roofy

284 Mulberry Street

Manhattan, NY 10012BBL 1-00509-0016Map

Owner of record: 284 Mulberry Street, LLC

284 Mulberry Street is a walk-up apartment building built in 1910 in Manhattan, 10012. It has 31 residential units across 7 floors. The owner of record is 284 Mulberry Street, LLC. HPD has recorded 437 housing violations here, most recently on October 22, 2024. 4 of the 50 most recent violations are still open. City tax records listed 13 rent-stabilized apartments here in 2024.

HPD violations
437
DOB violations
13
ECB violations
18
HPD complaints
920

What to know

Concern
4 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Oct 22, 2024

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
13
About 42% of the building's 31 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 437

  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 8, 3rd story, 1st apartment from east at south

    Oct 22, 2024 · Apt 8

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at front building entrance door

    Oct 11, 2024

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at entrance door to building , 1st story

    Sep 26, 2024

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked to basement at boiler room

    Apr 2, 2024

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 7, 2nd story, 3rd apartment from west at north

    Apr 2, 2024 · Apt 7

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of hot water exceeding 130 degrees at all hot water fixtures in the entire apartment located at apt 7, 2nd story, 3rd apartment from west at north

    Apr 2, 2024 · Apt 7

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective closer arm at fire door leading to south yard at public hall, 1st story

    Mar 30, 2024

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system boiler room door locked at basement

    Mar 30, 2024

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 21, 5th story, 1st apartment from west at north

    Mar 30, 2024 · Apt 21

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 21, 5th story, 1st apartment from west at north

    Mar 30, 2024 · Apt 21

    Closed — Violation dismissed
Show 40 more ↓
  • B

    Remove all encumbrances consisting of garbage bags at public hall, 1st story

    Apr 19, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 15, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 16, 2022

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 14, 4th story, 1st apartment from north at east

    Jan 5, 2022 · Apt 14

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 14, 4th story, 1st apartment from north at east

    Jan 5, 2022 · Apt 14

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 25, 6th story, 1st apartment from south at west

    Jan 3, 2022 · Apt 25

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 25, 6th story, 1st apartment from south at west

    Jan 3, 2022 · Apt 25

    Open — Notice of issuance sent to tenant
  • C

    Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods obstructed by the sidewalk shed at west building front at west at fire escape

    Jan 3, 2022

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 1st story

    Jun 9, 2021

    Closed — Violation dismissed
  • C

    Remove the illegal double cylinder key operated locking device at door .. in the entrance located at apt 25, 6th story, 1st apartment from south at west , section at north

    Jun 9, 2021 · Apt 25

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 25, 6th story, 1st apartment from south at west , section at north

    Jun 9, 2021 · Apt 25

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape window in the 1st room from east at north located at apt 8, 3rd story, 1st apartment from east at south

    Jun 9, 2021 · Apt 8

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 8, 3rd story, 1st apartment from east at south

    Jun 9, 2021 · Apt 8

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 21, 5th story, 1st apartment from west at north

    Jun 9, 2021 · Apt 21

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 21, 5th story, 1st apartment from west at north

    Jun 9, 2021 · Apt 21

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 13, 4th story, 1st apartment from east at south

    Jun 9, 2021 · Apt 13

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 1, 2021

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective fire retardant plaster at all walls at public hall, 2nd story

    Jan 24, 2020

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 2nd story

    Jan 24, 2020

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3, 2nd story, 1st apartment from south at west

    Jan 24, 2020 · Apt 3

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the south wall at public hall, 1st story

    Jan 24, 2020

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west and north wall in the 2nd room from north at east located at apt 3, 2nd story, 1st apartment from south at west

    Jan 24, 2020 · Apt 3

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 2nd room from north at west located at apt 3, 2nd story, 1st apartment from south at west

    Jan 24, 2020 · Apt 3

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st story

    Jan 24, 2020

    Closed — Violation dismissed
  • C

    Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 3, 2nd story, 1st apartment from south at west

    Jan 24, 2020 · Apt 3

    Closed — Violation dismissed
  • C

    Properly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 1st story

    Jan 24, 2020

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant plaster at south wall at public hall, 1st story

    Jan 24, 2020

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 2nd story

    Jan 24, 2020

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all walls at public hall, 2nd story

