255 West 34 Street
Manhattan, NY 10001BBL 1-00784-0012Map
Owner of record: Penn District Hotel LLC
255 West 34 Street is a hotel built in 2021 in Manhattan, 10001. The owner of record is Penn District Hotel LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 49
- ECB violations
- 103
- HPD complaints
- 3
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 49
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - dismissed - Construction other optional
Vio24-50323
Feb 9, 2024
Dob violation - dismissed - Construction other optional
The dob hereby orders you to stop all concrete work under job #112745100 - except to make site safe - due to withdrawal of concrete contractor
Feb 3, 2023
Dob violation - dismissed - Construction other optional
The dob hereby orders you to stop all concrete work under job #112745100 - except to make site safe - due to withdrawal of concrete contractor
Feb 3, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 27, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 27, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 27, 2022
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed - Construction other optional
The department of buildings orders that all work under permit issued i n connection with application #1140602122 stop all work immediateley d ue to applicant withdrawal, stop all work and make site safe remedy: obtain all required documents
Aug 5, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed
Show 39 more ↓
- Construction other optional
C-construction other optional
Jun 21, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 14, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Elevator elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspectio n/test
Jun 10, 2015
Dob violation - active - Elevator elevatorrequired
Violation issued to elevator-failure to file category 1 2013 inspectio n/test
Oct 31, 2014
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2013 inspection/test
Oct 31, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 24, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 24, 2014
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspectio n/test
Mar 31, 2014
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 8, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 3, 2012
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 4, 2011
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 3, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 3, 2010
Dob violation - active - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 27, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 25, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 28, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 9, 2007
Dob violation - resolved - Construction other optional
C-construction other optional
Jul 7, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 13, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 17, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 16, 2003
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 19, 2002
Dob violation - dismissed - Zoning none
Z-zoning none
Jul 27, 2001
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 27, 2001
Dob violation - dismissed - Construction other optional
C-construction other optional
Jan 30, 1997
Vpw-violation unserved ecb-work without permit-active - Construction other optional
C-construction other optional
Jan 30, 1997
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 8, 1996
Dob violation - dismissed - Zoning none
Z-zoning none
Aug 21, 1995
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 17, 1995
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 24, 1994
Vp*-violation unserved ecb- dismissed - Elevator elevatoroptional
1
Jun 28, 1993
Dob violation - dismissed - Zoning none
Z-zoning none
Jan 4, 1993
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 14, 1992
Vp*-violation unserved ecb- dismissed - Boiler boiler optional
32/20b remove all rags and combustibles from boiler room-chimney cleanout door missing-replace door and clean chimney
Apr 19, 1990
Vp*-violation unserved ecb- dismissed
ECB violations · 103
- Class - 2
At time of inspection observed 4 active suspended scaffolds at exposure 1 and 3. upon reviewing altrex suspended scaffolds manufactures specifications it shows that platforms 6 meter and below shall not have ca
Sep 3, 2026 · Penalty $1,250
