54 Barrow Street
Manhattan, NY 10014BBL 1-00588-0040Map
Owner of record: 54 Barrow Street Associates LLC
54 Barrow Street is a walk-up apartment building built in 1891 in Manhattan, 10014. It has 20 residential units across 5 floors. The owner of record is 54 Barrow Street Associates LLC. HPD has recorded 295 housing violations here, most recently on December 3, 2025. 14 of the 50 most recent violations are still open. City tax records listed 2 rent-stabilized apartments here in 2024.
- HPD violations
- 295
- DOB violations
- 22
- ECB violations
- 32
- HPD complaints
- 296
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 295
- CImmediately hazardous
Provide ready access to buildings heating system door lock at boiler room
Dec 3, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5d, 5th story, 2nd apartment from north at east
Dec 3, 2025 · Apt 5D
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5d, 5th story, 2nd apartment from north at east
Dec 3, 2025 · Apt 5D
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2d, 2nd story, 1st apartment from east at south
Jan 25, 2023 · Apt 2D
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2d, 2nd story, 1st apartment from east at south
Jan 25, 2023 · Apt 2D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective chipped bricks at east wall in the 3rd room from north located at apt 2d, 2nd story, 1st apartment from east at south
Jan 25, 2023 · Apt 2D
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2d, 2nd story, 1st apartment from east at south
Jan 25, 2023 · Apt 2D
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2019
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
M/d law abate the nuisance consisting of air conditioner unit installed at window 5th story balcony obstructing the egress at fire escape building front
Aug 21, 2019
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective door knob in the entrance located at apt 1b, 1st story, 1st apartment from south at west
Jan 2, 2019 · Apt 1B
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration sheetrock with wood/ metal studs erected from floor to ceiling creating an additional room in the 1st room from north at west located at apt 3b, 3rd story, 1st apartment from west at north
Jan 2, 2019 · Apt 3B
Open — Nov sent out - BHazardous
Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 1b, 1st story, 1st apartment from south at west
Jan 2, 2019 · Apt 1B
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of steam- radiator / air -conditioner on roof
Jun 5, 2018
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of garbage and personal items from the 5th story to the bulkhead at public hall stairs, 5th story
Mar 22, 2018
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of barbed wire attached to east parapet wall at roof
Mar 22, 2018
Closed — Violation closed - BHazardous
Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 5c, 5th story, 1st apartment from west at north
Mar 22, 2018 · Apt 5C
Open — Nov sent out - BHazardous
Properly repair the broken or defective emergency push bar , 5th story
Mar 22, 2018
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 24, 2016
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at lobby, 1st story
Sep 23, 2016
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at lobby, 1st story
Sep 23, 2016
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing. at lobby, 1st story
Sep 23, 2016
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing. at lobby, 1st story
Sep 23, 2016
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at lobby, 1st story
Sep 23, 2016
Closed — Violation closed - BHazardous
§ 53,187,231 m/d law & dept rules & reg. provide means of egress from yard to street by fireproof passageway for which application must be filed for approval,or by unlocked door or gate in fence to adjoining premises with consent of adjacent owner. yard
Jun 13, 2016
Open — Nov sent out - BHazardous
§ 300, 301, 302, m/d law file plans and obtain a certificate of occupancy to legalize the following alteration or restore premises to prior legal condition illegal class a apartment created at cellar south contrary to c of o.
Jun 6, 2016
Open — Nov sent out - BHazardous
Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible, illegal class a apartment created at cellar south
Jun 6, 2016
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north located at apt 3b, 3rd story, 1st apartment from west at north
Jun 6, 2016 · Apt 3B
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 3b, 3rd story, 1st apartment from west at north
Jun 6, 2016 · Apt 3B
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 3b, 3rd story, 1st apartment from west at north
Jun 6, 2016 · Apt 3B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 3b, 3rd story, 1st apartment from west at north
Jun 6, 2016 · Apt 3B
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the roof
Jun 6, 2016
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of exccesive cable, and bell wires at roof creating a trip hazard condition
Jun 6, 2016
Closed — Violation closed - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections illegal class a apartment created at cellar south.
