211 Avenue A
Manhattan, NY 10009BBL 1-00441-0035Map
Owner of record: Village Jv 211 Avenue A LLC
211 Avenue A is a walk-up apartment building built in 1900 in Manhattan, 10009. It has 35 residential units across 6 floors. The owner of record is Village Jv 211 Avenue A LLC. HPD has recorded 85 housing violations here, most recently on February 3, 2026. 40 of the 50 most recent violations are still open. City tax records listed 8 rent-stabilized apartments here in 2024.
- HPD violations
- 85
- DOB violations
- 22
- ECB violations
- 32
- HPD complaints
- 170
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 85
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 15, 4th story, 1st apartment from east at south
Feb 3, 2026 · Apt 15
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Feb 3, 2026
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 19, 4th story, 2nd apartment from west at north
Oct 7, 2025 · Apt 19
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 19, 4th story, 2nd apartment from west at north
Oct 7, 2025 · Apt 19
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement
Jun 6, 2025
Open — Nov certified late - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 10, 3rd story
Jun 6, 2025 · Apt 10
Open — Nov certified late - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 10, 3rd story, 1st apartment from east at south
Apr 3, 2025 · Apt 10
Open — Not complied with - CImmediately hazardous
Provide ready access to buildings heating system locked door at basement at boiler room
Apr 3, 2025
Open — Not complied with - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 15, 4th story, 1st apartment from north at east
Dec 8, 2024 · Apt 15
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 15, 4th story, 1st apartment from north at east
Dec 8, 2024 · Apt 15
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective hard wood floor in the 1st room from north located at apt 19, 4th story, 2nd apartment from west at north
Aug 14, 2023 · Apt 19
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective window frame, first widow from north at east in the 1st room from north located at apt 19, 4th story, 2nd apartment from west at north
Aug 14, 2023 · Apt 19
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lower counter blance, at second window from north at east. in the 1st room from north located at apt 19, 4th story, 2nd apartment from west at north
Aug 14, 2023 · Apt 19
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective caulking at bathtub in the bathroom located at apt 19, 4th story, 2nd apartment from west at north
Aug 14, 2023 · Apt 19
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective escutcheon plate at heat riser in the bathroom located at apt 19, 4th story, 2nd apartment from west at north
Aug 14, 2023 · Apt 19
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 19, 4th story, 2nd apartment from west at north
Aug 14, 2023 · Apt 19
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 19, 4th story, 2nd apartment from west at north
Aug 14, 2023 · Apt 19
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape window in the 1st room from east located at apt 21, 4th story, 2nd apartment from east at south
Jul 16, 2023 · Apt 21
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of air conditioner in fire escape window obstructing egress in the 1st room from east located at apt 21, 4th story, 2nd apartment from east at south
Jul 16, 2023 · Apt 21
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 2nd story balcony, front stack
Jul 16, 2023
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range. in the kitchen located at apt 21, 4th story, 2nd apartment from east at south
Jun 17, 2023 · Apt 21
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 21, 4th story, 2nd apartment from east at south
Jun 17, 2023 · Apt 21
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 21, 4th story, 2nd apartment from east at south
Jun 17, 2023 · Apt 21
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 4, 2nd story, 2nd apartment from west at north
Dec 28, 2022 · Apt 4
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 4, 2nd story, 2nd apartment from west at north
Dec 28, 2022 · Apt 4
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage at public hall, 1st story
Jun 7, 2022
Open — Nov certified late - BHazardous
Cleanse and disinfect to the satisfaction of this department after removing the garbage at public hall, 1st story
Jun 7, 2022
Open — Nov certified late - CImmediately hazardous
Abate the infestation consisting of mice, 1st story
Jun 7, 2022
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - CImmediately hazardous
Code: arrange and make self-closing the doors , in the entrance located at apt 13, 3rd story, 1st apartment from south at west
Oct 3, 2021 · Apt 13
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 13, 3rd story, 1st apartment from south at west
Oct 3, 2021 · Apt 13
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 13, 3rd story, 1st apartment from south at west
Oct 3, 2021 · Apt 13
Open — Notice of issuance sent to tenant - BHazardous
Trace and repair the source and abate the visible mold condition... at east and west walls in the bathroom located at apt 19, 4th story, 2nd apartment from west at north
Aug 24, 2021 · Apt 19
Open — Defect letter issued - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 19, 4th story, 2nd apartment from west at north
Aug 24, 2021 · Apt 19
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchen located at apt 19, 4th story, 2nd apartment from west at north
Aug 24, 2021 · Apt 19
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 2nd room from north located at apt 19, 4th story, 2nd apartment from west at north
Aug 24, 2021 · Apt 19
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 19, 4th story, 2nd apartment from west at north
Aug 24, 2021 · Apt 19
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective vinyl floor tile in the 2nd room from north located at apt 19, 4th story, 2nd apartment from west at north
Aug 24, 2021 · Apt 19
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom located at apt 19, 4th story, 2nd apartment from west at north
Aug 24, 2021 · Apt 19
Open — Nov sent out - CImmediately hazardous
Replace with new the broken or defective east window upper sash glass pane in the 1st room from east located at apt 22, 5th story, 1st apartment from north at east