Resolve - Class - 2
Upon reviewing approve plans notice work not conforming to setup. detail use for delta outrigger beams shows cable truss label as main tension wire rope to be install. none of this setups have tension wire inst
Sep 3, 2026
Resolve - Class - 2
At time of inspection observed 4 active suspended scaffolds. upon inspecting setup observed a frames installed some with wheels and others with screw jacks. i request to see the manufacture specs for this frame
Sep 3, 2026 · Penalty $1,250
Resolve - Class - 2
At time of inspection observed active suspended scaffolds at exp. 1 and 3. upon requesting rigging foreman card to dennis fernando vizuete who introduce himself as the foreman he could not produce the card. sc
Sep 3, 2026 · Penalty $1,250
Active - Class - 2
At time of inspection observed 5 suspended scaffolds setups at exp. 1 and 3, 4 of them active. as per dob records last notification was m01292613-i1 8739 created on 5-28-26 which is for the removal of scaffolds
Sep 3, 2026 · Penalty $5,000
Active - Class - 2
Observed suspended scaffold/outrigger installation nonconforming to approved cd5. tiebacks improperly attached to dunnage, grill/catwalk andparapet clamps. parapet clamps not installed perpendicular to building
May 16, 2026
Resolve - Class - 1
3314.10.11 at time of inspection, suspended scaffold at exposure #1 observed not in use and not lowered to ground or deck as required. scaffold left parked at 33,fl roof deck. no details provided to demonstrate
May 16, 2026 · Penalty $5,000
Resolve - Class - 2
3301.7 observed suspended scaffold platform assembled contrary to manufacturer specifications/design requirements. altrex platform configuration and guardrail setup not verified by approved manufacturer data. r
May 16, 2026 · Penalty $1,250
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirement. as noted: at time of inspection at a jobsite of a proposed 36 story building already at the bulkhead level. observed from the 1st floor exposur
May 14, 2026 · Penalty $2,500
Resolve - Class - 2
3309.10/3309.13 35 story nb active site work contrary to ssp onsite.observed work on roof & unfinished exterior work with suspended scaffolds parked on adjoining property roof attached wire ropes. overhead was
Mar 3, 2026
Resolve
Show 40 more ↓
- Class - 1
35 story new building active site.observed multiple fall/struck by hazards onsite in multiple floors/locations in equipment rooms/elevator shafts & 1 fl mezzanines. no/missing or inadequate guardrails/mid rails
Mar 3, 2026 · Penalty $5,000
Resolve - Class - 2
At time of inspection at a 36-story nb building, two workers were observed performing leading-edge work while properly tied off; however, no required controlled access zone was established or maintained. contra
Dec 20, 2025 · Penalty $2,500
Resolve - Class - 2
At time of inspection, a delivery operation was observed with four workers present. construction materials were stored on the sidewalk within the pedestrian walkway, creating an unsafe condition and obstructing
Dec 20, 2025 · Penalty $2,500
Resolve - Class - 2
33 story new building active site with ongoing concrete pour on 27 floor. observed concrete line pump riser in place from street up to 27 floor. on 2,3 floor observed wire ropes attached to line pump riser anch
Apr 30, 2025
Resolve - Class - 2
A proposed 33 story new building active site. active concrete pour of 27 floor. observed no/missing or inadequate protection on street at exp#1 contrary to site safety plans. plans show contractor to provide yo
Apr 30, 2025 · Penalty $625
Resolve - Class - 2
33 story new building active site. ongoing work concrete pour. upon entry to site observed concrete walls partially demolished at cellar & sub cellar level. large pile 50x50 ft of demolition debris not properly
Apr 30, 2025
Resolve - Class - 2
At the time of inspection while responding to a complaint, i observed sidewalk shed installed for pedestrian protection at exposure #1 corner not code compliant. i observed 1 broken panel 2 damage cross braces
Mar 1, 2024 · Penalty $2,430
Resolve - Class - 1
Failure to institute/maintain safety equipment or temporary no toe boards.as noted at time of inspection at an active jobsite for a proposed33 story building at the bulkhead level.observed inadequate guardrails
Feb 2, 2023 · Penalty $5,000
Resolve - Class - 1