Jun 6, 2016
Open — Second no access to re-inspect violation - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 1, 2015
Closed — Violation dismissed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing front bottom channel beam at 2nd story balcony, front south at fire escape
Mar 3, 2014
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of hanging cable and teiephone wires at stairs to basement
Feb 20, 2014
Open — Nov sent out - BHazardous
Properly secure the loose all wood treads at basement
Feb 20, 2014
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures at sink in the kitchen located at apt 3b, 3rd story, 1st apartment from west at north
Feb 20, 2014 · Apt 3B
Closed — Violation closed - BHazardous
Provide adequate supply of cold water for the fixtures at sink in the kitchen located at apt 3b, 3rd story, 1st apartment from west at north
Feb 20, 2014 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures , in the bathroom located at apt 3b, 3rd story, 1st apartment from west at north
Feb 20, 2014 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures at water closet in the bathroom located at apt 3b, 3rd story, 1st apartment from west at north
Feb 20, 2014 · Apt 3B
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice at cellar
Sep 5, 2013
Closed — Violation closed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all stories rear at fire escape
Sep 5, 2013
Closed — Violation closed - ANon-hazardous
Refit upper and lower window sashes in the entire apartment located at apt 4b, 4th story, 2nd apartment from south at west
Jul 16, 2013 · Apt 4B
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 4b, 4th story, 2nd apartment from south at west
Jul 16, 2013 · Apt 4B
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in bathtub in the bathroom located at apt 4b, 4th story
Jun 18, 2013 · Apt 4B
Closed — Violation closed - ANon-hazardous
Refit loose window sashes in the 1st room from north located at apt 4b, 4th story, 2nd apartment from south at west
Jun 18, 2013 · Apt 4B
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in at wash basin in the bathroom located at apt 4b, 4th story, 2nd apartment from south at west
Jun 18, 2013 · Apt 4B
Closed — Violation closed
DOB building violations · 22
- Construction other optional
The borough commissioner has issued a stop work order for application #121958621 due to audit objections of pw-1 section 26. stop all work, make site safe, provide all required information to borough commission er's office forthwith
Jun 6, 2018
Dob violation - dismissed - Construction other optional
The borough commissioner has issued a stop work order for application #121802745 due to audit objections of pw-1 section 26. stop all work, make site safe, provide all required information to borough commission er's office forthwith
Jun 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 23, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 28, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 13, 2011
Dob violation - dismissed - Landmark none
Landmk-landmark none
Aug 11, 2009
Dob violation - active
Show 12 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Landmark none
Landmk-landmark none
Jan 30, 2006
Dob violation - dismissed - Landmark none
Landmk-landmark none
Jan 30, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed - Construction other optional
C-construction other optional
May 7, 1991
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
May 7, 1991
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
May 7, 1991
Dob violation - active - Construction other optional
C-construction other optional
May 7, 1991
Dob violation - active - Construction other optional
C-construction other optional
Feb 16, 1989
Vp-violation unserved ecb-active
ECB violations · 32
- Class - 1
Entire building house keeping was not up kept during interior demolition. observed dust accumulation throughout bilding, hallways and stairs creating slip hazard. excessive amounts debris and garbage stored in
Oct 1, 2026 · Penalty $2,500
Active - Class - 2
Failure to maintain bldg in code compliant manner. noted: at roof level inoperable/defective fire exit device at door. rmdy: repair or replace.
