roofy

255 West 34 Street

Manhattan, NY 10001BBL 1-00784-0012Map

Owner of record: Penn District Hotel LLC

255 West 34 Street is a hotel built in 2021 in Manhattan, 10001. The owner of record is Penn District Hotel LLC. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
49
ECB violations
103
HPD complaints
3

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 49

  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2024

    Dob violation - dismissed
  • Construction other optional

    Vio24-50323

    Feb 9, 2024

    Dob violation - dismissed
  • Construction other optional

    The dob hereby orders you to stop all concrete work under job #112745100 - except to make site safe - due to withdrawal of concrete contractor

    Feb 3, 2023

    Dob violation - dismissed
  • Construction other optional

    The dob hereby orders you to stop all concrete work under job #112745100 - except to make site safe - due to withdrawal of concrete contractor

    Feb 3, 2023

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 27, 2022

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 27, 2022

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 27, 2022

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Jan 17, 2020

    Dob violation - dismissed
  • Construction other optional

    The department of buildings orders that all work under permit issued i n connection with application #1140602122 stop all work immediateley d ue to applicant withdrawal, stop all work and make site safe remedy: obtain all required documents

    Aug 5, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
Show 39 more ↓
  • Construction other optional

    C-construction other optional

    Jun 21, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 14, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2014 inspection/test

    Jun 10, 2015

    Dob violation - dismissed
  • Elevator elevatorrequired

    Violation issued to elevator-failure to file category 1 2014 inspectio n/test

    Jun 10, 2015

    Dob violation - active
  • Elevator elevatorrequired

    Violation issued to elevator-failure to file category 1 2013 inspectio n/test

    Oct 31, 2014

    Dob violation - active
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2013 inspection/test

    Oct 31, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 24, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 24, 2014

    Dob violation - active
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst

    May 30, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    Violation issued to elevator-failure to file category 1 2012 inspectio n/test

    Mar 31, 2014

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 8, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 3, 2012

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 4, 2011

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 3, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 3, 2010

    Dob violation - active
  • Elevator annual inspection / test elevatorrequired

    Vcat1-elevator annual inspection / test elevatorrequired

    Oct 8, 2010

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Feb 27, 2009

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 25, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 28, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 9, 2007

    Dob violation - resolved
  • Construction other optional

    C-construction other optional

    Jul 7, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 13, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 17, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 16, 2003

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Feb 19, 2002

    Dob violation - dismissed
  • Zoning none

    Z-zoning none

    Jul 27, 2001

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jul 27, 2001

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jan 30, 1997

    Vpw-violation unserved ecb-work without permit-active
  • Construction other optional

    C-construction other optional

    Jan 30, 1997

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Mar 8, 1996

    Dob violation - dismissed
  • Zoning none

    Z-zoning none

    Aug 21, 1995

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Apr 17, 1995

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 24, 1994

    Vp*-violation unserved ecb- dismissed
  • Elevator elevatoroptional

    1

    Jun 28, 1993

    Dob violation - dismissed
  • Zoning none

    Z-zoning none

    Jan 4, 1993

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 14, 1992

    Vp*-violation unserved ecb- dismissed
  • Boiler boiler optional

    32/20b remove all rags and combustibles from boiler room-chimney cleanout door missing-replace door and clean chimney

    Apr 19, 1990

    Vp*-violation unserved ecb- dismissed

ECB violations · 103

  • Class - 2

    At time of inspection observed 4 active suspended scaffolds at exposure 1 and 3. upon reviewing altrex suspended scaffolds manufactures specifications it shows that platforms 6 meter and below shall not have ca

    Sep 3, 2026 · Penalty $1,250

    Resolve
  • Class - 2

    Upon reviewing approve plans notice work not conforming to setup. detail use for delta outrigger beams shows cable truss label as main tension wire rope to be install. none of this setups have tension wire inst

    Sep 3, 2026

    Resolve
  • Class - 2

    At time of inspection observed 4 active suspended scaffolds. upon inspecting setup observed a frames installed some with wheels and others with screw jacks. i request to see the manufacture specs for this frame