    Jan 24, 2020

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling and east wall at public hall, 1st story

    Dec 26, 2019

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling, east and north walls at public hall, 4th story

    Dec 26, 2019

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling and east wall at public hall, 3rd story

    Dec 26, 2019

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling and east wall at public hall, 3rd story

    Dec 26, 2019

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at east wall at public hall, 2nd story

    Dec 26, 2019

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective fire retardant material at east wall at public hall, 2nd story

    Dec 26, 2019

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 2nd story

    Dec 26, 2019

    Closed — Violation dismissed
  • C

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 2nd story

    Dec 26, 2019

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling and east wall at public hall, 1st story

    Dec 26, 2019

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling, east and north walls at public hall, 4th story

    Dec 26, 2019

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective vinyl floor tile in the private hallway located at apt 21, 5th story, 1st apartment from west at north

    Nov 26, 2019 · Apt 21

    Closed — Violation closed

DOB building violations · 13

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 31, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 31, 2018

    Dob violation - dismissed
  • Construction other optional

    Ftm.prem is 7s+cell detach steel frame w/masonry perim walls,mix use bldg on int lot.sidewalk vault in disrepair w/corroded steel fram,miss area of conc slabs,deter brownstone slabs.temp shor install w/o perm remedy:pe visit site immed eval sw vault&shor install.own prov temp shor&perm rprs und perm.file perm by 8/17/18.perm signoff by 8/31/18

    Jul 31, 2018

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - active
  • Construction other optional

    The borough commissioner has placed an administrative stop work order for application/permit# 121917532 due to the applicant of record withd rawing from the project. stop all work, make site safe, remove debris, contact borough commissioner office immediately

    Jan 16, 2018

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 23, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 23, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 23, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 23, 2017

    Dob violation - dismissed
Show 3 more ↓
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 15, 2010

    Dob violation - dismissed
  • Facade facade optional

    Ll11/98-local law 11/98 - facade facade optional

    Mar 19, 2009

    Dob violation - dismissed
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - active

ECB violations · 18

  • Class - 2

    Failure to submit an acceptable required cycle 8a report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control#800953. agg1 prior nov 37010237h under 28

    Apr 1, 2021 · Penalty $3,125

    Active
  • Class - 2

    Failure to maintain building in code compliant manner. noted, at the time of inspection i observed, electrical riser/wiring erected and exposed cellar to 6th floor level through public hallway. exposed electric

    Nov 27, 2019

    Resolve
  • Class - 1

    Reissue #35322998m date of issue 07/29/18. failure to maintain building in code-compliant manner. failure to maintain vault connected to building observed a sidewalk vault in disrepair supporting beams have ru

    Sep 28, 2018

    Resolve
  • Class - 1

    Failure to maintain vault connected to building. i observed a sidewalk vault in disrepair. supporting beams have rusted through and decayed. no structural support of sidewalk due to beams no longer in supportin

    Jul 29, 2018 · Penalty $1,250

    Resolve
  • Class - 1

    Work without a permit. at time of inspection shoring was installed to support sidewalk collapse above building vault. no design drawing. several steel columns supporting a 3" x 3" were erected on a 3" slab. sto

    Jul 29, 2018 · Penalty $800

    Resolve
  • Class - 2

    Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls & appurtenances required by 28-302.4 for control# 800953. rem: submit required technical report.

    May 18, 2018 · Penalty $625

    Active
  • Class - 2

    Failure to maintian exterior buiding walls and appurtenances.at time of inspection i observed on exposure#1 west elevation ac units inadeq uately supported with wooden blocks,objects on fire escape eroding mor

    Jan 3, 2018 · Penalty $500

    Active
  • Class - 1

    Failure to maintain bldg in code compliant manner, failure to provide number of required means of egress for every flr per bc 1018.1- 27-366for transient occupied bldg. rem: discontinue illegal occupancy.

    May 24, 2017 · Penalty $1,200

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner, lack of a system of automatic sprinklers where required per bc 903.2 - 27-954.1 intransient occupied bldg. rem:discontinue illegal occupancy.

    May 24, 2017 · Penalty $1,000

    Resolve
  • Class - 1

    Sec: bc 907.2.8. failure to maintain bldg in code compliant manner. failure to provide fire alarm system in transient occupied bldg. rem: discontinue illegal occupancy.