Note: at the time of pouring work at 21st floor, worker slipped & fell from a wood ladder on 19th floor, went to hospital. also observed inadequate pre-shift safety meeting content, not communicate about slippi
Sep 14, 2022
Resolve - Class - 1
Note: at the time of pouring work at 21st floor, worker slipped & fell from a wood ladder on 19th floor, went to hospital. inspector rivaled, ssm or gc not notify dob direct hot line or email, they called 311
Sep 14, 2022
Resolve - Class - 1
Note: at the time of pouring work on 21st floor, worker slipped, fell from wood ladder on 19th floor at 06:20 am (09/13/2022), went to hospital. inspector rivaled site safety manager does not notify dob by dire
Sep 14, 2022
Resolve - Class - 1
Note: as per ssm worker slipped from egress ladder when he coming down 21st floor working deck to 20th floor, went hospital. observed no permanent stairs after 16th floor, when they working 21st floor; as per
Aug 30, 2022 · Penalty $6,250
Resolve - Class - 1
Note: as per ssm worker slipped from egress ladder when he coming down 21st floor working deck to 20th floor, went hospital. also observed missing guard rails at stairs open area at 13th floor & more than 5ft e
Aug 30, 2022 · Penalty $12,500
Resolve - Class - 2
Note: as per ssm worker slipped from egress ladder when he coming down 21st floor working deck to 20th floor, went hospital. also observed missing rebar caps at sub cellar level creating hazard of impale when p
Aug 30, 2022 · Penalty $5,000
Resolve - Class - 1
Watchperson. after walking the perimeter of job site for 15 minutes, knocked on fence&entrance door, observed no active work, no workers on site. upon review the department records observed lot area 15,834 sq.f
Apr 21, 2022
Resolve - Class - 1
3309.10 roof protection.at the time of my inspection at a 33 story newbuilding,i observed inadequate roof protection on exp2 and 4 property.ohp shed on exp2 with no loads imposed calculation and count lever on
Apr 19, 2022 · Penalty $2,500
Resolve - Class - 2
3314.3.4 no loads imposed.at the time of my inspection at a 33 story new building,i obsedved on exp2 6 story building support scaffold in place of roof protection.i asked site safety to provide ccdl wavier to u
Apr 19, 2022
Resolve - Class - 1
Failure to file evidence of compliance with worker's compensation insurance.at 33 story new building currently at 16 floor work in progress observed workers working on site for eastland assoc corp review of sys
Apr 11, 2022 · Penalty $5,030
Resolve - Class - 1
Bc 3305.3.6.1.2 failure to secure reshores within 10' of an unenclosedperimeter. as noted:at time of inspection at an active construction site,observed on several floors including 9th fl and mezzanine fl,reshor
Feb 1, 2022 · Penalty $2,500
Resolve - Class - 1
Bc 1905.6.3 failure to remove strength test cylinders stored for a period up to 48 hours. as noted:at time of inspection at an active construction site,building up to 15th fl slab,16th fl deck(unpoured),observe
Feb 1, 2022 · Penalty $625
Resolve - Class - 1
No site specific form work design drawings present per 3301.7.as notedat time of inspection at an active construction site observed floors sub-cellar to fifteenth floor placed.upon request of form work drawings
Jan 27, 2022
Resolve - Class - 2
28-116.2.3,28-105.5 failure to provide an adequate inspection program tr3.as noted at time of inspection at an active construction site,observed a batch concrete ticket for stairs poured the day before stating
Jan 27, 2022
Resolve - Class - 1
Bc 3301.2 failure to maintain adequate safety strap installation log. as noted:at time of inspection at an active construction site,observedconcrete embedded safety straps on floors 1-14(15th fl slab). upon req
Jan 27, 2022
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements.note:at time of inspection of 33 story nb currently at 11 floor level work in progress.i observed a lot of unused construction materials and de
Oct 21, 2021
Resolve - Class - 1
Failed to notify the dept of an incident/accident that resulted in a fatality or an injury. note: a workers ankle was bleeding. the worker was transported to a hospital by an ambulance for treatment. a per chec
Oct 13, 2021
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements.notes:at time of inspection at 33 story new building construction activity in progress observed inadequate housekeeping consisting of large amo
Aug 20, 2021