    Sep 3, 2026 · Penalty $1,250

    Resolve
  • Class - 2

    At time of inspection observed active suspended scaffolds at exp. 1 and 3. upon requesting rigging foreman card to dennis fernando vizuete who introduce himself as the foreman he could not produce the card. sc

    Sep 3, 2026 · Penalty $1,250

    Active
  • Class - 2

    At time of inspection observed 5 suspended scaffolds setups at exp. 1 and 3, 4 of them active. as per dob records last notification was m01292613-i1 8739 created on 5-28-26 which is for the removal of scaffolds

    Sep 3, 2026 · Penalty $5,000

    Active
  • Class - 2

    Observed suspended scaffold/outrigger installation nonconforming to approved cd5. tiebacks improperly attached to dunnage, grill/catwalk andparapet clamps. parapet clamps not installed perpendicular to building

    May 16, 2026

    Resolve
  • Class - 1

    3314.10.11 at time of inspection, suspended scaffold at exposure #1 observed not in use and not lowered to ground or deck as required. scaffold left parked at 33,fl roof deck. no details provided to demonstrate

    May 16, 2026 · Penalty $5,000

    Resolve
  • Class - 2

    3301.7 observed suspended scaffold platform assembled contrary to manufacturer specifications/design requirements. altrex platform configuration and guardrail setup not verified by approved manufacturer data. r

    May 16, 2026 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping per section requirement. as noted: at time of inspection at a jobsite of a proposed 36 story building already at the bulkhead level. observed from the 1st floor exposur

    May 14, 2026 · Penalty $2,500

    Resolve
  • Class - 2

    3309.10/3309.13 35 story nb active site work contrary to ssp onsite.observed work on roof & unfinished exterior work with suspended scaffolds parked on adjoining property roof attached wire ropes. overhead was

    Mar 3, 2026

    Resolve
Show 40 more ↓
  • Class - 1

    35 story new building active site.observed multiple fall/struck by hazards onsite in multiple floors/locations in equipment rooms/elevator shafts & 1 fl mezzanines. no/missing or inadequate guardrails/mid rails

    Mar 3, 2026 · Penalty $5,000

    Resolve
  • Class - 2

    At time of inspection at a 36-story nb building, two workers were observed performing leading-edge work while properly tied off; however, no required controlled access zone was established or maintained. contra

    Dec 20, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    At time of inspection, a delivery operation was observed with four workers present. construction materials were stored on the sidewalk within the pedestrian walkway, creating an unsafe condition and obstructing

    Dec 20, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    33 story new building active site with ongoing concrete pour on 27 floor. observed concrete line pump riser in place from street up to 27 floor. on 2,3 floor observed wire ropes attached to line pump riser anch

    Apr 30, 2025

    Resolve
  • Class - 2

    A proposed 33 story new building active site. active concrete pour of 27 floor. observed no/missing or inadequate protection on street at exp#1 contrary to site safety plans. plans show contractor to provide yo

    Apr 30, 2025 · Penalty $625

    Resolve
  • Class - 2

    33 story new building active site. ongoing work concrete pour. upon entry to site observed concrete walls partially demolished at cellar & sub cellar level. large pile 50x50 ft of demolition debris not properly

    Apr 30, 2025

    Resolve
  • Class - 2

    At the time of inspection while responding to a complaint, i observed sidewalk shed installed for pedestrian protection at exposure #1 corner not code compliant. i observed 1 broken panel 2 damage cross braces

    Mar 1, 2024 · Penalty $2,430

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment or temporary no toe boards.as noted at time of inspection at an active jobsite for a proposed33 story building at the bulkhead level.observed inadequate guardrails

    Feb 2, 2023 · Penalty $5,000

    Resolve
  • Class - 1

    Note: at the time of pouring work at 21st floor, worker slipped & fell from a wood ladder on 19th floor, went to hospital. also observed inadequate pre-shift safety meeting content, not communicate about slippi

    Sep 14, 2022

    Resolve
  • Class - 1

    Note: at the time of pouring work at 21st floor, worker slipped & fell from a wood ladder on 19th floor, went to hospital. inspector rivaled, ssm or gc not notify dob direct hot line or email, they called 311

