189 Bleecker Street
Manhattan, NY 10012BBL 1-00542-7502Map
Owner of record: 189 195 Equities Corp
189 Bleecker Street is a condominium built in 1907 in Manhattan, 10012. It has 40 residential units across 6 floors. The owner of record is 189 195 Equities Corp. HPD has recorded 22 housing violations here, most recently on February 15, 2022. City tax records listed 2 rent-stabilized apartments here in 2024.
- HPD violations
- 22
- DOB violations
- 7
- ECB violations
- 12
- HPD complaints
- 23
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 22
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 15, 2022
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following minimum of 100 watts as required(light fixture(s) present). at front areaway
Sep 9, 2017
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioners protuding beyond window sills at 2 & 3rd sty balcony,front south at fire escape
Aug 29, 2008
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner protruding beyond window sill on 2nd sty balcony ,front south at fire escape
Nov 21, 2006
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots on 4,6th sty balcony ,front south at fire escape
Nov 21, 2006
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 9, 4th story, apartment at north
Jul 18, 2005 · Apt 9
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective base of cabinet under sink 4 sty southeast apt 12a kitchen. located at apt 12a, 4th story, section '' ''
Oct 20, 1999 · Apt 12A
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of evidence of moisture penetrating ceiling and east wall 4 sty southeast apt 12a kitchen. located at apt 12a, 4th story, section '' ''
Oct 20, 1999 · Apt 12A
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling thru out 4 sty southeast apt 12a. located at apt 12a, 4th story, section '' ''
Oct 20, 1999 · Apt 12A
Closed — Violation dismissed
Show 12 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls northeast room 4 sty north apt 12a. , section '' ''
Aug 26, 1996 · Apt 12A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling northwest room 4 sty north apt 12a. , section '' ''
Aug 26, 1996 · Apt 12A
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective baseboard thru out 4 sty north apt 12a. , section '' ''
Aug 26, 1996 · Apt 12A
Closed — Violation dismissed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration door and jamb installed 6th sty public hall at front.
Jul 18, 1996
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of two eyes at top of metal flags doors at end of east fire passageway.
Jul 18, 1996
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling front room 5 sty apt 16. located at apt 16
Jul 18, 1996 · Apt 16
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling southwest room 5 sty apt 16. located at apt 16
Jul 18, 1996 · Apt 16
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling bathroom 5 sty apt 16. located at apt 16
Jul 18, 1996 · Apt 16
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling southwest room 2 sty apt 4. , section '' ''
Jul 18, 1996 · Apt 4
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling thru out 2 syt apt 4. , section '' ''
Jul 18, 1996 · Apt 4
Closed — Violation dismissed - BHazardous
D26-10.01, 10.05 adm code and dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes 4th and 5th stys at rear stack.
Jul 18, 1996
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing 3 sty apt 9 dixon. , section '' ''
Sep 10, 1990 · Apt 9
Closed — Violation dismissed
DOB building violations · 7
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 21, 2021
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Apr 30, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Facade facade optional
Ll10/80-local law 10/80 - facade facade optional
Feb 24, 2000
Dob violation - dismissed
ECB violations · 12
- Class - 1
Failure to maintain building in code compliant manner.no fire-stoppingper bc 712.3;27-345.notes:at time of inspection at an occupied-dwelling observed firestopping removed in ceiling in commercial space.tenants
Apr 25, 2023 · Penalty $2,500
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments.note:at time of inspection observed all firestopping wasremoved from ceiling located at ground level floor commercial space.jo
Apr 25, 2023 · Penalty $2,500
Resolve - Class - 1
28-201.1 tenant protection plan inadequate for scope of work.note:at time of inspection at an occupied dwelling observed firestopping removed from ceiling of commercial space.tenants occupied units above.tpp mu
Apr 25, 2023 · Penalty $2,500
Resolve - Class - 2
Failure to maintain exterior building facade and appurtenances. note:at time of inspection observed at exp#1(macdougal st) spalled brick at multiple locations at 2nd fl close to exp#2(corner),deteriorated morta
Jul 16, 2021 · Penalty $1,250
Active - Class - 1
Unsafe storage of combustible material and equipment. note at the timeof inspection illegal storage of 4 15lbs propane tanks were stored inside outdoor dining structure which is made of wood and it's located on
Apr 22, 2021
Resolve - Class - 2
No plans available for alt 2 job#120989118 rem: provide plans contact qns sep
Jul 31, 2012
Resolve - Non-hazardous
B4b,bq9.bq9-new federal hot water boiler & new bechet gas fired burnerinstalled,up & running on this day w/o bl on emergency ara permit.
