418 East 12 Street
Manhattan, NY 10009BBL 1-00439-0017Map
Owner of record: NYC Department Of Education
418 East 12 Street is a school building built in 1923 in Manhattan, 10009. The owner of record is NYC Department Of Education. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 44
- ECB violations
- 117
- HPD complaints
- 4
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 44
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)
Jun 20, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 8, 2021
Dob violation - resolved - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2019
Jun 29, 2020
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 2018
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 16, 2017
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed
Show 34 more ↓
- Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 2, 2016
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2013 inspection/test
Oct 31, 2014
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 17, 2013
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 17, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 5, 2010
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 8, 2009
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 2, 2008
Dob violation - resolved - Emergency power none
Ll2604e-emergency power none
Mar 31, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - active - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 2, 2007
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Oct 1, 2005
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 21, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed
ECB violations · 117
- Class - 2
Reissue#35724601r failure to maintain building in code-compliant manner.noted:at cellar level observed in boiler room electric meter room & several other areas the walls are porous from water damage,creating si
Aug 7, 2026 · Penalty $3,125
Active - Class - 2
Reissue#35724600p failure to maintain building in code-compliant manner.noted:interior fpsc doors do not self-close properly at 5th flr-gym doors on both sides,staircase i,h.4th flr-staircase h,j,c,e,smoke door
Aug 7, 2026 · Penalty $3,125
Active - Class - 2
Reissue#3593274j failure to maintain building in code-compliant mannernoted:on 12th st entrance handrails are missing along the walls on either side of steps.rem:repair and/or replace.
Aug 7, 2026 · Penalty $3,125
Active - Class - 2
Reissue#35693272x exit door not self-closing.noted:at the time of inspection observed exterior exit 4 does not self-close properly when tested.rem:repair/replace door.
Aug 7, 2026 · Penalty $1,562
Active - Class - 2
Re-issue #35688940x. failure to maintain building in code-compliant manner. illumination for exit, exit discharges and public corridors as per bc 1006.1; 27-381. several emergency lights were not operational wh
Aug 27, 2025 · Penalty $3,125
Resolve - Class - 2
Re-issue #35688939z. failure to maintain building in code-compliant manner. noted at the 12th street entries, no handrails at left and rightsides against the walls. remedy: repair/replace, provide handrails.
Aug 27, 2025 · Penalty $3,125
Active - Class - 2
Re-issue #35688944n. failure to maintain building in code-compliant manner. noted: at the cellar level, boiler rm, electrical rm, and other areas, the walls are peeling, cracking and damaged from water/moisture
Aug 27, 2025 · Penalty $3,125
Active - Class - 2
Re-issue #35688938r. failure to maintain building in code-compliant manner. noted: there are several doors throughout the school that need repair. they are not closing properly. remedy: repair/replace doors.
Aug 27, 2025 · Penalty $3,125
Active - Class - 2
Re-issue #35688941h. exit door not self-closing. noted: there are several doors scattered throughout the school that are not self-closing asthey should. remedy: repair/replace.
Aug 27, 2025 · Penalty $1,562
Active - Class - 2
Re-issue #35688943l, #35688942j-failure to maintain building in code-compliant manner. noted: at several stairways and bulkheads throughout the school, there are cracks, peeling, spalling that need repairs to w
Aug 27, 2025 · Penalty $3,125
Resolve
Show 40 more ↓
- Class - 2
28-301.1. re-issue #35677324z. unlawful display of or placement of furnishings, decorations, or other objects at exits that obstruct access to, egress from or visibility thereof per fdny 2008 code; fc 1027.4. n
Aug 27, 2025 · Penalty $3,125
Resolve - Class - 2
Failure to maintain building in code-compliant manner.observed at 5 floor gym entrance,505,4 fl 402,404,405,409b,415,2 fl 209,1 fl girls bathroom by 114,cafeteria by stair a,h and exit 5,kitchen entrance,baseme
Sep 19, 2024 · Penalty $625
Active - Class - 2
Reissue#35674759y failure to maintain building wall(s)or appurtenancesobserved at front entrance stairs on 12 street missing handrails both sides of exterior stairs.rem:maintain exterior building walls.
Sep 19, 2024 · Penalty $3,125
Active - Class - 2
Failure to maintain building in code-compliant manner.illumination forexits,exit discharges and public corridors per bc 1006.1;27-381.observed at 5 floor box#5 5.1,5,3,5.4,3 fl stair c,1 fl 1.1,15,b.1 emergency
Sep 19, 2024 · Penalty $625
Resolve - Class - 2
Failure to maintain building in code-compliant manner. observed at cellar level boiler room, electrical room walls in disrepair and water penetration throughout. remedy: repair and/or replace.