    Sep 14, 2022

    Resolve
  • Class - 1

    Note: at the time of pouring work on 21st floor, worker slipped, fell from wood ladder on 19th floor at 06:20 am (09/13/2022), went to hospital. inspector rivaled site safety manager does not notify dob by dire

    Sep 14, 2022

    Resolve
  • Class - 1

    Note: as per ssm worker slipped from egress ladder when he coming down 21st floor working deck to 20th floor, went hospital. observed no permanent stairs after 16th floor, when they working 21st floor; as per

    Aug 30, 2022 · Penalty $6,250

    Resolve
  • Class - 1

    Note: as per ssm worker slipped from egress ladder when he coming down 21st floor working deck to 20th floor, went hospital. also observed missing guard rails at stairs open area at 13th floor & more than 5ft e

    Aug 30, 2022 · Penalty $12,500

    Resolve
  • Class - 2

    Note: as per ssm worker slipped from egress ladder when he coming down 21st floor working deck to 20th floor, went hospital. also observed missing rebar caps at sub cellar level creating hazard of impale when p

    Aug 30, 2022 · Penalty $5,000

    Resolve
  • Class - 1

    Watchperson. after walking the perimeter of job site for 15 minutes, knocked on fence&entrance door, observed no active work, no workers on site. upon review the department records observed lot area 15,834 sq.f

    Apr 21, 2022

    Resolve
  • Class - 1

    3309.10 roof protection.at the time of my inspection at a 33 story newbuilding,i observed inadequate roof protection on exp2 and 4 property.ohp shed on exp2 with no loads imposed calculation and count lever on

    Apr 19, 2022 · Penalty $2,500

    Resolve
  • Class - 2

    3314.3.4 no loads imposed.at the time of my inspection at a 33 story new building,i obsedved on exp2 6 story building support scaffold in place of roof protection.i asked site safety to provide ccdl wavier to u

    Apr 19, 2022

    Resolve
  • Class - 1

    Failure to file evidence of compliance with worker's compensation insurance.at 33 story new building currently at 16 floor work in progress observed workers working on site for eastland assoc corp review of sys

    Apr 11, 2022 · Penalty $5,030

    Resolve
  • Class - 1

    Bc 3305.3.6.1.2 failure to secure reshores within 10' of an unenclosedperimeter. as noted:at time of inspection at an active construction site,observed on several floors including 9th fl and mezzanine fl,reshor

    Feb 1, 2022 · Penalty $2,500

    Resolve
  • Class - 1

    Bc 1905.6.3 failure to remove strength test cylinders stored for a period up to 48 hours. as noted:at time of inspection at an active construction site,building up to 15th fl slab,16th fl deck(unpoured),observe

    Feb 1, 2022 · Penalty $625

    Resolve
  • Class - 1

    No site specific form work design drawings present per 3301.7.as notedat time of inspection at an active construction site observed floors sub-cellar to fifteenth floor placed.upon request of form work drawings

    Jan 27, 2022

    Resolve
  • Class - 2

    28-116.2.3,28-105.5 failure to provide an adequate inspection program tr3.as noted at time of inspection at an active construction site,observed a batch concrete ticket for stairs poured the day before stating

    Jan 27, 2022

    Resolve
  • Class - 1

    Bc 3301.2 failure to maintain adequate safety strap installation log. as noted:at time of inspection at an active construction site,observedconcrete embedded safety straps on floors 1-14(15th fl slab). upon req

    Jan 27, 2022

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping per section requirements.note:at time of inspection of 33 story nb currently at 11 floor level work in progress.i observed a lot of unused construction materials and de

    Oct 21, 2021

    Resolve
  • Class - 1

    Failed to notify the dept of an incident/accident that resulted in a fatality or an injury. note: a workers ankle was bleeding. the worker was transported to a hospital by an ambulance for treatment. a per chec

    Oct 13, 2021

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping per section requirements.notes:at time of inspection at 33 story new building construction activity in progress observed inadequate housekeeping consisting of large amo

    Aug 20, 2021

    Resolve
  • Class - 2

    Bc33016-no design drawings for temporary platforms and ladders.at timeof inspection of this proposed 33 story new building,i observed activework currently forming the 6th floor slab.temporary wooden platform bu