Mar 22, 2018 · Penalty $625
Active - Class - 2
Failure to maintain bldg in code compliant manner.noted: at roof leveladjoining chimneys and party walls are wrap with barb wire creating unsafe conditions for fire fighting operations to and from adjouring
Mar 22, 2018
Resolve - Class - 1
Filed a certificate form application etc,containing a material false statements. noted: the on sec#26 of pw1 job app#121802745 which was filed on 11-15-13 by check marking"no"for contains occupied housing for
Mar 21, 2018
Resolve - Class - 1
Filed a certificate form, application etc, containing a material falsestatement(s). noted: the owner/representative made false certifications on section #26 of pw1 job application #121802745, which was filed on
Mar 21, 2018 · Penalty $2,500
Resolve - Class - 1
Filed a certificate form application etc, containing a material false statement(s). noted: the owner/representative made false certifications on section #26 of pw1 job application #121958621 which was filed on
Mar 21, 2018 · Penalty $2,500
Resolve - Class - 1
Filed a certificate form application etc,containing a material false statements. noted: the owner/representative made false certifications on sec#26 of pw1 job app#121958621 which was filed on 3-24-14 by check
Mar 21, 2018
Resolve - Class - 2
Occupancy contrary to that allowed by cofo &dept of bldgs records partitions erected creating use of rooms for living.full kitchen w.gas range &kitchen sink also full bathroom w.water closet wash basin &bathtub
Jun 6, 2016
Resolve - Class - 2
Failure to comply with the comm's order to file a cert. of correction w/ the dob.noted:respondent failed to correct the violating conditionsand file a cert of correction, pursuant to 28-204.2, for nov#34856478z
Jan 4, 2011 · Penalty $2,000
Resolve - Class - 1
Work w/o a permit.noted:@ the rearyard the defective chimney has been replaced and the new chimney was erected w/o a permit.rem:obtain na permit
Nov 23, 2010 · Penalty $8,000
Resolve
Show 22 more ↓
- Class - 2
B254 25a 25b 34a 34b 15 16 40 50a 50b 50c 32a. 50a-boiler room not a storage room. 50b-remobe wast oil from boiler room. 50c-fresh air intake fan operating the wrong way & not interlock w/boiler.
Nov 6, 2010 · Penalty $2,500
Active - Class - 2
B254 50a 50b 50c 15 16 50a 50b 50c 50d. 50a-pipe safety valve up right. 50b-pipe backflow down no threaded end. 50c-boiler room not a storage room. 50d-fresh air intake fan not hot wired in & turning the wrong
Nov 6, 2010 · Penalty $1,250
Resolve - Class - 1
Unlawful act(s)failure to comply with an order of the commissione respondent failed to correct the condition(s) cited in prior nov#34852593xremoved & erected chimney @ rear of premises.no permits have been issu
Nov 3, 2010 · Penalty $12,000
Resolve - Class - 1
Work w/o a permit noted at rear of bldg the chimny has been demolished and a new one installed from cellar boiler room to roof all work done w/o a permit rem: obtain permit
Sep 27, 2010 · Penalty $8,000
Resolve - Class - 3
Failure to maintain bldg - at rear of bldg, a leader used to divirt storm water to drain, has a broken elbow. this caused water to flood up at 58 barrow and seep into the foundation at 56 barrow, flooding out
Aug 25, 2010 · Penalty $500
Active - Class - 2
B254/16/50a/50c/15/34b/50b/50d50a/remove all storage from bl room/50b-remove all flammables/50c-no cleanout @ /50d-no check valve
Aug 24, 2010 · Penalty $2,500
Active - Class - 2
B254/16/50a/50c/15/34b/50b/50a-remove all storage/50b-remove all flammables/50c-repair relief valve to correct position
Aug 24, 2010 · Penalty $1,250
Resolve - Class - 1
Failure to maintain bldg in a code-compliant manner; no fire stopping per bc 712.3;27-345. noted: at cellar boiler room se corner of ceilinghas an approx 4 sq ft hole in fire rated material exposing flr joists
Jun 15, 2010 · Penalty $10,000
Active - Class - 1
51,34b,50a,50b,25a,25b,32a,50c,50d,50e,50g,50h,15,16,3b,50i. must fix immediately. 50a-chimney about to collapse for boiler 50b-boiler room not a storage room 50c-peep hole glass dirty 50d-no check valve on col
Jan 26, 2010 · Penalty $25,000
Active - Class - 1
1. 1-operation of a sealed boiler.
Jan 26, 2010 · Penalty $5,000
Resolve - Class - 1
1. 1-operation of a sealed boiler.
