139 Orchard Street
Manhattan, NY 10002BBL 1-00415-0067Map
Owner of record: Allen Street Owner LLC
139 Orchard Street is a hotel built in 2009 in Manhattan, 10002. It has 16 residential units across 17 floors. The owner of record is Allen Street Owner LLC. HPD has recorded 152 housing violations here, most recently on September 16, 2026. 30 of the 50 most recent violations are still open. City tax records listed 5 rent-stabilized apartments here in 2024.
- HPD violations
- 152
- DOB violations
- 25
- ECB violations
- 118
- HPD complaints
- 234
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 152
- BHazardous
Properly repair or replace the broken or defective counter balance at lower window sash in the kitchen located at apt 2c, 2nd story, 1st apartment from west at north
Sep 16, 2026 · Apt 2C
Open — Civ14 mailed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 1st room from north located at apt 2d, 2nd story, 1st apartment from east at south
Jan 17, 2024 · Apt 2D
Open — Nov certified late - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Jan 17, 2024
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 4c, 4th story, 1st apartment from south at west
Nov 21, 2023 · Apt 4C
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 4c, 4th story, 1st apartment from south at west
Nov 21, 2023 · Apt 4C
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 5d, 5th story, 1st apartment from east at south
Nov 21, 2023 · Apt 5D
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 5d, 5th story, 1st apartment from east at south
Nov 21, 2023 · Apt 5D
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of garbage bins at public hall, 1st story
Apr 8, 2023
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective located at apt 5c, 5th story, 1st apartment from south at west
Apr 8, 2023 · Apt 5C
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 5c, 5th story, 1st apartment from south at west
Apr 8, 2023 · Apt 5C
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 5c, 5th story, 1st apartment from south at west
Apr 8, 2023 · Apt 5C
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the bathroom located at apt 5c, 5th story, 1st apartment from south at west
Apr 8, 2023 · Apt 5C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 5c, 5th story, 1st apartment from south at west
Apr 8, 2023 · Apt 5C
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the kitchen located at apt 5c, 5th story, 1st apartment from south at west
Apr 8, 2023 · Apt 5C
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... approx 4 sq ft at the ceiling in the 1st room from north located at apt 5b, 5th story, 2nd apartment from south at west original violation 15641188 issued 03-jan-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jan 3, 2023 · Apt 5B
Open — First no access to re- inspect violation - BHazardous
Trace and repair the source and abate the visible mold condition... approx 4 sqft at the ceiling in the kitchen located at apt 5b, 5th story, 2nd apartment from south at west original violation 15641185 issued 03-jan-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jan 3, 2023 · Apt 5B
Open — First no access to re- inspect violation - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north located at apt 5b, 5th story, 2nd apartment from south at west
Jan 3, 2023 · Apt 5B
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak above the ceiling in the 1st room from north located at apt 5b, 5th story, 2nd apartment from south at west
Jan 3, 2023 · Apt 5B
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 4 sqft at the ceiling in the kitchen located at apt 5b, 5th story, 2nd apartment from south at west
Jan 3, 2023 · Apt 5B
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 5b, 5th story, 2nd apartment from south at west
Jan 3, 2023 · Apt 5B
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak above the ceiling in the kitchen located at apt 5b, 5th story, 2nd apartment from south at west
Jan 3, 2023 · Apt 5B
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 4 sq ft at the ceiling in the 1st room from north located at apt 5b, 5th story, 2nd apartment from south at west
Jan 3, 2023 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective the bulkhead door to roof , 5th story
Jan 3, 2023
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at bulkhead at public hall, 5th story
Dec 6, 2022
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of garbage bins at public hall, 1st story
Nov 29, 2022
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 3a, 3rd story, 1st apartment from west at north
May 11, 2022 · Apt 3A
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 5b, 5th story, 2nd apartment from south at west
May 11, 2022 · Apt 5B
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north located at apt 5b, 5th story, 2nd apartment from south at west
May 11, 2022 · Apt 5B
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 5c, 5th story, 1st apartment from south at west
May 11, 2022 · Apt 5C
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the 2nd room from north located at apt 5c, 5th story, 1st apartment from south at west
May 11, 2022 · Apt 5C
Open — First no access to re- inspect violation - BHazardous
Properly repair the broken or defective light fixture at ceiling in the 3rd room from north located at apt 5c, 5th story, 1st apartment from south at west
