92 2 Avenue
Manhattan, NY 10003BBL 1-00447-0003Map
Owner of record: 92 Second Ave LLC
92 2 Avenue is a walk-up apartment building built in 1904 in Manhattan, 10003. It has 20 residential units across 6 floors. The owner of record is 92 Second Ave LLC. HPD has recorded 115 housing violations here, most recently on March 15, 2023. City tax records listed 2 rent-stabilized apartments here in 2024.
- HPD violations
- 115
- DOB violations
- 20
- ECB violations
- 22
- HPD complaints
- 188
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 115
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and the ceiling in the 2nd room from east located at apt 8, 3rd story, 2nd apartment from north at east
Jan 17, 2023 · Apt 8
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes restaurants shed obstructing drop ladder at west fire escape
Jan 3, 2023
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door at north leading to basement , 1st story
Jan 3, 2023
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of lockset installed at door to room with fire escape access in the 1st room from east at south located at apt 3, 2nd story, 1st apartment from north at east
Jan 3, 2023 · Apt 3
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of lockset installed at door to room with access to fire escape in the 1st room from east at south located at apt 11, 4th story, 1st apartment from north at east
Jan 3, 2023 · Apt 11
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 6, 2nd story, 2nd apartment from south at west
Dec 17, 2022 · Apt 6
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 6, 2nd story, 2nd apartment from south at west
Dec 17, 2022 · Apt 6
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 6, 2nd story, 2nd apartment from south at west
Dec 17, 2022 · Apt 6
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 6, 2nd story, 2nd apartment from south at west
Dec 17, 2022 · Apt 6
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding 130 degrees in the entire apartment located at apt 6, 2nd story, 2nd apartment from south at west
Dec 17, 2022 · Apt 6
Closed — Violation dismissed - CImmediately hazardous
Code: arrange and make self-closing the doors ... in the entrance located at apt apt20, 6th story, 2nd apartment from north at east
Nov 9, 2021 · Apt APT20
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 3rd room from east located at apt apt20, 6th story, 2nd apartment from north at east
Nov 9, 2021 · Apt APT20
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak ...at the ceiling in the 3rd room from east located at apt apt20, 6th story, 2nd apartment from north at east
Nov 9, 2021 · Apt APT20
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 7, 3rd story, 1st apartment from north at east
Oct 29, 2021 · Apt 7
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of freestanding radiator at public hall, 1st story
Oct 28, 2021
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from north located at apt 20, 6th story, 1st apartment from west at north
Oct 26, 2021 · Apt 20
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt 20, 6th story, 1st apartment from west at north
Oct 26, 2021 · Apt 20
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system wrong info on sign number is to office at cellar
Oct 24, 2021
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door to boiler room locked at cellar
Oct 24, 2021
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the 1st room from north at east located at apt 4, 2nd story, 2nd apartment from north at east
Oct 24, 2021 · Apt 4
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - ANon-hazardous
Refit building entrance door , 1st story
Dec 14, 2020
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors at building entrance at public hall, 1st story
Nov 2, 2020
Closed — Violation dismissed - CImmediately hazardous
Properly repair the broken or defective mortise lock at front entrance door to the building at public hall, 1st story
Aug 21, 2020
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story
Aug 21, 2020
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story
Aug 21, 2020
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective mechanical door lock at building entrance at public hall, 1st story
Aug 13, 2020
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked basement at boiler room
Dec 10, 2019
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5, 2nd story, 1st apartment from south at west
Dec 10, 2019 · Apt 5
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 2nd bathroom from east located at apt 5, 2nd story, 1st apartment from south at west
Dec 10, 2019 · Apt 5
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd bathroom from east located at apt 5, 2nd story, 1st apartment from south at west
Dec 10, 2019 · Apt 5
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5, 2nd story, 1st apartment from south at west
Dec 10, 2019 · Apt 5
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in washbasin waste line in the 1st bathroom from north located at apt 3, 2nd story, 1st apartment from north at east
Nov 13, 2019 · Apt 3
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at boiler room
Nov 3, 2019
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the household garbage boxes cans bottles .. at public hall stairs, 1st story
Nov 3, 2019 · Apt 5
Closed — Violation dismissed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures ,, in the kitchen located at apt 5, 2nd story, 1st apartment from east at south
Nov 3, 2019 · Apt 5