Jan 26, 2010 · Penalty $5,000
Resolve - Class - 1
51,34b,50a,50b,32a,50c,50d,50e,50f,50g,3b. 50a-boiler room not a storage room 50b-chimney about to collapse for boiler 50c-pipe saftey valve up right 50d-pipe back flow preventor discharge down 50e-flue pipe fu
Jan 26, 2010 · Penalty $12,500
Resolve - Class - 1
51,34b,50a,50b,25a,25b,32a,50a,50b,50c,50d,50e,50f,50g,50h,15,16,3b. must fix immediately. 50a-chimney about to collapse for boiler 50b-boiler room not a storage room 50c-peep hole glass dirty 50d-no check valv
Jan 22, 2010 · Penalty $25,000
Active - Class - 1
51,34b,50a,50b,32a,50a,50b,50c,50d,50e,50f,50g. 50a-boiler room not a storage room 50b-chimney about to collapse for boiler 50c-pipe safety valve up right 50d-pipe backflow preventor discharge down 50e-flue pip
Jan 22, 2010 · Penalty $12,500
Resolve - Class - 1
Fail to maintain bldg walls or appurtenances. noted: at the rear of bldg (exp 3) at boiler chimney, the chimney is rusted & has broken apartat numerous sections. some of these sections are ready to dislodge & f
Jan 19, 2010 · Penalty $5,000
Active - Class - 1
Fail to maintain in a code compliant manner; no fire stopping. noted: at the cellar in the boiler room; the ceiling above the boiler; is broken & wood joists exposed, and there are holes in the wall around the
Jan 19, 2010 · Penalty $5,000
Active - Non-hazardous
Failure to comply with stop order. noted (1) installed kitchen countertop (2) installed bathroom shower wall ties & taping & compounding joints apt 1d. remedy: comply with stop work order.
Feb 18, 2004 · Penalty $1,500
Active - Non-hazardous
Work w/out a permit.noted:renovation underway at apts 1a and 1d (1st flr) without permits.removed partitions and poritions of walls and ceiling apt 1a.erected new partitions and doors new plubming pipes fixture
Feb 10, 2004
Resolve - Non-hazardous
Failure to comply with a stop work order noted : vio # 20403cb2ms02 issued for work w/o permit renovations still in progress taping dry wallplumbing electrical - complete renovation of apt 2nd fl front as previ
Feb 12, 2003 · Penalty $2,500
Active - Non-hazardous
Work w/o permit noted : on the 2nd floor the front east apt has been demoes & complete got renovation with in progress work of new metal ceiling framing & new wall studs new drywall, new flooring new entry door
Feb 4, 2003 · Penalty $2,500
Resolve - Non-hazardous
Work without a permit:approx 30% work completed noted:at 3rd story 2 front apts being renovated with partition walls & new ceiling erected with aluminum studs & sheetrock without any permits posted remedy:stop
Aug 2, 2000 · Penalty $250
Resolve - Non-hazardous
Failure to maintain building wall defect is 1)stone lintels & sills spalling,cracked,and defectiv at each story fron of building. remedy:provide protection for public and make all necessary repairs.
