41 East Houston Street
Manhattan, NY 10012BBL 1-00509-0019Map
Owner of record: Karass Mulberry 290, LLC
41 East Houston Street is an elevator apartment building built in 2007 in Manhattan, 10012. It has 9 residential units across 11 floors. The owner of record is Karass Mulberry 290, LLC. HPD has recorded 35 housing violations here, most recently on September 3, 2025. 28 of the 35 most recent violations are still open. City tax records listed 2 rent-stabilized apartments here in 2024.
- HPD violations
- 35
- DOB violations
- 23
- ECB violations
- 31
- HPD complaints
- 13
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 35
- BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east at south located at apt 7, 7th story, 1st apartment from east at south
Sep 3, 2025 · Apt 7
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 7, 7th story, 1st apartment from east at south
Sep 3, 2025 · Apt 7
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 22, 2024
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 7, 7th story, 1st apartment from south at west
Jul 5, 2024 · Apt 7
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the bathroom located at apt 7, 7th story, 1st apartment from south at west
Jul 5, 2024 · Apt 7
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling and south wall in the 6th room from north located at apt 7, 7th story, 1st apartment from south at west
Jul 5, 2024 · Apt 7
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 6th room from north located at apt 7, 7th story, 1st apartment from south at west
Jul 5, 2024 · Apt 7
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective hardwood floor in the private hallway located at apt 7, 7th story, 1st apartment from south at west
Jul 5, 2024 · Apt 7
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak underneath hardwood floors in the 7th room from north located at apt 7, 7th story, 1st apartment from south at west
Jul 5, 2024 · Apt 7
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective hardwood floors in the 7th room from north located at apt 7, 7th story, 1st apartment from south at west
Jul 5, 2024 · Apt 7
Open — Nov sent out
Show 25 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 7th room from north located at apt 7, 7th story, 1st apartment from south at west
Jul 5, 2024 · Apt 7
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the grout in between ceramic wall tiles at the south wall in the bathroom located at apt 7, 7th story, 1st apartment from south at west
Jul 5, 2024 · Apt 7
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective rubber gasket at window in the bathroom located at apt 7, 7th story, 1st apartment from south at west
Jul 5, 2024 · Apt 7
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling and east wall in the 1st room from north at west located at apt 7, 7th story, 1st apartment from south at west
Jul 5, 2024 · Apt 7
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 1st room from north at west located at apt 7, 7th story, 1st apartment from south at west
Jul 5, 2024 · Apt 7
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling and west wall in the 1st room from north at east located at apt 7, 7th story, 1st apartment from south at west
Jul 5, 2024 · Apt 7
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 1st room from north at east located at apt 7, 7th story, 1st apartment from south at west
Jul 5, 2024 · Apt 7
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the 3rd bathroom from north located at apt 7, 7th story, 1st apartment from south at west
Jun 23, 2024 · Apt 7
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from north located at apt 7, 7th story, 1st apartment from south at west
Jun 23, 2024 · Apt 7
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 7, 7th story, 1st apartment from south at west
Jun 23, 2024 · Apt 7
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north located at apt 7, 7th story, 1st apartment from south at west
Jun 23, 2024 · Apt 7
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the 3rd bathroom from north located at apt 7, 7th story, 1st apartment from south at west original violation 17067745 issued 23-jun-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jun 23, 2024 · Apt 7
Open — Nov certified late - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 3 sq ft at ceiling in the bathroom located at apt 7, 7th story, 1st apartment from south at west
Jun 7, 2024 · Apt 7
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 7, 7th story, 1st apartment from south at west
Jun 7, 2024 · Apt 7
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... approx 3 sq ft at ceiling in the bathroom located at apt 7, 7th story, 1st apartment from south at west original violation 17029662 issued 07-jun-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jun 7, 2024 · Apt 7
Open — First no access to re- inspect violation - BHazardous
Trace and repair the source and abate the visible mold condition... approx 10 sq ft at floor boards in the 1st room from north located at apt 7, 7th story, 1st apartment from south at west
Jun 7, 2024 · Apt 7
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective wood floors in the 1st room from east located at apt 7, 7th story, 1st apartment from south at west
May 12, 2024 · Apt 7
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 7, 7th story, 1st apartment from south at west
May 12, 2024 · Apt 7
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east at north located at apt 7, 7th story, 1st apartment from west at north
Dec 28, 2023 · Apt 7
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the bathroom located at apt 7, 7th story, 1st apartment from west at north
Dec 28, 2023 · Apt 7