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5, 2nd story, 1st apartment from east at south
Nov 3, 2019 · Apt 5
Closed — Violation dismissed - ANon-hazardous
Provide place within the building for the storage of waste receptacles and disinfect same regularly., 1st story
Nov 1, 2019
Closed — Violation dismissed - ANon-hazardous
Post and maintain a street number on the front of the dwelling plainly visible from the sidewalk. at front areaway, 1st story
Nov 1, 2019
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the terrace located at apt 3, 2nd story, 1st apartment from north at east
Oct 29, 2019 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective stone floor tile in the terrace located at apt 3, 2nd story, 1st apartment from north at east
Oct 29, 2019 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of trash can under stairs at public hall, 1st story
Oct 29, 2019
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of air conditioner at south window at 3rd sty balcony at building front at fire escape
Oct 29, 2019
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of air conditioner at south window at 4th sty balcony at building front at fire escape
Oct 29, 2019
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of air conditioner at south window at 5th sty balcony at building front at fire escape
Oct 29, 2019
Closed — Violation dismissed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures .. in the entire apartment located at apt 5, 2nd story, 2nd apartment from east at south
Oct 10, 2019 · Apt 5
Closed — Violation closed - BHazardous
Provide approved metal screen below bulkhead skylight at public hall
May 14, 2019
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors bulkhead door at public hall
May 14, 2019
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of house hold items at public hall, 6th story
May 14, 2019
Closed — Violation closed
DOB building violations · 20
- Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Construction other optional
Failure to maintain building in code compliant matter. noted: defective front exp-1 fire escape step at 4th floor level. step is detached from one side and loose, and additional step is missing half a tread.
Feb 11, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 31, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 2, 2011
Dob violation - dismissed - Construction other optional
Work w/out permit
Jun 21, 2007
Vw*-violation - work w/o permit dismissed - Construction other optional
C-construction other optional
May 23, 2001
Vw*-violation - work w/o permit dismissed - Construction other optional
C-construction other optional
Aug 23, 2000
Vw*-violation - work w/o permit dismissed
Show 10 more ↓
- Construction other optional
C-construction other optional
Apr 6, 2000
Dob violation - active - Plumbing none
P-plumbing none
Apr 6, 2000
Dob violation - active - Plumbing none
P-plumbing none
Apr 6, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Electric signs none
Es-electric signs none
Apr 30, 1990
Dob violation - dismissed - Electric signs none
Es-electric signs none
Apr 30, 1990
Dob violation - dismissed
ECB violations · 22
- Class - 2
I observed within the six story bldg, all floor levels missing the numbering signs on walls and/or floor landing, to indicate the proper floor level for occupants, fdny and/or emergency services, property owner
Oct 17, 2024
Resolve - Class - 1
Failure to maintain building in code compliant matter. noted: defective front exp-1 fire escape step at 4th floor level. step is detached from one side and loose, and additional step is missing half a tread., r
Feb 11, 2022 · Penalty $1,250
Resolve - Class - 1
Work without a pemrit noted at the time of inspection observed at exposure (1) front of above premises an erected enclosed wodo combustible structure.vestible 10 of by 20 ft by 8 of in height commercial space c
Dec 29, 2020 · Penalty $6,250
Resolve - Class - 1
Failure to maintain; i observed in cellar of commercial area future gas connections that were plugged which is prohibited and not code complaint. , repair and/replace
Oct 9, 2019 · Penalty $1,250
Resolve - Class - 1
Bc3314.45.4 partial stop work order for suspended scaffolds in connection with c-hooks rope and all facade work issued pursuant to 28-207.2. note: at time of inspection, i observed two workers saquicela faustor
Jun 29, 2018 · Penalty $625
Resolve - Class - 2
Partial stop work order for suspended scaffold in connection with c-hooks rope. note: at time of inspection, i observed suspended scaffold in connection with c-hooks rope that is contrary to design drawing in p
Jun 29, 2018 · Penalty $625
Resolve - Class - 1
Filed a cert.of correction or other related materials contianing material false statements.resp'd filed a cert.of correction on 7th of april 2011 for nov#34879763j.upon inspec.of above address found that condi
Jul 28, 2011
Resolve - Class - 2
Failure to comply w/the comm's order to file a cert.of correction w/the dob for nov34879763jissued on 03/14/2011purusuant to 28-204.4 & 1rcny 102-01.remedy:file a certificate of correction
Jul 28, 2011
Resolve - Class - 1
Failure to provide unobstructed exit passageway; noted:passageway in basement of above address obstructed w/garbage,metal tankes(and plastic) bicycle.in case of emergency create difficulties to exit bldg.remedy
Jul 27, 2011 · Penalty $1,200
Resolve - Class - 3
Failure to maintain building to code-complaint manner. defect noted: at entrance of 92 2 ave exposure 1 stucco() & cracked. throughout diffeent location of entrance. remedy: repair & on replace.