Resolve - Class - 2
Bc33016-no design drawings for temporary platforms and ladders.at timeof inspection of this proposed 33 story new building,i observed activework currently forming the 6th floor slab.temporary wooden platform bu
Aug 2, 2021
Resolve - Class - 1
Bc 3303.4.7 unsafe storage near sidewalk walkways and pathway-storage material not property protected at exp#1 noted:at time of inspection of a proposed 33 story nb closed jobsite at foundation phase i observed
Jun 2, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to maintain/display on site drawings/docs required by ch33(no design drawing for shoring system)at time of inspepction on an active site of a 33 stry bldg currently at 2nd fl deck,observed temp shoring
Sep 25, 2020 · Penalty $625
Resolve - Class - 2
Bc 3301.6 no design drawing(temporary constraction protectwe sturcture-fence)at time of inspection,i observed an active construction site onfoundation/earthwork phase.upon inspection,it was discovered that the
May 8, 2020
Resolve - Class - 2
Sec. 3304.4.5 design loads for lagging & s.o.e. at time of inspection,observed hydraulic excavator placed at the edge of a sidewalk above anexcavated area supported by wood lagging/soe. soil ramp/(berm)is place
Apr 14, 2020
Resolve - Class - 2
3301.2&27-1009(a) failure to instistute maintain safety equipment measures or temporary construction no guard rails at the tim eof inspection 33 story nbv i observed at the street level no guard rail in front o
Nov 22, 2019
Resolve - Class - 1
Bc-3309.7 failure to provide at least one safe means of egress from excavation.notes:at time of inspection i observed active site for which a ssm is required with inadequate access/ingress from the excavation t
Oct 10, 2019
Resolve - Class - 2
Bc-33104 condition of site has to be in conformance with ssp.notes:at time of ispection i observed active site for which a ssm is required that is contrary to ssp.a-lang doesnt match ssp.b-only one excavator re
Oct 10, 2019
Resolve - Class - 2
Bc3304.4.5 placing of soil or foundation work equipment shall not be placed close to the edge of the excavation.notes:at time of inspection i observed active site for which assm is required with a excavator on
Oct 10, 2019 · Penalty $1,250
Resolve - Class - 1
Sec. 3303.3 watch person. at time of inspection on a proposed 33 sty new bldg w/a footprint of 15,839sq ft observed that no watchperson has been designated to the site. this observation was made upon review of
Aug 27, 2019
Resolve - Class - 2
Failure to protect or adequately protect adjoining properties during construction or demolition operation. at the time of inspection, it was observed that the contractor failed to protect the windows of the
Feb 28, 2018 · Penalty $400
Resolve - Class - 2
Safe to safeguard public & property. at the time of my inspection of a 33 sty bldg at foundation level,drilling work in progress. responding to complaint#1473294 where adjacent bldg owner is complaining about
Feb 27, 2018
Resolve - Class - 2
Pedestrian protection does not meet code specification. note: observed sidewalk shed lights are not operating at time of inspection 6:30pm that does not meet code specification. #3307.6.4.8 rem: comply with cod
Nov 17, 2017 · Penalty $2,400
Resolve - Class - 2
Failure to certify correction-the respodent fail to comply w/an order of the commissioner issued pursuant to section ac 28-204.2. oath summons #35218938k w/date of occurrence 3-20-17 is stipulation/in vio w/o
Oct 4, 2017 · Penalty $800
Resolve
Complaints
- Heating
Heat related
Jan 26, 2007 · Apt 202
Close - Heating
Heat related
Nov 23, 2006 · Apt 202
Close - Heating
Heat related
Nov 23, 2006 · Apt 202
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (H1)
- Year built
- 2021
- Floors
- 32
- Residential units
- —
- Building area
- 157,517 ft²
- Lot area
- 7,883 ft²
- Zoning
- C6-4M
- Community board
- 105
- Council district
- 3
- Block / lot
- 784 / 12
- Assessed value
- $14,726,700
- Landmark / historic district
- No
Questions about 255 West 34 Street
Who owns 255 West 34 Street?
The owner of record in NYC Department of City Planning PLUTO data is Penn District Hotel LLC.
Does 255 West 34 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 255 West 34 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 255 West 34 Street built?
City records list 2021 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.