417 East 12 Street
Manhattan, NY 10009BBL 1-00440-0051Map
Owner of record: Adeia Associates
417 East 12 Street is a walk-up apartment building built in 1920 in Manhattan, 10009. It has 15 residential units across 6 floors. The owner of record is Adeia Associates. HPD has recorded 36 housing violations here, most recently on October 2, 2025. 19 of the 36 most recent violations are still open.
- HPD violations
- 36
- DOB violations
- 103
- ECB violations
- 32
- HPD complaints
- 32
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 36
- ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration gas-fired boilers not venting to open air at 1st and 2nd room from south at west at public hall, 4th story
Oct 2, 2025
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration gas-fired boilers not venting to open air at 1st and 2nd room from south at west at public hall, 6th story
Oct 2, 2025
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration gas-fired boilers not venting to open air at 1st and 2nd room from south at west at public hall, 5th story
Oct 2, 2025
Open — Nov sent out - CImmediately hazardous
§ 12 m/d law discontinue the storage of combustible material construction material and personal items in 1st and 2nd rooms from south at west at public hall, 5th story
Oct 2, 2025
Closed — Violation closed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration gas-fired boilers not venting to open air at 1st ,2nd and 3rd rooms from south at west and 1st room from north at east at public hall
Oct 2, 2025
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration gas-fired boilers not venting to open air at 1st and 2nd room from south at west at public hall, 3rd story
Oct 2, 2025
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration gas-fired boilers not venting to open air at 1st and 2nd room from south at west at public hall, 2nd story
Oct 2, 2025
Open — Nov sent out - CImmediately hazardous
§ 12 m/d law discontinue the storage of combustible material construction material and personal items in 1st and 2nd rooms from south at west at public hall, 2nd story
Oct 2, 2025
Closed — Violation closed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration gas-fired boilers not venting to open air at 1st and 2nd room from south at west at public hall, 1st story
Oct 2, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges and door at south door of bulkhead located at public parts
Oct 2, 2025
Closed — Violation closed
Show 26 more ↓
- BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the entire south roof located at public parts
Oct 2, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling of bulkhead landing located at public parts
Oct 2, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling of bulkhead landing located at public parts
Oct 2, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at north door of bulkhead located at public parts
Oct 2, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at 1st boiler room from south at west in the boiler room located at public parts, 6th story, 1st section from south at west
Oct 2, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges and door in the laundry room located at public parts
Oct 2, 2025
Closed — Violation closed - CImmediately hazardous
§ 12 m/d law discontinue the storage of combustible material construction material and personal items in 1st and 2nd rooms from south at west at public hall, 4th story
Oct 2, 2025
Closed — Violation closed - CImmediately hazardous
§ 12 m/d law discontinue the storage of combustible material construction material and personal items in 1st and 2nd rooms from south at west at public hall, 1st story
Oct 2, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4a, 4th story, 1st apartment from east at south
Oct 2, 2025 · Apt 4A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door in the entrance located at apt 6a, 6th story, 1st apartment from east at south
Oct 2, 2025 · Apt 6A
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of wood floor decking on south roof located at public parts
Oct 2, 2025
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak over ceiling of bulkhead landing located at public parts
Oct 2, 2025
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch set at north door of bulkhead located at public parts
Oct 2, 2025
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the entire north roof located at public parts
Oct 2, 2025
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the boiler room located at public parts, 6th story, 1st section from south at west
Oct 2, 2025
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing hook and eye at building entrance door interior at public hall
Oct 2, 2025
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of stove and dishwasher at public hall, 4th story
Oct 2, 2025
Open — Nov sent out - CImmediately hazardous
§ 12 m/d law discontinue the storage of combustible material construction material and personal items in 1st and 2nd room from south at west at public hall, 6th story
