105 3 Avenue
Manhattan, NY 10003BBL 1-00469-7502Map
Owner of record: Name Not On File
105 3 Avenue is a condominium built in 1964 in Manhattan, 10003. It has 155 residential units across 17 floors. The owner of record is Name Not On File. HPD has recorded 21 housing violations here, most recently on August 1, 2023. 4 of the 21 most recent violations are still open. City tax records listed 15 rent-stabilized apartments here in 2024.
- HPD violations
- 21
- DOB violations
- 50
- ECB violations
- 30
- HPD complaints
- 47
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 21
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5k, 5th story, 4th apartment from south at west
Aug 1, 2023 · Apt 5K
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at compactor room at basement
Aug 1, 2023
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing kick down stand at door leading to south exist at basement.
Aug 1, 2023
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall
Aug 1, 2023
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Aug 1, 2023
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Aug 1, 2023
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall
Aug 1, 2023
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Aug 1, 2023
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
Aug 1, 2023
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at missing at public hall
Aug 1, 2023
Closed — Violation dismissed
Show 11 more ↓
- CImmediately hazardous
Abate the infestation consisting of roaches at public hall, 5th story
Jul 26, 2023
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 8, 2022
Closed — Violation dismissed - CImmediately hazardous
Abate the nuisance consisting of excessive storage of material papers, boxes, household items causing collyer conditions located at apt 5j, 5th story, 1st apartment from west at north
Sep 15, 2017 · Apt 5J
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jul 3, 2017
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jul 3, 2017
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jul 3, 2017
Open — Not complied with - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Jul 3, 2017
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jul 3, 2017
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jul 3, 2017
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jul 3, 2017
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 16, 2015
Closed — Violation dismissed
DOB building violations · 50
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Hazardous condition (facade) facade required
Cycle 9a unsafe report filed
Aug 24, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2022
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 20, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 20, 2020
Dob violation - resolved
Show 40 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - active - Elevator elevatorrequired
Violation issued to elevator-failureto file category 1 2017 inspection /test
Apr 5, 2019
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 28, 2018
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 25, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - active - Elevator elevatorrequired
Violation issued to elevator-failureto file category 1 2016 inspectiob /test
Sep 15, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 8, 2017
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 3, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 3, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 2, 2016
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 5, 2015
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 5, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 5, 2015
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2013 inspection/test
Oct 31, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 5, 2014
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 20, 2013
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 5, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 5, 2012
Dob violation - resolved - Facade facade optional
Ll11/98-local law 11/98 - facade facade optional
Jan 25, 2012
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 1, 2010
Dob violation - active - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 22, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 22, 2008
Dob violation - resolved - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 5, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 5, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 30, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 30, 2005
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active
ECB violations · 30
- Class - 2
At time of inspection i observed sws at exp#1 (3 avenue) was not build/maintained as per code, steel pipe/column out of plumb and missing mud sill. this creates a hazardous condition for posible colapse.comply
Jan 22, 2024 · Penalty $2,400
Resolve - Class - 1
Observed inadequate sidewalk shed in place at exposure 1, in contrary with the site safety plain and the code as it was not covering the area required, and creating an immediate hazardous to pedestrians and pro
Aug 24, 2022 · Penalty $2,500
Resolve - Class - 1
Site safety manager failed to notify the department of the suspended scaffold installation in contrary with codes, pedestrians protection contrary with site safety plain, no orientation was performed, creating
Aug 24, 2022
Resolve - Class - 1
Upon my request to review site safety orientation for the workers, working at the site, the permitholder failed to provide any document and records, in contrary with code and requirements. creating an immediate
Aug 24, 2022 · Penalty $2,500
Resolve - Class - 2
Building altered and occupied without a valid cofo. noted: building altered under alt-1 job # 120514014 and is occupied and temp cofo # 120514014t005 expired on 06/27/2012 and no new cofo obtained., obtain a va
Mar 10, 2022 · Penalty $1,250
Active - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35319585r issued on 09/07/18 & to file a cert of correction pursuant to 28-2011 & 1rcny 102-01(d)(2). remedy: file a cert of correction.
Jun 29, 2020 · Penalty $1,250
Resolve - Class - 1
Failure to have or maintain the daily log noted: @time of inspection of active site with 2 workers present no daily log on site/provided when requested. stop all work immediately make site safe.rem: provide
May 4, 2020 · Penalty $5,000
Resolve - Class - 1
Failure to designate and/or have a construction super present @site asrequired noted: @time of inspection on active site with 2 workers present observed no super and/or competent person present/designated @site
May 4, 2020 · Penalty $10,000
Resolve - Class - 1
Failure to ensure each worker has successfully completed the required traning noted: @time of inspection observed worker juan monoz an order failed to complete/provide the required the required osha training
May 4, 2020 · Penalty $5,000
Resolve - Class - 2
Failure to provide approved/accepted const documents @jobsite @time of inspection. noted: @time of inspection of active site no approved plans on site/provided when requested stop all work make site safe.
