186 Bleecker Street
Manhattan, NY 10012BBL 1-00526-0056Map
Owner of record: 186 Bleecker Property Owner LLC
186 Bleecker Street is a walk-up apartment building built in 1910 in Manhattan, 10012. It has 8 residential units across 5 floors. The owner of record is 186 Bleecker Property Owner LLC. HPD has recorded 143 housing violations here, most recently on September 4, 2025. 39 of the 50 most recent violations are still open. City tax records listed 5 rent-stabilized apartments here in 2024.
- HPD violations
- 143
- DOB violations
- 14
- ECB violations
- 10
- HPD complaints
- 174
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 143
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the 1st room from east at south located at apt 3b, 3rd story, 1st apartment from east at south
Sep 4, 2025 · Apt 3B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3b, 3rd story, 1st apartment from east at south
Sep 4, 2025 · Apt 3B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlet at south in the 2nd room from east located at apt 3b, 3rd story, 1st apartment from east at south
Sep 4, 2025 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Sep 4, 2025
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Sep 4, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 4, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox at public hall, 1st story
Sep 4, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Sep 4, 2025
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules at public hall, 1st story
Sep 4, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings
Sep 4, 2025
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 1, 2nd story, 1st apartment from west at north
Sep 4, 2025 · Apt 1
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioning unit pertruding more than 4 inches from window sill at 2nd story balcony at north fire escape at building front
Aug 4, 2024
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioning unit pertruding more than 4 inches from window sill on 3rd story party wall balcony at north fire escape at building front
Aug 4, 2024
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner unit at 3rd story balcony at north exterior wall at party wall balcony
Jul 11, 2024
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner unit at 2nd story balcony at north exterior wall at party wall balcony
Jul 11, 2024
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6, 4th story, 1st apartment from west at north
Jun 18, 2024 · Apt 6
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 6, 4th story, 1st apartment from west at north
Jun 18, 2024 · Apt 6
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Sep 4, 2023
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 4th story, 1st apartment from east at south
Sep 4, 2023 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4b, 4th story, 1st apartment from east at south
Sep 4, 2023 · Apt 4B
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 10, 2023
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Aug 10, 2023
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Aug 10, 2023
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 29, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at vestibule door at public hall, 1st story
Dec 7, 2022
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 2, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 8, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Jun 11, 2021
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jun 11, 2021
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jun 11, 2021
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at the time of inspection at public hall, 1st story
Jun 11, 2021
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jun 11, 2021
Open — Nov sent out - CImmediately hazardous
Arrange and make self-closing the doors ... in the entrance located at apt 2, 2nd story, 1st apartment from west at north
Jun 11, 2021 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at basement
Jun 11, 2021
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Jun 11, 2021 · Apt 2
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jun 10, 2021
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at building entrance door , 1st story
Jun 10, 2021
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jun 10, 2021
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jun 10, 2021
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at the time of inspection at public hall, 1st story
Jun 10, 2021
Open — Nov sent out - BHazardous
Provide security in event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at building entrance door , 1st story
Jun 10, 2021
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling at north wall in the 1st room from east at north located at apt 3b, 3rd story, 1st apartment from west at north
Jun 10, 2021 · Apt 3B
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east at north located at apt 3b, 3rd story, 1st apartment from west at north
Jun 10, 2021 · Apt 3B
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 16, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 1, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - BHazardous
Provide security in event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at building entrance door , 1st story
Feb 24, 2020
Open — Nov sent out
DOB building violations · 14
- Landmark none
Landmk-landmark none
May 19, 2026
Dob violation - active - Landmark none
Landmk-landmark none
May 19, 2026
Dob violation - active - Landmark none
Landmk-landmark none
May 19, 2026
Dob violation - active - Landmark none
Landmk-landmark none
May 19, 2026
Dob violation - active - Landmark none
Landmk-landmark none
May 19, 2026
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed
Show 4 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 10