Aug 17, 1992 · Penalty $1,000
Resolve
Complaints
- Heat/hot water
Entire building
Dec 1, 2025 · Apt 3B
Close - Heat/hot water
Entire building
Jan 23, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 23, 2025 · Apt BLDG
Close - Door/window
Door
Apr 3, 2024 · Apt 1A
Close - Safety
Window guard broken/missing
Dec 15, 2023 · Apt 3D
Close - Unsanitary condition
Pests
Dec 15, 2023 · Apt 3D
Close - Unsanitary condition
Mold
Feb 16, 2023 · Apt BASEME
Close - Unsanitary condition
Garbage/recycling storage
Jan 7, 2023 · Apt BLDG
Close - Unsanitary condition
Pests
Dec 31, 2022 · Apt 2D
Close - Unsanitary condition
Pests
Aug 23, 2022 · Apt 2D
Close
Show 40 more ↓
- Unsanitary condition
Pests
Aug 22, 2020 · Apt 4D
Close - Water leak
Heavy flow
Feb 12, 2020 · Apt B
Close - Unsanitary condition
Pests
Aug 13, 2019 · Apt 5D
Close - Heat/hot water
Apartment only
Feb 1, 2019 · Apt 1D
Close - Safety
Window guard broken/missing
Jun 26, 2017 · Apt BASEME
Close - Heat/hot water
Apartment only
Dec 3, 2016 · Apt 4A
Close - Heat/hot water
Entire building
Oct 10, 2016 · Apt 5C
Close - Heat/hot water
Entire building
Oct 1, 2016 · Apt 1A
Close - Heat/hot water
Entire building
Sep 21, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 20, 2016 · Apt 5C
Close - Heat/hot water
Entire building
Mar 22, 2016 · Apt 2C
Close - Heat/hot water
Entire building
Mar 22, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 21, 2016 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 21, 2016 · Apt 5B
Close - Heat/hot water
Entire building
Dec 30, 2015 · Apt 1D
Close - Paint/plaster
Wall
Dec 21, 2015 · Apt 4C
Close - Water leak
Slow leak
Dec 21, 2015 · Apt 4C
Close - General
Bell/buzzer/intercom
Sep 10, 2015 · Apt 5B
Close - Safety
Smoke detector
Sep 10, 2015 · Apt 5B
Close - Heat/hot water
Entire building
May 28, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 12, 2015 · Apt BLDG
Close - Heat/hot water
Apartment only
Apr 4, 2014 · Apt 3B
Close - Unsanitary condition
Garbage/recycling storage
Mar 29, 2014 · Apt BLDG
Close - Heating
Heat related
Mar 1, 2014 · Apt 3B
Close - Electric
Wiring
Feb 12, 2014 · Apt 3B
Close - Nonconst
Rubbish
Feb 12, 2014 · Apt 3B
Close - General
Stairs
Feb 12, 2014 · Apt 3B
Close - Plumbing
Radiator
Feb 12, 2014 · Apt 3B
Close - Heating
Heat related
Feb 1, 2014 · Apt 3B
Close - Heating
Heat related
Jan 7, 2014 · Apt NA
Close - Nonconst
Rubbish
Sep 2, 2013 · Apt 4D
Close - Nonconst
Vermin
Sep 2, 2013 · Apt 4D
Close - Nonconst
Vermin
Sep 2, 2013 · Apt 4D
Close - General
Fire-escape
Sep 2, 2013 · Apt 4D
Close - General
Floor
Jul 10, 2013 · Apt 4B
Close - Appliance
Refrigerator
Jul 10, 2013 · Apt 4B
Close - Appliance
Electric/gas range
Jul 10, 2013 · Apt 4B
Close - General
Windows
Jul 10, 2013 · Apt 4B
Close - General
Windows
Jul 10, 2013 · Apt 4B
Close - General
Windows
Jul 10, 2013 · Apt 4B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C5)
- Year built
- 1891
- Floors
- 5
- Residential units
- 20
- Building area
- 9,320 ft²
- Lot area
- 2,350 ft²
- Zoning
- R6
- Community board
- 102
- Council district
- 3
- Block / lot
- 588 / 40
- Assessed value
- $1,951,650
- Landmark / historic district
- Greenwich Village Historic District
HPD registration #114067, last renewed Aug 30, 2025.
Questions about 54 Barrow Street
Who owns 54 Barrow Street?
The owner of record in NYC Department of City Planning PLUTO data is 54 Barrow Street Associates LLC.
Does 54 Barrow Street have violations?
Yes. NYC HPD has recorded 295 housing violations at this property.
Is 54 Barrow Street rent stabilized?
NYC Department of Finance tax bills listed 2 rent-stabilized units here in 2024 (about 10% of its 20 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 54 Barrow Street built?
City records list 1891 as the year it was built.
How many apartments are in 54 Barrow Street?
It has 20 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.