Mar 14, 2011
Resolve
Show 12 more ↓
- Class - 1
Failure to provide unobstructed exit passageway: noted obstruction area: basement level passageway obstructed w/boxes & bicycle & containersmaking it difficult in a emergency to exit thru alleyway to exit to
Mar 14, 2011 · Penalty $1,200
Resolve - Class - 1
Sec 3314.6.2 misc viol: no protection of ropes/cables around sharp bends, corners made fast to guard sharp objects of surfaces. noted: upon inspection observed rope life lines tied to the steel angles attached
May 18, 2010 · Penalty $1,600
Resolve - Class - 1
Inadequate safety measure:oper'n crane/derrick/hoisting equip unsafe noted: rope life lines are tied to the steel angles on the fire escapecausing a hazardous condition. stop all work/do not remove equipment r
May 18, 2010
Resolve - Hazardous
Exit sign fail to meet building code requirement in that egress is notclearly defined no directional signs to show past of egress at the 1s t floor and basement levels.remedy:provide directional exit signs to
Sep 16, 2003 · Penalty $130
Resolve - Non-hazardous
Work without a permit(20% of work completed)noted:enclosure forming addition at rear of 1st fl.comm. space (d.b.a.east post restaurant)using woodjoists&studs,cmu & lollu columns, in progress under application 1
May 23, 2001 · Penalty $250
Resolve - Non-hazardous
Failure to carryout permitted work in accordance with applicable laws and regulations in that construction activities arebeing performed otherthan on weekdays between the hours of 7am & 6pm w/o a variance,as re
Oct 7, 2000
Resolve - Non-hazardous
Work without a permit. (20% of work completed). noted: demolition of partitions in first floor commercial space. hauling debris across sidewalk to dumpster on 2nd ave. location: dba: slam square, 1st fl. reme-
Aug 23, 2000 · Penalty $250
Resolve - Non-hazardous
Exit passageway or corridor: required width decreased by obstruction. noted: corridor used to store steel studs & approx 30 sheets of sheet-rock. location: 1st fl public corridor front entrance to rear exit.