Oct 2, 2025
Closed — Violation closed - CImmediately hazardous
§ 12 m/d law discontinue the storage of combustible material construction material and personal items in 1st, 2nd and 3rd rooms from south at west and 1st room from north at east at public hall
Oct 2, 2025
Closed — Violation closed - CImmediately hazardous
§ 12 m/d law discontinue the storage of combustible material construction material and personal items in 1st and 2nd rooms from south at west at public hall, 3rd story
Oct 2, 2025
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - BHazardous
Arrange and make self-closing the doors .. in the entrance located at apt 6b, 6th story, 1st apartment from west at north
Jan 26, 2019 · Apt 6B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 6b, 6th story
Jan 26, 2019 · Apt 6B
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 6b, 6th story
Jan 26, 2019 · Apt 6B
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock set installed on door to room with fire escape window in the 1st room from east located at apt 6b, 6th story, 1st apartment from west at north
Jan 26, 2019 · Apt 6B
Open — Nov sent out - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 200 watts minimum required (light fixtures present)
Oct 5, 2015
Closed — Violation dismissed
DOB building violations · 103
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Hazardous condition (facade) facade required
Cycle 9b unsafe report filed
Aug 25, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active
Show 40 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 22, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 22, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 10, 2021
Dob violation - dismissed - Construction other optional
Emergency work order to provide overhead protection. take and provide safety measures to secure public safety at exposure 1(east 12 st)due to broken stones sections above 1fl. remedy: immed provide sidewalk shed on exp 1(east 12 st) approx 30 lf to protect public safety
Oct 27, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 29, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 29, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 18, 2021
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - dismissed
ECB violations · 32
- Class - 2
Failure to file acceptable amended cycle 8b and 9b report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #900798. remedy: file acceptable report.
Apr 20, 2026 · Penalty $1,250
Active - Class - 2
Weilmclain boiler servicing apt 2b has boiler flue pipe in poor condition+combustion air louver is 1/2 clogged+junk in boiler room, maintain boiler; correct violation+submit certificate of correction
Oct 17, 2025 · Penalty $6,250
Active - Class - 2
Baxi boiler servicing apt 3a has safety valve in the incorrect position, maintain boiler; correct violation+submit certificate of correction
Oct 17, 2025 · Penalty $6,250
Active - Class - 3
Boiler in boiler room@apt 5a is not accessible for inspection, maintain boiler; remove junk+repair boiler room door;correct violation+submit certificate of correction
Oct 17, 2025 · Penalty $500
Active - Class - 1
Ccb-150 boiler servicing apt 1c has the wrong safety valve installed;mawp 43.5, maintain boiler; cease use hazardous condition correct violation+call dob 212 6020580 to lift cease use order+submit certificate o
Oct 10, 2025 · Penalty $2,500
Resolve - Class - 1
Takagi hot water heater servicing apt 5b is installed without a safety relief valve, maintain boiler; cease use hazardous condition correct violation immediately +call dob 212 6020580 to lift the cease use orde
Oct 10, 2025 · Penalty $2,500
Resolve - Class - 2
Baxi boiler servicing apt#6b is inoperable+navien boiler servicing apt 6a has safety discharge pipe reduced+missing receptacle plate+both boilers missing a remote switch, maintain boiler; correct violation+subm
Oct 10, 2025 · Penalty $625
Resolve - Class - 2
Atoi observed deck built on the roof surface is apx 16x42 feet deck is made out of combustible material 4x4 beams and 1x4 planks.as per dob no permit on file with the department., obtain all permits
Oct 2, 2025 · Penalty $1,250
Active - Class - 2
Failure to comply with commissioner's order contained in summons#35640480l issued on 12/9/2021,and failure to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2).an acceptable certifica
Aug 26, 2024 · Penalty $1,280
Active - Class - 1
Unlawful acts. failure to comply with commissioner's order. note:-observed respondent failure to comply with previous violation #35679843j dated 02/12/2024, which requires respondent to remove egress obstructio
May 14, 2024
Resolve
Show 22 more ↓
- Class - 2
Failure to submit an acceptable required cycle 8b and 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #900798. agg2 history of noncomp
Apr 11, 2024 · Penalty $6,250
Active - Class - 1
Failure to provide unobstructed exit passage way: note at time of inspection view flower pots and brick at fire escape landing at 6 floor. remedy: remove egress obstruction.