    May 24, 2017 · Penalty $1,600

    Resolve
Show 8 more ↓
  • Class - 2

    Permanent dwelling used/converted for other than permanent residentialpurposes dob records indicates premises legally approved class 'a' multiple dwelling now @ apt 4 illegally converted/occupied as transient u

    May 24, 2017 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to maintain building in a code-compliant manner: illumination for public corridors not working as per bc 1006.1;27-381 noted: at the2nd,3,4 & 5th fl. the emergency lighting units did not illuminate when

    Sep 21, 2010 · Penalty $1,000

    Resolve
  • Class - 2

    Failure to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report rem: file an amended report following remedial repair

    Jun 11, 2010 · Penalty $2,000

    Resolve
  • Class - 2

    Failure to file an amended sixth round report acceptable to this departmetn indicating correction of unsafe conditions described in initial local law 11/98 report. rem: file an amended report following remedial

    May 22, 2009 · Penalty $800

    Resolve
  • Class - 2

    Failure to submit an acceptable 6th round technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the d.o.b. rules & regulation

    Nov 28, 2008 · Penalty $800

    Resolve
  • Hazardous

    Failure to maintain exterior of bldg. west elevation shows plants, objects & bags blocking pathway on fire escape landing on the 7,5,4 & 3 fls, also blocks of wood under a/c units on the 6th fl.

    Oct 18, 2006 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to maintain exterior bldg. west elevation shows fl pots and objects on fire escape;blocks of wood and bricks under a/c units. remedy:make area safe, remove all flower pots and bags of objects from the

    May 10, 2006 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to maintain bldg. note: at north elevation approx. 6th flr. portion of metal stack vent approx. 4 ft long and approx. 18" in diameter dislodged and hanging precariously unsupported above and below secur

    Jan 1, 2006 · Penalty $800

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Aug 26, 2026 · Apt 15

    Close
  • Heat/hot water

    Entire building

    Jan 31, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 24, 2026 · Apt 9

    Close
  • Heat/hot water

    Entire building

    Jan 19, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 15, 2025 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Feb 28, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 29, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 29, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 19, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 19, 2025 · Apt BLDG

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Nov 20, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 12, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 29, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 25, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 20, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 19, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 10, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Sep 24, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 7, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 7, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 7, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 6, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 5, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 4, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 3, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 2, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 2, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 1, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 31, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 30, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 29, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 28, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 28, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 28, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 27, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 27, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Mar 27, 2024 · Apt 14

    Close
  • Heat/hot water

    Apartment only

    Mar 27, 2024 · Apt 14

    Close
  • Heat/hot water

    Entire building

    Apr 26, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 26, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Apr 23, 2023 · Apt 14

    Close
  • Heat/hot water

    Entire building

    Apr 23, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 19, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 17, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Apr 17, 2023 · Apt 14

    Close
  • Heat/hot water

    Apartment only

    Oct 30, 2022 · Apt 14

    Close
  • Unsanitary condition

    Pests

    Jan 3, 2022 · Apt 25

    Close
  • Plumbing

    Water supply

    Jan 3, 2022 · Apt 25

    Close
  • Unsanitary condition

    Mold

    Jan 3, 2022 · Apt 25

    Close
  • Plumbing

    Water supply

    Jan 3, 2022 · Apt 20

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1910
Floors
7
Residential units
31
Building area
18,682 ft²
Lot area
3,607 ft²
Zoning
C6-2
Community board
102
Council district
1
Block / lot
509 / 16
Assessed value
$1,765,350
Landmark / historic district
No

HPD registration #135053, last renewed Sep 22, 2025.

Questions about 284 Mulberry Street

Who owns 284 Mulberry Street?

The owner of record in NYC Department of City Planning PLUTO data is 284 Mulberry Street, LLC.

Does 284 Mulberry Street have violations?

Yes. NYC HPD has recorded 437 housing violations at this property.

Is 284 Mulberry Street rent stabilized?

NYC Department of Finance tax bills listed 13 rent-stabilized units here in 2024 (about 42% of its 31 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 284 Mulberry Street built?

City records list 1910 as the year it was built.

How many apartments are in 284 Mulberry Street?

It has 31 residential units and 33 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.