May 11, 2022 · Apt 5C
Open — First no access to re- inspect violation - BHazardous
Repair the roof so that it will not leak over ceiling in the 3rd room from north located at apt 5c, 5th story, 1st apartment from south at west
May 11, 2022 · Apt 5C
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the 3rd room from north located at apt 5c, 5th story, 1st apartment from south at west
May 11, 2022 · Apt 5C
Open — First no access to re- inspect violation - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from north located at apt 5c, 5th story, 1st apartment from south at west
May 11, 2022 · Apt 5C
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 5c, 5th story, 1st apartment from south at west
May 11, 2022 · Apt 5C
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 5b, 5th story, 2nd apartment from south at west
May 11, 2022 · Apt 5B
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north located at apt 5b, 5th story, 2nd apartment from south at west
May 11, 2022 · Apt 5B
Open — First no access to re- inspect violation - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ...bulkhead door , 5th story
May 4, 2022
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hatchway opening for fire escape drop ladder obstructed by piece of wood at scaffold at building front
Feb 10, 2022
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at the ceiling in the 1st room from north located at apt 5b, 5th story, 1st apartment from south at west
Oct 25, 2021 · Apt 5B
Open — First no access to re- inspect violation - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the 2nd room from north located at apt 5b, 5th story, 1st apartment from south at west
Oct 25, 2021 · Apt 5B
Closed — Violation dismissed - ANon-hazardous
Paint or post a sign indicating floors at all stories at public hall
Oct 25, 2021
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at the ceiling in the 2nd room from north located at apt 5b, 5th story, 1st apartment from south at west
Oct 25, 2021 · Apt 5B
Open — First no access to re- inspect violation - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and the north wall in the 1st room from north located at apt 5b, 5th story, 1st apartment from south at west
Oct 25, 2021 · Apt 5B
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... approximately 10 sq ft at ceiling in the 2nd room from north located at apt 5b, 5th story, 1st apartment from south at west
Oct 25, 2021 · Apt 5B
Open — First no access to re- inspect violation - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling, south and north walls at public hall, 5th story
Oct 18, 2021
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling, south and north walls at public hall, 4th story
Oct 18, 2021
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling, south and north walls at public hall, 3rd story
Oct 18, 2021
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling, south and north walls at public hall, 2nd story
Oct 18, 2021
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling at public hall, 1st story
Oct 18, 2021
Closed — Violation dismissed
DOB building violations · 25
- Construction other optional
Noted: neighboring bldg 136 allen st exp #2 wall at orchard st is in a state of disrepair. exp #2 exterior wall is missing masonry bricks and has cracks throughout wall. the terrace located at 138 allen st exp #3 2nd fl is below the hazardous conditions at 136 allen st which is rendering 2nd floor terrace inadequate for occupancy.
Jan 11, 2024
Dob violation - active - Construction other optional
Stop all work immediately and make the site safe. kindly contact the borough commissioner's office at (212) 393-2615 as soon as possible with appropriate information in response to this letter.
Jan 3, 2024
Dob violation - dismissed - Construction other optional
Stop all work immediately and make the site safe. kindly contact the borough commissioner's office at (212) 393-2615 as soon as possible with appropriate information in response to this letter.
Jan 3, 2024
Dob violation - dismissed - Construction other optional
Borough commissioner has issued a stop work order for job # 123355948 due to superintendent's withdrawal.
Jul 26, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 1, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 1, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 1, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 1, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 1, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 11, 2019
Dob violation - dismissed
Show 15 more ↓
- Emergency none
Provide a sidewalk shed for the full length of the exp#1 north elevation - approx. 40-50 linear feet. make safe facade as per code
Sep 13, 2019
Dob violation - dismissed - Construction other optional
Failure to maintain facade and appurtenances.exp 1 north elev. cracks and spalled stucco. obstructed egress 2nd story air conditioner installed in fire escape window with gates opened.exp 3 south elev cracks and spalled stucco. exp 4 west elev. cracks and spalled stucco remedy:repair/make safe facade,remove obstructions. comply with code
Sep 11, 2019
Dob violation - dismissed - Construction other optional
The borough commissioner has issue a stop work order for permit #123355948 due to intent to contractor withdrawal. stop all work and make site safe.