Feb 12, 2024
Resolve - Class - 2
Failure to submit acceptable req cycle8b report of critical exam doc condition of exterior wall&appurtenances req by 28-302.4 for control800798.agg1:prior nov 37021633n under 28-302.4 submit acceptable req tech
Oct 19, 2022 · Penalty $3,125
Active - Class - 2
Failure to maintain building exterior walls or appurtenances.note:at time of inspection observed cracked-spalled masory on parapet walls at both exp #2 west elevation and exp #4 east elevation.remedy:provide sa
Dec 9, 2021 · Penalty $1,250
Active - Class - 1
Unlawful acts.failure to comply with commissioner's order.note:at timeof inspection,observed that respondent failed to comply with previously issued ecb#35589019m dated on 09/16/2021.however,as of today 10-27-2
Oct 27, 2021 · Penalty $2,500
Resolve - Class - 1
Unlawful acts.failure to comply with commissioner's order.note:at timeof inspection,observed that respondent failed to comply with previously issued ecb#35589018k dated on 09/16/2021.however,as of today 10-27-2
Oct 27, 2021
Resolve - Class - 1
Unlawful acts.failure to comply with commissioner's order.note:at timeof inspection,observed that respondent failed to comply with previously issued ecb#35589020j dated on 09/16/2021.rem:comply with commissione
Oct 27, 2021 · Penalty $1,250
Resolve - Class - 1
Unlawful acts.failure to comply w/commissioner's order note:respondentfailed to comply w/previously written ecbv35577915m dated8/11/21.defective conditions stated in previous ecb35579915m still recurring,exist
Sep 16, 2021 · Penalty $1,250
Active - Class - 1
Failure to maintain bldg exterior wall or appurtenances. note: at timeof inspection,observed that respondent failed to correct previous vio#35577915m date on 8/11/2021. as of today 9/16/2021,unsafe conditions
Sep 16, 2021 · Penalty $12,500
Active - Class - 1
Failure to provide sws where required note:atoi,observed that respondent failed to correct previous ecbv35577916y issued8/11/21 provide sws where required.
Sep 16, 2021
Resolve - Class - 1
Failure to provide sidewalk shed where required as noted in violation#35559685r issued on 05/22/2021 and violation#35577965k issued on 06/29/2021(exposure 1 & exposure 4 have vertical cracks and deterioration a
Aug 11, 2021
Resolve - Class - 2
Failure to maintain exterior facade and appurtenances at south elevation,exposure#1 observed step cracks above the window at 3rd floor.also observed defective repair at limestone(arc shape)above the window at 5
Aug 11, 2021 · Penalty $1,250
Resolve - Class - 1
Failure to provide sidewalk shed where require .note at the time of my inspection view at exposure 4 south east corner of parapet wall vertical crack deteeioration south west crack at parapet wall provide sidew
Jun 29, 2021
Resolve - Class - 1
Failure to maintain building exteiror walls.facade and appurtenances note at the time of my inspection view at exposure 1 south elevation broekn stones at 2 no floor of window side damaged joints crack deteeior
Jun 29, 2021 · Penalty $6,250
Active - Class - 2
Failure to submit acceptable required cycle8b report of critical exam documenting condition of exterior wall&appurtenances required by28-302.4 for control800798.agg1:prior nov3\013333l under28-302.4 submit acce
Jun 1, 2021 · Penalty $3,125
Active - Class - 1
Failure to maintain exterior facade and appurtenances.(1)at west elevation,exp #2 observed vertical cracks and displacement at masonry wall at parapet level south corner (2) at south elevation, exp #1 observed
May 22, 2021 · Penalty $2,500
Active - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35360562z issued on 10/18/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.rem:comply with commissi
Jan 18, 2019
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation#35360562z issued on 10/18/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.no c of c or file.rem:com