    Aug 2, 2021

    Resolve
  • Class - 1

    Bc 3303.4.7 unsafe storage near sidewalk walkways and pathway-storage material not property protected at exp#1 noted:at time of inspection of a proposed 33 story nb closed jobsite at foundation phase i observed

    Jun 2, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to maintain/display on site drawings/docs required by ch33(no design drawing for shoring system)at time of inspepction on an active site of a 33 stry bldg currently at 2nd fl deck,observed temp shoring

    Sep 25, 2020 · Penalty $625

    Resolve
  • Class - 2

    Bc 3301.6 no design drawing(temporary constraction protectwe sturcture-fence)at time of inspection,i observed an active construction site onfoundation/earthwork phase.upon inspection,it was discovered that the

    May 8, 2020

    Resolve
  • Class - 2

    Sec. 3304.4.5 design loads for lagging & s.o.e. at time of inspection,observed hydraulic excavator placed at the edge of a sidewalk above anexcavated area supported by wood lagging/soe. soil ramp/(berm)is place

    Apr 14, 2020

    Resolve
  • Class - 2

    3301.2&27-1009(a) failure to instistute maintain safety equipment measures or temporary construction no guard rails at the tim eof inspection 33 story nbv i observed at the street level no guard rail in front o

    Nov 22, 2019

    Resolve
  • Class - 1

    Bc-3309.7 failure to provide at least one safe means of egress from excavation.notes:at time of inspection i observed active site for which a ssm is required with inadequate access/ingress from the excavation t

    Oct 10, 2019

    Resolve
  • Class - 2

    Bc-33104 condition of site has to be in conformance with ssp.notes:at time of ispection i observed active site for which a ssm is required that is contrary to ssp.a-lang doesnt match ssp.b-only one excavator re

    Oct 10, 2019

    Resolve
  • Class - 2

    Bc3304.4.5 placing of soil or foundation work equipment shall not be placed close to the edge of the excavation.notes:at time of inspection i observed active site for which assm is required with a excavator on

    Oct 10, 2019 · Penalty $1,250

    Resolve
  • Class - 1

    Sec. 3303.3 watch person. at time of inspection on a proposed 33 sty new bldg w/a footprint of 15,839sq ft observed that no watchperson has been designated to the site. this observation was made upon review of

    Aug 27, 2019

    Resolve
  • Class - 2

    Failure to protect or adequately protect adjoining properties during construction or demolition operation. at the time of inspection, it was observed that the contractor failed to protect the windows of the

    Feb 28, 2018 · Penalty $400

    Resolve
  • Class - 2

    Safe to safeguard public & property. at the time of my inspection of a 33 sty bldg at foundation level,drilling work in progress. responding to complaint#1473294 where adjacent bldg owner is complaining about

    Feb 27, 2018

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specification. note: observed sidewalk shed lights are not operating at time of inspection 6:30pm that does not meet code specification. #3307.6.4.8 rem: comply with cod

    Nov 17, 2017 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to certify correction-the respodent fail to comply w/an order of the commissioner issued pursuant to section ac 28-204.2. oath summons #35218938k w/date of occurrence 3-20-17 is stipulation/in vio w/o

    Oct 4, 2017 · Penalty $800

    Resolve

Complaints

  • Heating

    Heat related

    Jan 26, 2007 · Apt 202

    Close
  • Heating

    Heat related

    Nov 23, 2006 · Apt 202

    Close
  • Heating

    Heat related

    Nov 23, 2006 · Apt 202

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Hotel (H1)
Year built
2021
Floors
32
Residential units
—
Building area
157,517 ft²
Lot area
7,883 ft²
Zoning
C6-4M
Community board
105
Council district
3
Block / lot
784 / 12
Assessed value
$14,726,700
Landmark / historic district
No

Questions about 255 West 34 Street

Who owns 255 West 34 Street?

The owner of record in NYC Department of City Planning PLUTO data is Penn District Hotel LLC.

Does 255 West 34 Street have violations?

NYC HPD has no housing violations on record for this property.

Is 255 West 34 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 255 West 34 Street built?

City records list 2021 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.