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... approximately 15 sq ft at the floor in the 1st room from east at north located at apt 7, 7th story, 1st apartment from west at north
Dec 28, 2023 · Apt 7
Open — Nov certified late - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 2, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 10, 2022
Closed — Violation dismissed
DOB building violations · 23
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 23, 2021
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 21, 2017
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 6, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 20, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 20, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 28, 2013
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2011 inspection/test
Oct 1, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 25, 2012
Dob violation - resolved
Show 13 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 10, 2009
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 27, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Construction other optional
Work does not conform to approved plans noted: at time of inspection an active site foundation in progress along the south side with adj bldg house # 208 mulberry st plan shows soldier piles on east corner brace at west side on site corner brace has been removed remedy: conform or amend plans call sep/excavation 718 802-4594
Oct 29, 2007
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 22, 2007
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 6, 2007
Dob violation - dismissed - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Apr 3, 2007
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Mar 22, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed
ECB violations · 31
- Class - 2
Failure to maintain adequate housekeeping. noted: at 1st floor store front the market nyc non-braking partition made out of wood componentshave been removed and being stored building is occupied wood debris th
May 11, 2018 · Penalty $3,125
Resolve - Class - 2
Failure to file annual certification that cooling tower 1000003078 hasbeen inspected,tested,and disinfected and that a maintenance plan has been developed and implemented by november,1,2016.rem:file annual cert
Jun 20, 2017 · Penalty $1,000
Resolve - Class - 1
Electrical work w/o a permit. the entire storefront: subfeeder, subpanel, branch circuit wiring, receptacles on this, switches,lighting fix tures. not on file. m343925 does not guard the above work!!rmdy:obtain
Jan 15, 2016 · Penalty $1,630
Resolve - Class - 1
Licensed rigger failed to ensure scaffold worker met minimum requirements. noted: at time of inspection jose luis atancuri & andri komliev working on suspended scaffold at exp #1 w/o cert of fitness from licens
Mar 7, 2014 · Penalty $400
Resolve - Class - 2
Expired permit for temp. construction equipment. noted:upon inspectionfence permit expired #104626282fn 1-1-10. rem:renew permit.
Mar 6, 2012 · Penalty $4,000
Resolve - Class - 2
Sec. 105.8.2 expired permit for temp construction equipment. noted: upon inspection fence permit expire. #104626282 fn 1/1/10. remedy: renewpermit.
Dec 13, 2011 · Penalty $4,000
Resolve - Class - 2
Work w/o permit.expired permit.noted:the following conditions:fence permit#104626282 has expired on 1/1/10.a new permit is required for this 8ft plywood construction fence.fence must also remain clear from pos
Apr 13, 2011 · Penalty $4,000
Resolve - Class - 2
Failure to maintain building in code-compliant manner. noted: the following condition: the siamese connection located at the buildings facade are missing caps & are not color coded to indicate active or inactiv
Aug 26, 2010 · Penalty $500
Resolve - Class - 2
Work w/o a permit expired permit noted: the following conditions: fence permit #104626282 has expired on 1-1-10 & must be renewed: also there's no construction signage indicating the owner & emergency telephone
Aug 26, 2010 · Penalty $800
Resolve - Class - 1
Outdoor advertising company leasing or other making illegal advertising sign space available to others for advertising purposes! noted: job site fence found w/ the lamination of movie signs, etal for advertisin
Dec 28, 2009 · Penalty $10,000
Resolve
Show 21 more ↓
- Class - 1
Outdoor ad co. advertising sign not permitted in specified c 6-3 dist.noted: job site fences veneer found w/ the lamination of advertising movie signs, etal, @ various locations which are not permitted in speci
Dec 28, 2009 · Penalty $10,000
Resolve - Class - 1
Prohibited sign on const. fence noted : job site fence @ the above location found w/ the lamination of advertising movie signs etal. @ various location on surface! ie ( " spy next door " ) etal. remedy: remove
Dec 28, 2009 · Penalty $10,000
Resolve - Class - 1
Outdoor ad co sign on / display @ structure w/o permit noted: job sitefence found w/ the lamination of movie signs et al being non-illuminated in nature for advertising purpose. ir ( "spy next door") etal. reme
Dec 28, 2009 · Penalty $10,000
Resolve - Class - 1
Property owner acting as an outdoor advertising company failure to obtain a oac registration # while engaging in outdoor advertising business noted: @ const. job site fence found w/ advertising signs for movies
Dec 28, 2009 · Penalty $10,000
Resolve - Class - 2
Jobsite fence not constructed pursuant to subsection. defects noted: fence erected under permit # 104626282 exp. 1/01/10. found w/dislodged leaned & opened section & door open. egress toward sidewalk w/exposed
Dec 28, 2009 · Penalty $400
Resolve - Class - 2
Failure to provide/post signs at job site pursuant to subsection. noted: nb permit #104626282 work ongoing but no contractor sign on e houston street frontage. remedy: provide contractor's sign.