Nov 28, 2018
Resolve - Class - 1
Occpuancy contrary to that allowed by the c of o or building dept. records.note:c of o#88722 allows no occupancy useage of roof level.observed @roof:wood deck flooring installed & roof has been arranged for occ
Oct 18, 2018
Resolve - Class - 2
Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#800798. remedy: submit required technical report
Oct 15, 2018 · Penalty $1,280
Active - Non-hazardous
Failure to submit a fifth round technical report:periodic inspection or exterior walls and appurtenances as required by local law 11 of 1998and the department of bldg rules and regulations.remedy:file the req
Nov 28, 2003 · Penalty $700
Resolve - Non-hazardous
Matters not provided for. noted fire damage done apts. 6a & 6c at 7th sty. fire damage to lock-loft and east side of cornice. plaster ceiling removed from fire dept. east section of apts. leaving ceiling
Jul 13, 1990
Resolve
Complaints
- Line of travel
Line of travel
Oct 8, 2025 · Apt 4A
Close - Line of travel
Line of travel
Oct 8, 2025 · Apt 6A
Close - Line of travel
Line of travel
Oct 8, 2025 · Apt BLDG
Close - Line of travel
Line of travel
Oct 8, 2025 · Apt BLDG
Close - Line of travel
Line of travel
Oct 8, 2025 · Apt BLDG
Close - Line of travel
Line of travel
Oct 8, 2025 · Apt BLDG
Close - Line of travel
Line of travel
Oct 8, 2025 · Apt BLDG
Close - Line of travel
Line of travel
Oct 8, 2025 · Apt BLDG
Close - Line of travel
Line of travel
Oct 8, 2025 · Apt BLDG
Close - Line of travel
Line of travel
Oct 8, 2025 · Apt BLDG
Close
Show 22 more ↓
- Line of travel
Line of travel
Oct 8, 2025 · Apt BLDG
Close - Line of travel
Line of travel
Oct 8, 2025 · Apt BLDG
Close - Line of travel
Line of travel
Oct 8, 2025 · Apt BLDG
Close - Line of travel
Line of travel
Oct 8, 2025 · Apt BLDG
Close - Line of travel
Line of travel
Oct 8, 2025 · Apt BLDG
Close - Line of travel
Line of travel
Oct 8, 2025 · Apt BLDG
Close - Line of travel
Line of travel
Oct 8, 2025 · Apt BLDG
Close - Line of travel
Line of travel
Oct 8, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 13, 2024 · Apt 1
Close - Heat/hot water
Apartment only
Jan 8, 2022 · Apt 2B
Close - Heat/hot water
Apartment only
Jan 22, 2019 · Apt 6B
Close - Heat/hot water
Entire building
Nov 29, 2018 · Apt 1A
Close - Unsanitary condition
Garbage/recycling storage
Jul 30, 2018 · Apt BLDG
Close - Door/window
Door
Jul 30, 2018 · Apt 6B
Close - Unsanitary condition
Garbage/recycling storage
Jul 30, 2018 · Apt 6B
Close - Heat/hot water
Entire building
Jan 2, 2018 · Apt 2A
Close - Heat/hot water
Apartment only
Nov 11, 2017 · Apt 2B
Close - Unsanitary condition
Mold
Jan 9, 2016 · Apt 6A
Close - Unsanitary condition
Pests
Jan 9, 2016 · Apt 6A
Close - Unsanitary condition
Mold
Jan 9, 2016 · Apt 6A
Close - Heat/hot water
Apartment only
Jan 8, 2015 · Apt 1B
Close - Heating
Heat related
Jan 23, 2014 · Apt 2A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1920
- Floors
- 6
- Residential units
- 15
- Building area
- 11,034 ft²
- Lot area
- 2,512 ft²
- Zoning
- R8B
- Community board
- 103
- Council district
- 2
- Block / lot
- 440 / 51
- Assessed value
- $1,504,800
- Landmark / historic district
- No
HPD registration #111258, last renewed Aug 6, 2025.
Questions about 417 East 12 Street
Who owns 417 East 12 Street?
The owner of record in NYC Department of City Planning PLUTO data is Adeia Associates.
Does 417 East 12 Street have violations?
Yes. NYC HPD has recorded 36 housing violations at this property.
Is 417 East 12 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 417 East 12 Street built?
City records list 1920 as the year it was built.
How many apartments are in 417 East 12 Street?
It has 15 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.