May 4, 2020
Resolve
Show 20 more ↓
- Class - 1
Work does not conform to approved documents. note: during time of inspection, kitchen and bathroom layout in apartment 4cd on the 4th floor does not conform with approved plans that are on-site for job #123869
Aug 9, 2019
Resolve - Class - 1
Work without electrical permit. note: during time of inspection observed electrical work performed throughout apartment 4cd on the 4th floor with no electrical permit issued for job#123869885, obtain permit; c
Aug 9, 2019 · Penalty $800
Resolve - Class - 2
Failure to notify the department , 72 hours prior to commencement of work; bc3303.10.2, comply with code; comply with notice of violation
Jul 2, 2019
Resolve - Class - 1
Failure to intsitute safety equipement measures or temporary construction no guardrail.17 story alt buidling at the time of my inspection i observed a 3 feet + opening in the parapet wall on the roof in exp 3.
Feb 13, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to take and provide safety measures sidewalk shed/netting etc where required to proect and secure public safety from documented protect and secure public safety from documented unsafe facade as per 1rcn
Sep 7, 2018 · Penalty $10,000
Active - Class - 2
Failure to maintain exterior bldg walls/facade & appurtenances.note:@time of insp i observed on the roof:step crack on parapet wall on south elev exp#4 facing north elev. seperation of joint/pulling of parapet
Jul 31, 2018 · Penalty $1,250
Resolve - Non-hazardous
Outdoor advertising co.failure to obtain permit for outdoor advertising sign.remedy:remove illegal signage
Oct 11, 2007
Resolve - Non-hazardous
Outdoor advertising co.with outdoor adver.sign prohibited in c1-9a zoning district.remedy:remove illegal signage
Oct 11, 2007
Resolve - Non-hazardous
Property owner acting as an outdoor adver.co.failure to obtain valid oac registration number while engaging in outdoor adver.busioness.remedy:remove illegal signage or obtain oac registration number
Oct 11, 2007
Resolve - Non-hazardous
Outdoor adver.co. with outdoor adver.sign exceeds the maximum surface area 150 sq ft in a c19a zoning.remedy:remove illegal signage
Oct 11, 2007
Resolve - Non-hazardous
Outdoor advert.co. with outdoor adver. sign exceeds the maximum heightrestriction of 25ft above curb level.remedt:remove illegal signage
Oct 11, 2007
Resolve - Non-hazardous
Outdoor adver.co.failure to affix decal bearing mea number or ul classification mark to outdoor advert.remedey:remove illegal signage
Oct 11, 2007
Resolve - Non-hazardous
Outdoor advert.co.failure to affix date of signs erection to outdoor advert.co.remedy:remove illegal signage
Oct 11, 2007
Resolve - Non-hazardous
Outdoor advert. co. failure to submit affidavit that outdoor advert. sign is made frpm fire retardent or non-combustible material.remedy:remove illegal signage
Oct 11, 2007
Resolve - Non-hazardous
Work without a permit work noted created an opening in masonry wall a t 1st floor rear ne and interior demolition of partitons without firstobtaining permited and approvals also noted framing columns with
Jul 8, 2004 · Penalty $250
Resolve - Non-hazardous
Work without a permit. noted: at roof level 2 wood frame decks constructed 1. front deck (westside) approx 10' long x15' wide. 2. rear deck (eastside) approx 6' long x15' wide. remedy: obtain all
Aug 10, 1998
Resolve - Non-hazardous
Failure to file a report of compliance with local law 16/84 certifyingto the installation of required fire protection systems. remedy: file report.
Aug 3, 1998 · Penalty $400
Resolve - Non-hazardous
Failure to provide elevator landing sign at basement. failure to pro- vide 3" high alphabetic letter of identification for: 1-elevator land-ing floor 1t17 &bsmt. 2-for staircases (a & b) on floor 1 to 17.