Jun 30, 2021 · Apt 22
Closed — Violation dismissed - ANon-hazardous
Refit south window upper and lower sash in the 1st room from east located at apt 22, 5th story, 1st apartment from north at east
Jun 30, 2021 · Apt 22
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling in the 1st room from east located at apt 22, 5th story, 1st apartment from north at east
Jun 30, 2021 · Apt 22
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 19, 334th story, 2nd apartment from west at north
Jun 18, 2021 · Apt 19
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the entire apartment located at apt 19, 4th story, 2nd apartment from west at north
Jun 18, 2021 · Apt 19
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the entire apartment located at apt 19, 4th story, 2nd apartment from west at north
Jun 18, 2021 · Apt 19
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - ANon-hazardous
Refit upper and lower window sashes in the entire apartment located at apt 29, 6th story, 1st apartment from east at south
Feb 2, 2021 · Apt 29
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the kitchen located at apt 33, 6th story, 1st apartment from west at north
Jan 29, 2021 · Apt 33
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the kitchen located at apt 33, 6th story, 1st apartment from west at north
Jan 29, 2021 · Apt 33
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... approximately 15 sq feet at ceiling in the kitchen located at apt 33, 6th story, 1st apartment from west at north
Jan 29, 2021 · Apt 33
Open — First no access to re- inspect violation
DOB building violations · 22
- Construction other optional
Failure to maintain building in a code compliant manner as per section 28.301.1 of the nyc admin code. at time of inspection numerous cracks & spalling brick work @ expsorues 1 & 2 continuous damage throughout water table at exposure 1. severe cracking at parapet at exposure 2 remedy: repair and/ or replace
Jan 30, 2026
Dob violation - active - Construction other optional
Failure to maintain building in a code compliant manner. at time of inspection observed spalling cracked concrete stone at water table at the bottom of 5fl window water table @ exp#1 and exp#2. at exp#2 observed cracked spalling stucco at parapet level. remedy: repair or replace
Aug 13, 2025
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 18, 2021
Dob violation - dismissed - Construction other optional
Emergency work order due to broken fire escape step/treads. observed substantially broken fire escape stairs. remedy/requirements: immed repair and or replace any missing, unstable or broken fire escape treads at the entire building. provide report from p.e on fire escape repair work on entire building. take and provide safety measures
Jun 4, 2021
Dob violation - active - Immediate emergency anythingoptional
Erect approximately 55 linear feet of sidewalk shed at exposure 1 and return at exposure 2 approximately 105 feet to safeguard the public and property
May 24, 2021
Dob violation - dismissed - Construction other optional
At time of inspection observed defective masonry facade at exposure 1 & 2
May 23, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 28, 2018
Dob violation - active - Construction other optional
Borough commisioner has issued a stop work order for application #120 429884 due to applicant withdrawal. unable to determine % of work comp peted
Nov 27, 2018
Dob violation - active - Construction other optional
Borough commissioner has issued a stop work order for job #120483066 d ue to applicant withdrawal. unable to determine % of work completed
Nov 27, 2018
Dob violation - active
Show 12 more ↓
- Construction other optional
The borough commissioner has issued a stop work order for application #120366648 due to withdrawal of applicant. stop all work immediately, make site safe, provide all required information to borough commission er's office forthwith
Jul 12, 2018
Dob violation - dismissed - Construction other optional
The borough commissioner has issued a stop work order for application #120200022 due to applicant withdrawal. stop all work immediately, mak e site safe, provide all required information to borough commissioner' s office forthwith
Jul 10, 2018
Dob violation - active - Construction other optional
The borough commissioner has issued a stop work order for application #122360220 due to audit objections pw-1 section 26. stop all work, mak e site safe, provide borough commissioner's office w/all required info rmation forthwith
May 30, 2018
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 25, 1990
Dob violation - active - Construction other optional
C-construction other optional
Oct 25, 1990
Vp-violation unserved ecb-active - Construction other optional
C-construction other optional
Oct 25, 1990
Dob violation - dismissed - Electric signs none
Es-electric signs none
Mar 7, 1989
Dob violation - dismissed - Electric signs none
Es-electric signs none
Mar 7, 1989
Dob violation - dismissed
ECB violations · 32
- Class - 2
Note: at time of inspection, i observed a sidewalk shed in place at expo# 1-2 with the deck not covering full width of the sidewalk at multiple locations, contrary to 3307.6.3. this creates inadequate pedestria
May 5, 2026 · Penalty $10,000
Active - Class - 1
Failure to provide an unobstructed exit passageway. note at time of inspection observed a ac unit laying on the fire escape at first level and other objects at exp #1 blocking east exit in case of emergency. re
Aug 13, 2025 · Penalty $625
Resolve - Class - 2
Failure to submit an acceptable required cycle 9c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #919043. remedy: submit acceptable requ
Apr 8, 2025 · Penalty $2,500
Resolve - Class - 1
Failure to provide unobstructed exit passageway.as noted:at time of inspection observed missing fire escape tread on exp #4 east elevation.remedy:remove obstruction by replacing new tread on fire escape where i
Jun 30, 2021 · Penalty $1,563
Resolve - Class - 1
Unlawful acts failure to comply with commissioner's order.at time of inspection respondent did not comply with commissioner's order by not removing obstruction of a passageway on fire escape.remedy:comply with
Jun 30, 2021
Resolve - Class - 2
Failure to maintain building code compliant manner.at time of inspection noted facade exp #1 and #2 cracks and or dislodged masonry at multiple locations.remedy:comply with code.