Aug 23, 2000 · Penalty $2,500
Resolve - Non-hazardous
Location:basement laundry area.2 washing machines connected to waste piping without proper plumbing vent.plus flexible connector use to connect gas to dryers along with plastic dryer vent.violation:use or insta
Apr 6, 2000
Resolve - Non-hazardous
Location:basement laundry area.two gas fired cloths dryers installed without fire sprinkler protection.violation:failure to provide a systemof automatic sprinkler where required.remedy:provide automatic sprinkl
Apr 6, 2000
Resolve - Non-hazardous
Work without a permit noted at 1st floor level bar installation of sheetrock ceilings and soffit at rear kitchen area 2removal of kitchen cooktop equpment commercial 3installation if bar/countertop at kitchen
Mar 11, 1998
Resolve - Non-hazardous
Operation of a place of assembly noted at 1st floor level bar with seating and benches for approx 80 persons bar not in code compliance for a place of assembly sba block store bar remedy obtain a pa permit
Mar 11, 1998
Resolve
Complaints
- Water leak
Slow leak
May 24, 2026 · Apt 20
Close - Heat/hot water
Entire building
Feb 10, 2026 · Apt 8
Close - Heat/hot water
Entire building
Feb 10, 2026 · Apt 8
Close - Plumbing
Water supply
Feb 10, 2026 · Apt 7
Close - Plumbing
Water supply
Feb 10, 2026 · Apt 8
Close - Plumbing
Water supply
Feb 10, 2026 · Apt 8
Close - Plumbing
Water supply
Feb 10, 2026 · Apt 8
Close - General
Janitor/super
Feb 3, 2026 · Apt 12
Close - Heat/hot water
Apartment only
Jan 12, 2026 · Apt 7
Close - Heat/hot water
Entire building
Jan 12, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Jan 5, 2026 · Apt 7
Close - Heat/hot water
Entire building
Nov 11, 2025 · Apt 20
Close - Heat/hot water
Entire building
Nov 1, 2025 · Apt 2A
Close - Water leak
Slow leak
Sep 1, 2024 · Apt 20
Close - Heat/hot water
Entire building
Mar 24, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 20, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 26, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 26, 2023 · Apt 15
Close - Water leak
Slow leak
Oct 6, 2023 · Apt 12
Close - Heat/hot water
Entire building
May 2, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
May 2, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 23, 2023 · Apt 8
Close - Electric
No lighting
Apr 23, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 1, 2023 · Apt 13
Close - Safety
Smoke detector
Jan 16, 2023 · Apt 8
Close - Flooring/stairs
Floor
Jan 16, 2023 · Apt 8
Close - Paint/plaster
Ceiling
Jan 16, 2023 · Apt 8
Close - Water leak
Heavy flow
Jan 16, 2023 · Apt 8
Close - Heat/hot water
Entire building
Jan 15, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 15, 2023 · Apt 17
Close - Heat/hot water
Apartment only
Dec 14, 2022 · Apt 6
Close - Door/window
Door
Jun 22, 2022 · Apt 9
Close - Heat/hot water
Apartment only
Jan 19, 2022 · Apt 19
Close - Heat/hot water
Entire building
Jan 18, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 18, 2022 · Apt BUILDI
Close - Door/window
Door
Nov 14, 2021 · Apt 9
Close - Heat/hot water
Entire building
Nov 3, 2021 · Apt 9
Close - Heat/hot water
Apartment only
Nov 3, 2021 · Apt 9
Close - Heat/hot water
Entire building
Nov 3, 2021 · Apt 18
Close - Heat/hot water
Entire building
Nov 3, 2021 · Apt 17
Close - Heat/hot water
Entire building
Nov 3, 2021 · Apt 19
Close - Heat/hot water
Entire building
Nov 3, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 3, 2021 · Apt 18
Close - Heat/hot water
Entire building
Nov 3, 2021 · Apt 15
Close - Heat/hot water
Entire building
Nov 3, 2021 · Apt 18
Close - Heat/hot water
Entire building
Oct 29, 2021 · Apt 9
Close - Heat/hot water
Apartment only
Oct 29, 2021 · Apt 16
Close - Heat/hot water
Entire building
Oct 29, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 29, 2021 · Apt 19
Close - Heat/hot water
Apartment only
Oct 28, 2021 · Apt 7
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1904
- Floors
- 6
- Residential units
- 20
- Building area
- 19,894 ft²
- Lot area
- 4,850 ft²
- Zoning
- R7A
- Community board
- 103
- Council district
- 2
- Block / lot
- 447 / 3
- Assessed value
- $2,820,150
- Landmark / historic district
- East Village / Lower East Side Historic District
HPD registration #109734, last renewed Aug 25, 2025.
Questions about 92 2 Avenue
Who owns 92 2 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 92 Second Ave LLC.
Does 92 2 Avenue have violations?
Yes. NYC HPD has recorded 115 housing violations at this property.
Is 92 2 Avenue rent stabilized?
NYC Department of Finance tax bills listed 2 rent-stabilized units here in 2024 (about 10% of its 20 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 92 2 Avenue built?
City records list 1904 as the year it was built.
How many apartments are in 92 2 Avenue?
It has 20 residential units and 22 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.