Jan 7, 2008 · Penalty $500
Resolve - Hazardous
Failure to file an amended round five report acceptable to this dept pursuant to rule r.c.n.y.32-03b(5),indicating correction of hazardous conditions described in initial ll10/80 report.rem:file an amended repo
Feb 16, 2001 · Penalty $1,000
Resolve - Hazardous
Failure to file an amended round five report acceptable to this department pursuant to rule r.c.n.y. 32-03b(5), indicating correction of hazardous conditions described in initial ll10/80 report. remedy: file an
Jul 14, 2000 · Penalty $400
Resolve - Non-hazardous
No valid permit for temporary construction noted:at front of building approx.30'length sidewalks shed has been erected.remedy:obtain permit for shed.
Mar 20, 2000
Resolve
Show 2 more ↓
- Non-hazardous
Failure to maitain: (1)at east side wall of premises (93 mc dougal) mortar loose and missing throughout. (2)cornice overhang on roof at eastcorner on bleecker street loose & defective. remedy:make all repairs t
Aug 17, 1992 · Penalty $175
Resolve - Non-hazardous
Work without a permit work noted removal of sink partition section removed at mik north east section of apt 14 5 floor north removal of shower stall remedy stop all work obtain permits
Aug 6, 1992 · Penalty $350
Resolve
Complaints
- Water leak
Slow leak
Aug 2, 2026 · Apt 15
Close - Unsanitary condition
Mold
Aug 2, 2026 · Apt 15
Close - Paint/plaster
Ceiling
Aug 2, 2026 · Apt 15
Close - Unsanitary condition
Sewage
Jan 27, 2026 · Apt 12B
Close - Water leak
Slow leak
Jan 27, 2026 · Apt 12B
Close - Unsanitary condition
Pests
Jun 23, 2025 · Apt 14
Close - Heat/hot water
Apartment only
Mar 14, 2021 · Apt 18
Close - Plumbing
Water supply
Nov 19, 2019 · Apt 3
Close - Water leak
Heavy flow
Jun 19, 2014 · Apt 2
Close - Plumbing
Bathtub/shower
Jun 9, 2014 · Apt 2
Close
Show 13 more ↓
- General
Doors
May 31, 2011 · Apt 5
Close - Nonconst
Vermin
Jun 10, 2010 · Apt 5
Close - Plumbing
Sewer
Aug 23, 2008 · Apt 6
Close - Plumbing
Sewer
Aug 23, 2008 · Apt 6
Close - Heating
Heat related
Dec 2, 2007 · Apt 15
Close - Heating
Heat related
Dec 2, 2007 · Apt 9
Close - Heating
Heat related
Dec 1, 2007 · Apt 1
Close - Heating
Heat related
Dec 1, 2007 · Apt 9
Close - Heating
Heat related
Nov 16, 2006 · Apt 5
Close - General
Mold
Feb 16, 2004 · Apt 14
Close - Paint/plaster
Ceiling
Feb 16, 2004 · Apt 14
Close - Paint/plaster
Wall
Feb 16, 2004 · Apt 14
Close - Paint/plaster
Ceiling
Feb 16, 2004 · Apt 14
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 1907
- Floors
- 6
- Residential units
- 40
- Building area
- 27,228 ft²
- Lot area
- 5,550 ft²
- Zoning
- R7-2
- Community board
- 102
- Council district
- 2
- Block / lot
- 542 / 7502
- Assessed value
- $4,774,050
- Landmark / historic district
- South Village Historic District
HPD registration #127241, last renewed Jul 18, 2025.
Questions about 189 Bleecker Street
Who owns 189 Bleecker Street?
The owner of record in NYC Department of City Planning PLUTO data is 189 195 Equities Corp.
Does 189 Bleecker Street have violations?
Yes. NYC HPD has recorded 22 housing violations at this property.
Is 189 Bleecker Street rent stabilized?
NYC Department of Finance tax bills listed 2 rent-stabilized units here in 2024 (about 5% of its 40 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 189 Bleecker Street built?
City records list 1907 as the year it was built.
How many apartments are in 189 Bleecker Street?
It has 40 residential units and 41 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.