Jun 29, 2021 · Penalty $1,563
Active - Class - 1
Failure to provide unobstructed exit passageway.as noted at time of inspection i observed on exp4 north elevation missing and broken treads on several fire escapes on 5th and 2nd floor level.remedy:remove obstr
May 25, 2021 · Penalty $1,250
Resolve - Class - 1
Failure to maintain bldg wall(s) or appurtenances.noted:structure has defects in various location throughout facade. remedy:maintain exterior bldg wall.
May 23, 2021
Resolve - Class - 1
Filed a certificate form, application etc., containing a material false statement(s). noted: the owner/representative made false certifications on section #26 of pw1 job application #121596816, which was filed
Mar 21, 2018
Resolve - Class - 1
Filed a certificate form, application etc., containing a material false statement(s). noted: the owner/representative made false certifications on section #26 of pw1 job #122360220, which was filed on 04/07/15,
Mar 21, 2018
Resolve
Show 22 more ↓
- Class - 1
Filed a certificate form, application etc., containing a material false statement(s). noted: the owner/representative made false certifications on section #26 of pw1 job application #121596816, which was filed
Mar 21, 2018 · Penalty $5,000
Active - Class - 1
Filed a certificate form, application etc., containing a material false statement(s). noted: the owner/representative made false certifications on section #26 of pw1 job application #122360220, which was filed
Mar 21, 2018 · Penalty $2,500
Resolve - Class - 1
Oac sign on display structure w/o a permit levis rem: remove illegal work or obtain permit
Sep 10, 2010
Resolve - Class - 1
Oac sign on display structure w/o a permit no fee really ave a side rem: remove illegal work on obtain permit
Sep 10, 2010 · Penalty $10,000
Resolve - Class - 1
Oac sign on display structure w/o a permit no fee really e 13 st side rem: remove illegal work or obtain permit
Sep 10, 2010 · Penalty $10,000
Resolve - Class - 1
Property owner acting as an oac failure to obtain valid oac registration number while engaging in outdoor advertising business levis rem: remove illegal signage
Sep 10, 2010
Resolve - Class - 1
Property owner acting as an oac failure to obtain valid oac registration number while engaging in outdoor advertising business no fee really ave a side rem: remove illegal signage
Sep 10, 2010 · Penalty $25,000
Resolve - Class - 1
Property owner acting as a oac failure to obtain valid oac registration number while engaging in outdoor advertising business no fee really e 13st side rem: remove illegal signage
Sep 10, 2010 · Penalty $10,000
Resolve - Class - 1
Oac sign permitted in c1-6 district levis rem: remove illegal sign
Sep 10, 2010
Resolve - Class - 1
Oac sign not permitted in c1-6 district no fee really ave a side rem: remove illegal sign
Sep 10, 2010 · Penalty $10,000
Resolve - Class - 1
Oac advertising sign not permitted in c1-6 district no fee really e 13st side rem: remove illegal sign
Sep 10, 2010 · Penalty $10,000
Resolve - Class - 1
Oac sign in c1-6 district exceed surface area limits levis rem: removeor legalize sign
Sep 10, 2010
Resolve - Class - 1
Oac sign in c1-6 district exceed surface area limits no fee really ave a side rem: remove or legalize sign
Sep 10, 2010
Resolve - Class - 1
Oac sign in c1-6 district exceeds surface area limits no fee really e 13 st side rem; remove on legalize sign
Sep 10, 2010 · Penalty $25,000
Resolve - Class - 1
Oac leasing or otherwise making illegal advertising sign space available to others for advertising purposes levis rem: remove or legalize sign
Sep 10, 2010
Resolve - Class - 1
Oac leasing or otherwise making illegal advertising sign space availa ble to others for advertising purposes no fee really ave a side rem: remove or legalize sign
Sep 10, 2010
Resolve - Class - 1
Oac leasing or otherwise making illegal advertising sign space available to others for advertising purposes no fee really e 13 st side rem: remove or legalize sign
Sep 10, 2010
Resolve - Class - 1
Oac sign on display structure w/o a permit levis rem; remove illegal work or obtain permit
Sep 10, 2010 · Penalty $25,000