Sep 19, 2024 · Penalty $625
Active - Class - 2
Failure to maintain builing in code-compliant manner. observed at stairwells, hallways, interior exits, cracks and spalling walls and ceilings, auditorium right outside stair h and g ceiling has hole missing pl
Sep 19, 2024 · Penalty $625
Active - Class - 2
Exit door not self-closing.observed at 5 floor smoke stair h,f 4 fl stair e,f,j,h,3 fl stair h,2 fl stair d,f,1 fl stair h exit 1,6 basementauditorium and exit 4 doors are not closing properly.rem:repair/replac
Sep 19, 2024 · Penalty $625
Active - Class - 2
Failure to maintain building in code-compliant manner.observed at bulkheads stair a,b,e,f,i,j cracks and spalling at ceiling,walls and landings.rem:repair and/or replace.
Sep 19, 2024 · Penalty $625
Resolve - Class - 2
Reissue #35655147j failure to maintain building in code-compliant manner; illumination for exits, exit discharges and public corridors per bc 1006.1,27-381. at time of inspection i observed at basement leve, at
Apr 28, 2023 · Penalty $625
Resolve - Class - 2
Reissue #35655146h failure to maintain building wall(s) or appurtenances. at time of my inspection i observed that at the front entrance stairs on 12th street side both exit handrails exterior stairs violation
Apr 28, 2023 · Penalty $6,250
Active - Class - 2
Failure to maintain building in code compliant manner.at the time of inspection,i observed that at 5th floor girls gym,one exit door is closed(storage)need to clear to make it usable.remedy:remove all.make it c
May 19, 2022 · Penalty $625
Resolve - Class - 2
Exit door not self-closing properly at the time of inspection at basement level,one exit in auditorium right side of stage,at 1st floor exit6,one exit door not self-closing properlt.at 1st floor exit 5 not clos
May 19, 2022 · Penalty $625
Resolve - Class - 2
Failure to maintain building in code compliant manner.illumination forexits,exit discharges and public corridors per bc1006.1;27-381.at basement level,auditorium 15 emergency exit lights are not operational at
May 19, 2022 · Penalty $625
Resolve - Class - 2
Reissue#35558077z date:04.28.2021 failure to maintain building wall(s)or appurtenances at the time of inspection i observed that at the front entrance stairs on 12th street side both exit handrails exterior sta
May 19, 2022 · Penalty $3,125
Active - Class - 1
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc . this is a controller feature which ensures passengers safety remedy ,file application ,install dlm
Jun 22, 2021 · Penalty $1,250
Resolve - Class - 2
Reissue#35495772p failure to maintain bldg in code compliant manner. noted: at time of my inspection,i observed at the front entrance stairson 12th street side both exit handrails exterior stairs on 12th street
Apr 28, 2021 · Penalty $3,125
Active - Class - 2
Reissue#35422110z failure to maintain bldg in code compliant manner. noted: at time of inspection i observed at cellar at gas meter room 6sq ft of damage dry wall of ceiling due to water penetration creating pa
May 29, 2020 · Penalty $1,562
Resolve - Class - 2
Reissue#35415247y failure to maintain bldg in code compliant manner. noted: at time of inspection i observed at the front stairs on 12 street side both exit handrails exterior stairs on 12 street missing from
May 29, 2020 · Penalty $3,125
Active - Class - 1
97 x 17,
Mar 9, 2020 · Penalty $1,250
Resolve - Class - 1
97x10: (97-x-10) elevator out of service. remedy: return elevator backto service
Jan 27, 2020 · Penalty $1,250
Resolve - Class - 2
Reissue#35360176k date of issue 4/14/18 failure to maintain building in code-compliant manner at cellar gas meter room 6 sq ft of damage drywall ceiling due to water penetration creating partial ceiling collaps
Apr 22, 2019
Resolve - Class - 2
Reissue#35253473n date of issue 4/26/17 failure to maintain building in code compliant manner use of prohibited door or hardware per bc 1008.1.8 27-371(j) illegal hardware includes use of kick stops,bolts,&chai
Apr 22, 2019
Resolve - Class - 2
Reissue#35325064m date of issue 3/14/18 failure to maintain building wall(s) or appurtenances. missing handrails exterior stairs 12 st side of school both exit locations. remedy: maintain exterior building wall
Apr 22, 2019
Active - Class - 2
Reissue #35253577h failure to maintain building in code compliant manner. bldg fold doors 2 in gym in disrepairs (5th fl). remedy: repair and/or replace
Apr 22, 2019
Resolve - Class - 2
28-301.1 reissue#35325066x date of issue 3/14/18 unlawful placement offurnishings decorations or other objects at exits that obstruct accessto egress from of visibility there of per fdny 2008 code;fc 1027.4. at
Apr 22, 2019
Resolve - Class - 2
Reissue #35253577h. failure to maintain building in code-compliant manner. at 5th floor gymnasium fold-out doors damaged and in disrepair. rem: repair/replace.