Feb 18, 2009
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations. no "no smoking" signs observed w/i construction site. noted: work ongoing under nb permit #104626282. signs not observed or
Feb 18, 2009 · Penalty $1,200
Resolve - Class - 2
Sec. bc 3301.9;rcny27-04. failure to provide a sign w/writing "to anonymously report unsafe conditions at this job site that endangers workers, call 311" on new bldg site. noted: work ongoing under nb permit
Feb 18, 2009
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperations. observed recent smoking refuse w/i construction site in violation of nyc fire code 1404.1. smoking refuse observed at fls 11,10
Feb 18, 2009 · Penalty $1,200
Resolve - Non-hazardous
Failure to provide handrails in stairway-upon insp constr of nb is in progress the bldg at roof level at time of inspc as noted handrails not provided in the stairwell from 1 fl to roof remedy stop all works in
Jun 5, 2008
Resolve - Non-hazardous
Storage & use of compressed volatile combustible gases upon insp as noted 10-12 containers of oxygen & acetylene gases are stored at the jobsite few container are fitted w/ hose & nozzle ready to use the flame
Jun 5, 2008
Resolve - Non-hazardous
Job site fence defective upon insp as noted 48ft high fence w/ chickenwire netting provided on e houston st side the gate provided at the c orner of e houston & mulbury st open swinging outwards thus blocking
Jun 5, 2008
Resolve - Non-hazardous
Failed to safeguard public & property upon inspc the bldg up to roof at time of inspc as noted side panels missing on both sides of hoist doors at all fls making the door latch accessible & possible to open fro
Jun 5, 2008
Resolve - Non-hazardous
No toe boards-upon insp const of nb is in progress at time of insp as noted the bldg up to roof level toe boards are missing in many places at all fl throughout the bldg along fl edges & fl openings remedy stop
Jun 5, 2008
Resolve - Hazardous
Safety netting damaged-upon inspc constr of nb in progress at time of inspc bldg up to roof level vertical safety netting in very bad shape torn ripped off & damaged throughout the bldg in all fl remedy stop al
Jun 5, 2008
Resolve - Hazardous
Operation of a defective crane co#3719 (boom truck) anti two block device not functioning. remedy: make all repairs and call 212 566-4693 for reinspection.
May 7, 2008 · Penalty $3,000
Resolve - Hazardous
Sec. 27-1021. no sidewalk shed. work being done under app #104626282 nb. work being done approx 40' high on bldg w/o sidewalk shed in place at time of inspection. permit issued for erection of shed att time of
Mar 3, 2008 · Penalty $2,000
Resolve - Hazardous
Sec. 27-1069. failure to provide permit on inspection for hazardous mixtures/materials. during inspection approx. 4 oxygen & acetylene tanksstored and 1 set in use not in cages or permit issued from fire dept.
Aug 22, 2007
Resolve - Hazardous
Failure to safeguard public & property effected by construction operation.on inspection excavation in progress & adjacent property(288 mulberry st)foundation,rubble wall approx 2' x 8' section was damage & was
Jun 6, 2007 · Penalty $1,000
Resolve - Hazardous
Failure to carry out demolition operations in a safe and proper manner.noted:feu ordered specific shoring & bracing and it was not executed & the structure collapsed.remedy:stop all work except to provide shori
Mar 31, 2007 · Penalty $2,000
Resolve - Non-hazardous
Sec:27-1036 failure to remove glass prior to demolition.noted:demolition has started at roof level.glass still remains thru-out 2nd fl.level all glass must be removed as per code.remedy:remove glass immediately
Mar 22, 2007 · Penalty $500
Resolve
Complaints
- Unsanitary condition
Mold
Feb 18, 2025 · Apt 7
Close - Door/window
Window frame
Feb 18, 2025 · Apt 7
Close - Unsanitary condition
Mold
Jun 20, 2024 · Apt 7
Close - Water leak
Damp spot
Jun 20, 2024 · Apt 7
Close - Paint/plaster
Ceiling
Jun 20, 2024 · Apt 7
Close - Unsanitary condition
Mold
May 20, 2024 · Apt 7
Close - Unsanitary condition
Mold
May 8, 2024 · Apt 7
Close - Unsanitary condition
Mold
Feb 28, 2024 · Apt 7
Close - Unsanitary condition
Mold
Dec 22, 2023 · Apt 7
Close - Water leak
Heavy flow
Dec 22, 2023 · Apt 7
Close
Show 3 more ↓
- Door/window
Window frame
Dec 22, 2023 · Apt 7
Close - Paint/plaster
Ceiling
Feb 2, 2021 · Apt APT8
Close - Electric
Power outage
Aug 29, 2018 · Apt 18
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2007
- Floors
- 11
- Residential units
- 9
- Building area
- 27,043 ft²
- Lot area
- 2,993 ft²
- Zoning
- C6-3
- Community board
- 102
- Council district
- 1
- Block / lot
- 509 / 19
- Assessed value
- $6,922,350
- Landmark / historic district
- No
HPD registration #143744, last renewed Aug 30, 2025.
Questions about 41 East Houston Street
Who owns 41 East Houston Street?
The owner of record in NYC Department of City Planning PLUTO data is Karass Mulberry 290, LLC.
Does 41 East Houston Street have violations?
Yes. NYC HPD has recorded 35 housing violations at this property.
Is 41 East Houston Street rent stabilized?
NYC Department of Finance tax bills listed 2 rent-stabilized units here in 2024 (about 22% of its 9 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 41 East Houston Street built?
City records list 2007 as the year it was built.
How many apartments are in 41 East Houston Street?
It has 9 residential units and 10 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.