- Class - 2
Atoi observed the new installation of electrical bx cables installed into multiple electrical boxes in building hallway on all 5 floors. electrical box's and cables observed install into building hallway walls
Aug 19, 2024 · Penalty $4,000
Active - Class - 2
Exp1 (macdougal st.) mortar missing, exp2 (bleeker st. side) cracking has started and mortar missing in some spots. exp4 rear mortar missing by down spout., maintain exterior building wall
Jan 11, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to maintain building in code compliant manner. at time of inspection observed heavy cracking at door to commercial space at exposure #4 on ground floor. crack is over 1/2" wide and will allow water intr
Sep 16, 2019 · Penalty $312
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances noted the following conditions the exterior facade wall at the top fl west (left & right sides) and the top fl north (left & right sides) have bulging brick
Jul 20, 2009 · Penalty $1,000
Resolve - Non-hazardous
Work without a permit noted enclosed rear yard cafe with movable windows walls and roof structure with decorative glass skylights on ceiling new floor and fireplace at west side of enclosed room w/shetrock
Jan 13, 1998
Resolve - Non-hazardous
Work wihtout a permit work noted: rear yard cafe enclosed with moveable windows, wiht plastic sheets for roof insulated wiht canvas on in- side active gas fire place with chiminey to first story roof. remedy:
Mar 4, 1994 · Penalty $350
Resolve - Non-hazardous
Operation of place of assembly without a current permit. remedy: obtain pa permit
Feb 18, 1994
Resolve - Non-hazardous
Operation of pa contrary to the c of o when the current c of o does not allow th eoperation of a pa legal c of o #77431 73 persons now has 150 persons remedy discontinue illegal occupancy and obtain new c of o
Feb 18, 1994
Resolve - Hazardous
Failure to have approved pa plan avalable for inspection remedy provide appove plan for inspection
Dec 7, 1990 · Penalty $115
Resolve - Non-hazardous
Use of prohibited hardware on side exit turn knob remedy remove illegal hardware
Aug 21, 1989
Resolve
Complaints
- General
Mailbox
Sep 3, 2026 · Apt 3B
Open - Unsanitary condition
Garbage/recycling storage
Mar 23, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Aug 6, 2025 · Apt 5
Close - Unsanitary condition
Pests
Jul 20, 2025 · Apt 1
Close - Unsanitary condition
Pests
Jul 17, 2025 · Apt 1
Close - Electric
Outlet/switch
Jun 25, 2025 · Apt 3B
Close - Heat/hot water
Entire building
Feb 13, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 12, 2025 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Feb 11, 2025 · Apt 4B
Close - Plumbing
Radiator
Dec 3, 2024 · Apt 5
Close - General
Mailbox
Sep 3, 2024 · Apt 4B
Close - Heat/hot water
Apartment only
Aug 15, 2024 · Apt 6
Close - Unsanitary condition
Mold
Aug 13, 2024 · Apt 6
Close - Unsanitary condition
Pests
Aug 13, 2024 · Apt 6
Close - Plumbing
Basin/sink
Aug 13, 2024 · Apt 6
Close - Heat/hot water
Apartment only
Jun 20, 2024 · Apt 6
Close - Unsanitary condition
Pests
May 7, 2024 · Apt 6
Close - Electric
Power outage
May 7, 2024 · Apt 6
Close - Heat/hot water
Entire building
Mar 18, 2024 · Apt 3
Close - Plumbing
Basin/sink
Mar 5, 2024 · Apt 3
Close - Heat/hot water
Entire building
Oct 23, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 22, 2023 · Apt 3A
Close - Heat/hot water
Entire building
Oct 19, 2023 · Apt BLDG
Close - Door/window
Door
Sep 13, 2023 · Apt 3B
Close - Door/window
Door
Sep 13, 2023 · Apt 3B
Close - Door/window
Door
Sep 11, 2023 · Apt 3B
Close - Heat/hot water
Entire building
Sep 6, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 6, 2023 · Apt 2A
Close - Heat/hot water
Entire building
Sep 5, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 5, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Sep 4, 2023 · Apt 4B
Close - Heat/hot water
Entire building
Sep 4, 2023 · Apt BLDG
Close - Unsanitary condition
Pests
Jul 31, 2023 · Apt UNIT6
Close - Plumbing
Basin/sink
Jul 15, 2023 · Apt 3
Close - Door/window
Door
Feb 21, 2023 · Apt APT5
Close - Door/window
Door
Feb 21, 2023 · Apt APT5
Close - Door/window
Door
Feb 21, 2023 · Apt APT5
Close - General
Bell/buzzer/intercom
Feb 17, 2023 · Apt 4B
Close - Door/window
Door
Feb 17, 2023 · Apt 4B
Close - General
Bell/buzzer/intercom
Feb 15, 2023 · Apt 4B
Close - Door/window
Door
Feb 15, 2023 · Apt 4B
Close - Electric
Power outage
Jan 6, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 6, 2023 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jun 7, 2022 · Apt 4N
Close - Door/window
Door
Feb 2, 2022 · Apt BLDG
Close - Door/window
Door
Feb 2, 2022 · Apt 2A
Close - Heat/hot water
Entire building
Jun 9, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 8, 2021 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1910
- Floors
- 5
- Residential units
- 8
- Building area
- 9,344 ft²
- Lot area
- 3,250 ft²
- Zoning
- R7-2
- Community board
- 102
- Council district
- 2
- Block / lot
- 526 / 56
- Assessed value
- $2,902,500
- Landmark / historic district
- South Village Historic District
HPD registration #111416, last renewed Sep 26, 2025.
Questions about 186 Bleecker Street
Who owns 186 Bleecker Street?
The owner of record in NYC Department of City Planning PLUTO data is 186 Bleecker Property Owner LLC.
Does 186 Bleecker Street have violations?
Yes. NYC HPD has recorded 143 housing violations at this property.
Is 186 Bleecker Street rent stabilized?
NYC Department of Finance tax bills listed 5 rent-stabilized units here in 2024 (about 63% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 186 Bleecker Street built?
City records list 1910 as the year it was built.
How many apartments are in 186 Bleecker Street?
It has 8 residential units and 10 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.