistently locking away from floor 21-locking bar on 4th fl 79-provide 5" for comp chain under car #18 coines are insuffici
Aug 12, 2010 · Penalty $250
Resolve - Class - 2
3303.7.2)failure to provide fire extinguishers.upon inspection as noted on active construction site,there are no fire extinguishers on the 16th & 17th flrs where equipment & material has been set up for alterat
Aug 3, 2010 · Penalty $800
Resolve - Class - 2
Smoking @ construction/demolition site.upon inspection as noted on active construction site there was smoking refuse on 16th & 17th flr being used by construction workers for staging equipment & materials being
Aug 3, 2010 · Penalty $1,200
Resolve - Class - 2
Failure to file an accpetable sixth round technical report in compliance w/ code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & d.o.b. rules & regulations. rem
Apr 28, 2010 · Penalty $8,000
Resolve
Complaints
- Plumbing
Water supply
Jul 14, 2022 · Apt BLDG
Close - Heating
Heat related
Jan 2, 2004 · Apt BLDG
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Feb 2, 2026 | $26,219,000 | Factories | 14 |
Building details
- Building type
- Factory / industrial (F5)
- Year built
- 1924
- Floors
- 16
- Residential units
- —
- Building area
- 106,642 ft²
- Lot area
- 7,406 ft²
- Zoning
- M1-9A/R12
- Community board
- 105
- Council district
- 3
- Block / lot
- 784 / 71
- Assessed value
- $8,082,000
- Landmark / historic district
- No
Questions about 254 West 35 Street
Who owns 254 West 35 Street?
The owner of record in NYC Department of City Planning PLUTO data is 254 West 35 Holdings LLC.
Does 254 West 35 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 254 West 35 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 254 West 35 Street built?
City records list 1924 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.