Resolve - Class - 1
Oac advertising sign not permitted in c1-6 district levis rem: remove illegal sign
Sep 10, 2010 · Penalty $25,000
Resolve - Class - 1
Oac sign in c1-6 district exceeds surface area limits levis rem: remove or legalize sign
Sep 10, 2010
Resolve - Class - 1
Oac leasing or otherwise making illegal advertising sign space available to other for advertising purposes levis rem: remove or legalize sig
Sep 10, 2010
Resolve - Non-hazardous
Occupancy contrary to that allowed by dept of bldg records.ground level is occupied as an eating & drinking establishment for less then 75 persons & employing dancers for entertainment.a use not allowed w/o a
Feb 24, 2007
Resolve
Complaints
- Unsanitary condition
Pests
Jan 30, 2026 · Apt 19
Close - Unsanitary condition
Pests
Jan 30, 2026 · Apt 19
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 30, 2026 · Apt 19
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt 18
Close - Heat/hot water
Entire building
Nov 11, 2025 · Apt 28
Close - Heat/hot water
Entire building
Nov 1, 2025 · Apt 28
Close - Unsanitary condition
Mold
Sep 22, 2025 · Apt 19
Close - Unsanitary condition
Pests
Sep 22, 2025 · Apt 19
Close - Heat/hot water
Entire building
Apr 1, 2025 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Mar 1, 2025 · Apt 13
Close - Heat/hot water
Entire building
Feb 13, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 6, 2024 · Apt 7
Close - Heat/hot water
Entire building
Dec 6, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 5, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 3, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 3, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 28, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 17, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 16, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 16, 2024 · Apt BLDG
Close - Paint/plaster
Wall
May 23, 2024 · Apt 13
Close - Heat/hot water
Entire building
Apr 30, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 30, 2024 · Apt 28
Close - Paint/plaster
Ceiling
Apr 4, 2024 · Apt 13
Close - Heat/hot water
Entire building
Jan 27, 2024 · Apt 7
Close - Heat/hot water
Entire building
Jan 27, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 27, 2024 · Apt 28ONTH
Close - Heat/hot water
Entire building
Jan 27, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 27, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 27, 2024 · Apt 15
Close - Heat/hot water
Entire building
Jan 27, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2024 · Apt BLDG
Close - Plumbing
Water supply
Jan 26, 2024 · Apt BUILDI
Close - Heat/hot water
Entire building
Jan 26, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 11, 2023 · Apt 13
Close - Unsanitary condition
Pests
Aug 11, 2023 · Apt 19
Close - Flooring/stairs
Floor
Aug 11, 2023 · Apt 19
Close - Door/window
Window frame
Aug 11, 2023 · Apt 19
Close - Unsanitary condition
Pests
Aug 11, 2023 · Apt 19
Close - Flooring/stairs
Floor
Aug 11, 2023 · Apt 19
Close - Appliance
Electric/gas range
Aug 11, 2023 · Apt 19
Close - Unsanitary condition
Mold
Aug 11, 2023 · Apt 19
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1900
- Floors
- 6
- Residential units
- 35
- Building area
- 23,984 ft²
- Lot area
- 5,171 ft²
- Zoning
- C1-6A
- Community board
- 103
- Council district
- 2
- Block / lot
- 441 / 35
- Assessed value
- $5,500,350
- Landmark / historic district
- No
HPD registration #105913, last renewed Aug 30, 2025.
Questions about 211 Avenue A
Who owns 211 Avenue A?
The owner of record in NYC Department of City Planning PLUTO data is Village Jv 211 Avenue A LLC.
Does 211 Avenue A have violations?
Yes. NYC HPD has recorded 85 housing violations at this property.
Is 211 Avenue A rent stabilized?
NYC Department of Finance tax bills listed 8 rent-stabilized units here in 2024 (about 23% of its 35 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 211 Avenue A built?
City records list 1900 as the year it was built.
How many apartments are in 211 Avenue A?
It has 35 residential units and 38 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.