Aug 3, 1998
Resolve - Non-hazardous
73#,47l,57o,74#, (73) 5 year test & file elv.3 form & tag demees (47) and elimate cable rubbing limit swithches in pit (74) remove covers blocking smoke hole gratings in motor room
Apr 3, 1992
Resolve - Non-hazardous
73#,57o, (73) 5 year test & file elv. 3 form & tag devices (57) construction debms (74) remove covers blocking smoke hole greeting in motor room
Apr 3, 1992
Resolve
Complaints
- Unsanitary condition
Pests
Jul 30, 2023 · Apt 5K
Close - Unsanitary condition
Pests
Jul 17, 2023 · Apt 5K
Close - Heat/hot water
Apartment only
Feb 2, 2023 · Apt 10C
Close - Unsanitary condition
Pests
Jul 2, 2020 · Apt 5J
Close - Unsanitary condition
Garbage/recycling storage
Apr 7, 2020 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Mar 20, 2020 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Mar 20, 2020 · Apt 5J
Close - Unsanitary condition
Garbage/recycling storage
Jan 13, 2020 · Apt 5J
Close - Heat/hot water
Entire building
Nov 11, 2017 · Apt 8E
Close - Plumbing
Bathtub/shower
Sep 10, 2017 · Apt 5J
Close
Show 37 more ↓
- Unsanitary condition
Mold
Sep 10, 2017 · Apt 5J
Close - Unsanitary condition
Garbage/recycling storage
Jun 17, 2017 · Apt 5J
Close - Unsanitary condition
Mold
May 30, 2017 · Apt 5J
Close - Heat/hot water
Apartment only
Dec 30, 2015 · Apt 8E
Close - Heat/hot water
Entire building
Oct 21, 2015 · Apt 17A
Close - Heat/hot water
Apartment only
Feb 9, 2015 · Apt 8E
Close - Heat/hot water
Apartment only
Jan 23, 2015 · Apt 8E
Close - Heat/hot water
Apartment only
Jan 7, 2015 · Apt 8E
Close - Heating
Heat related
Jan 4, 2012 · Apt 6C
Close - Heating
Heat related
Dec 31, 2011 · Apt 6C
Close - Heating
Heat related
Dec 28, 2011 · Apt 6C
Close - Heating
Heat related
Dec 4, 2011 · Apt 6C
Close - Heating
Heat related
Nov 10, 2011 · Apt 6C
Close - Heating
Heat related
Oct 21, 2011 · Apt 6C
Close - Heating
Heat related
Oct 21, 2011 · Apt 6C
Close - Heating
Heat related
Oct 21, 2011 · Apt 6C
Close - Heating
Heat related
Oct 21, 2011 · Apt 6C
Close - General
Window guards
Apr 12, 2011 · Apt 15H
Close - General
Window guards
Apr 12, 2011 · Apt 15H
Close - Plumbing
Water-leaks
Aug 23, 2010 · Apt 706
Close - Heating
Heat related
Feb 14, 2010 · Apt 6C
Close - Heating
Heat related
Jan 17, 2010 · Apt 6C
Close - Heating
Heat related
Apr 22, 2009 · Apt 16B
Close - Heating
Heat related
Apr 22, 2009 · Apt BLDG
Close - General
Doors
Dec 14, 2008 · Apt BLDG
Close - General
Locks
Mar 16, 2008 · Apt BLDG
Close - Heating
Heat related
Feb 5, 2008 · Apt 6C
Close - Heating
Heat related
Feb 1, 2008 · Apt 6C
Close - Heating
Heat related
Jan 7, 2008 · Apt 6C
Close - General
Locks
Jan 5, 2008 · Apt BLDG
Close - Heating
Heat related
Dec 28, 2007 · Apt 6C
Close - Heating
Heat related
Dec 25, 2007 · Apt 6C
Close - Heating
Heat related
Nov 11, 2007 · Apt 6C
Close - Heating
Heat related
Jan 8, 2007 · Apt 6C
Close - Heating
Heat related
Dec 26, 2006 · Apt 6C
Close - Plumbing
Water supply
Dec 7, 2006 · Apt 17K
Close - Nonconst
Vermin
Jan 6, 2004 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 1964
- Floors
- 17
- Residential units
- 155
- Building area
- 125,097 ft²
- Lot area
- 10,512 ft²
- Zoning
- C1-9A
- Community board
- 103
- Council district
- 2
- Block / lot
- 469 / 7502
- Assessed value
- $17,907,750
- Landmark / historic district
- No
HPD registration #138759, last renewed Aug 25, 2025.
Questions about 105 3 Avenue
Who owns 105 3 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Name Not On File.
Does 105 3 Avenue have violations?
Yes. NYC HPD has recorded 21 housing violations at this property.
Is 105 3 Avenue rent stabilized?
NYC Department of Finance tax bills listed 15 rent-stabilized units here in 2024 (about 10% of its 155 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 105 3 Avenue built?
City records list 1964 as the year it was built.
How many apartments are in 105 3 Avenue?
It has 155 residential units and 157 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.