Mar 14, 2018
Resolve - Class - 2
Reissue #35253472l. failure to maintain building walls or appurtenances. missing handrails exterior stairs 12th street side of school both exit locations. rem: maintain building walls or appurtenances.
Mar 14, 2018
Active - Class - 2
Reissue #35253473n. failure to maintain building in code-compliant manner. use of prohibited door and/or hardware per bc1008.1.8; 27-371(j). 5th floor, room 501a kickstand. rem: provide legal hardware.
Mar 14, 2018
Resolve - Class - 2
Reissue #35253576x. failure to maintain building in code-compliant manner. illumination for exits, exit discharges and public corridors bc1006.1; 27-381. emergency lights not operational when tested at 5th floo
Mar 14, 2018
Resolve - Class - 2
Occupancy contrary to certificate of occupancy or dept of buildings records. at 5th floor near room #514 a closet has been turned into a classroom, room has no windows. also, door has illegal door hardware slid
Mar 14, 2018
Resolve - Class - 2
28-301.1 unlawful placement of furnishings, decorations or other objects at exits that obstruct access to egress or visibility thereof as per fdny (2008) fc1027.4. at 4th floor flags and/or banners hanging from
Mar 14, 2018
Resolve - Class - 2
Failure to maintain building in code-compliant manner. at cellar, gas meter room approx. 5sqft of 3 coat plaster ceiling has delaminated and fallen from ceiling to floor. rem: repair/replace.
Mar 14, 2018
Resolve - Class - 2
Failure to maintain in bldg code compliant manner: illumination for exits, exit discharges & public corridors per bc 1006.1; 27-381. existing emergency light are not operational when tested. gym exit sign light
Apr 26, 2017
Resolve - Class - 2
Failure to maintain bldg in code compliant manner: use of prohibited door &/or hardware per bc 1008.1.8; 27-371(j). illegal hardware includes use of kick stops, bolts, & chains on fpsc doors. room 501a, 5th flr
Apr 26, 2017
Resolve - Class - 2
Sec: bc 28-301.1 unlawful placement of furnishings, decorations or other objects @ exits that obstruct access to egress from or visibility threof per fdny 2008 code; fc 1027.4 outside of room 202 large mobile t
Apr 26, 2017
Resolve - Class - 2
Exit door not self closing, exit 2 all 4 doors not close properly, bulkhead exit 'e' 5th flr stair 'i', exit 4 on 5th flr, 3rd flr stair exit 'f', stair exit 'g', swing out doors, 2nd flr exit 'f', exit '6' mai
Apr 26, 2017
Resolve - Class - 2
Failure to maintain bldg wall(s) or appurtenances reissue# 3520109y (class 2) 8/5/2016; missing (exterior) handrails far left & far right w/ 13 & 14 riser. rem: replace handrails.
Apr 26, 2017
Active - Class - 2
Failure to maintain bldg in code compliant manner: bi-fold doors 2 in gym in disrepairs (5 flr). rem: repair &/or replace.
Apr 26, 2017
Resolve - Class - 2
Reissue: 35094051h. failure to maintain building wall(s) or appurtenances. noted: missing exterior handrails. at east 12 street entry.missing handrails far left and far right with 13 and 14 riser.rmdy: replace
Aug 5, 2016
Active - Class - 2
Bc3307.6.5 failure to maintain adequate illumination beneath sidewalk shed as required by code.note sidewalk shed erected under job#103647207 along exp,has inoperable bulb rendering affected area visibly dark &
Jan 2, 2016 · Penalty $400
Resolve
Complaints
- Heat/hot water
Entire building
Oct 3, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 9, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 9, 2020 · Apt BLDG
Close - Plumbing
Water supply
Mar 3, 2006 · Apt 1W
Close
Sales history
No recorded sales in our data
Building details
- Building type
- School building (W1)
- Year built
- 1923
- Floors
- 5
- Residential units
- —
- Building area
- 180,688 ft²
- Lot area
- 36,137 ft²
- Zoning
- R8B
- Community board
- 103
- Council district
- 2
- Block / lot
- 439 / 17
- Assessed value
- $11,085,750
- Landmark / historic district
- No
Questions about 418 East 12 Street
Who owns 418 East 12 Street?
The owner of record in NYC Department of City Planning PLUTO data is NYC Department Of Education.
Does 418 East 12 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 418 East 12 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 418 East 12 Street built?
City records list 1923 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.