Aug 15, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Construction other optional
Borough commissioner has ordered all work stopped for application/perm it# 104870392-nb. permit holder withdrawn from project. stop all work, make site safe, provide all required information forthwith
Sep 28, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 23, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 30, 2015
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 5, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 15, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 18, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 28, 2011
Dob violation - dismissed - Construction other optional
C-construction other optional
Nov 30, 2009
Dob violation - dismissed - Zoning none
Z-zoning none
Nov 24, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed
ECB violations · 118
- Class - 2
At the time of my inspection i observed construction fence installed at exp#1 and 3 -not maintained/constructed as per code-big amount of graffiti, posters on fence, at exposure #3 fence not painted hunter gree
Oct 20, 2023 · Penalty $1,000
Resolve - Class - 2
At the time of inspection i observed temp power and light been used by other trades. application not on file, obtain permit; obtain permit
Aug 14, 2023
Resolve - Class - 2
Inspector pena badge # 2738 observed on 8/13/23 @ 12:00 pm in the basement and on the 1st floor new branch circuits, wiring, conduits and equipment that was partially installed. permits on file m00224096 and m0
Aug 13, 2023
Resolve - Class - 1
At time of inspection i observed sidewalk shed installed on exposure #1 and 3 with inoperable light bulbs underside the shed to bring illumination failure to provide lighting creates unsafe and mugging conditio
May 30, 2023 · Penalty $625
Resolve - Class - 2
5 story building, facade restoration, closed site with sidewalk shed(sws) and scaffold(sf) at exp1&4. i observed sws horizontal brace above main entrance door at 6f 10'' high, not the 8f min height as per bc330
Feb 28, 2023 · Penalty $5,000
Resolve - Class - 2
5 story building, with sidewalk shed(sws) and scaffold(sf) at exp1&4. i observed closed site, with sf debris netting not maintained at several locations. hazard of struck by exists for the public, from the pote
Feb 28, 2023
Resolve - Class - 1
At time of my inspection i asked oscar oswaldo pinan paez to see his 40 hour site safety training card, he said he doesn have the training.
Sep 22, 2022 · Penalty $2,500
Resolve - Class - 1
At time of my inspection i asked bekim bisha to see his 40 hour site safety training card, he did not provide it. no record of sst card was provided by the site safety manager in his safety logs.
Sep 22, 2022 · Penalty $1,250
Resolve - Class - 2
At time of inspection i observed the following: bolts facing sidewalk were not cap/covered creating a sharp edge. observed mulitple lights out including standpipe lights and observed 1 fixture without light on
Sep 22, 2022 · Penalty $2,400
Resolve - Class - 2
At time of my inspection i requested to see the following: side walk shed approved drawings, 6 month inspection report for sws, site specific orientation for 2 workers,
Sep 22, 2022
Resolve
Show 40 more ↓
- Class - 1
Responsibility for safety- at time of my inspection i observed the following: damaged extension cords in use. exposed wires from electrical box, box was not covered. cutting steel creating sparks near stored ma
Sep 22, 2022 · Penalty $2,500
Resolve - Class - 2
At the time of inspection on an active job site i observed construction fence cover with posters and unlawful marking consisting of graffiti also blocking viewing panels and information panel, job also related
Jul 7, 2022
Resolve - Class - 2
At the time of inspection on an active job site , i observed multiple trades on site when i ask contractors on site for pre shift meeting for workers none was provided and also no logbook for sidewalk shed as p
Jul 7, 2022
Resolve - Class - 2
At the time of inspection on an active job site , i observed a sidewalk shed at exposure 3 allen street with storage on top consisting of scaffold parts , wood and other construction materials also job related
Jul 7, 2022 · Penalty $2,400
Resolve - Class - 2
Expired fence permit.at time of inspection of 16 story building observed expired sidewalk shed permit expire date 06/14/22.remedy:renew permit comply with code.
Jun 16, 2022
Resolve - Class - 2
Expired temp elevator certificate i observed active worksite of a new 17 story building. temporary elevator certificate had expired on 6.5.22. upon request to view updated one, none was provided by the site saf
Jun 10, 2022
Resolve - Class - 2
Jobsite fence not constructed or maintained pursuant to subsection.noted:at the time of my inspection of construction worksite.i observed construction fence at exposure#1 has(graffitti,throughout force glass in
Mar 4, 2022
Resolve - Class - 1
Bc3301.1 responsibility for safety:failure to institute adequate safety measure:(lack of ppe.no helmets)note:at time of inspection of 17 story new building under construction nb#104870392 observed workers w/o p
Dec 21, 2021
Resolve - Class - 1
Orientation.permit holder failed to ensure workers receive cite safety orientation or refresher.note:at time of inspection of active job site request for sife safety orientation record none was provided.lack of
Dec 21, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to comply manufacture specification.(yodock system not adequate)note:at time of inspection of an active job site currently at 17 story level in street at exp #3 barrirers provided(yodock system)not inst
Dec 21, 2021
Resolve - Class - 2
Bc3309.10 protection required for adjoining property.note:at time of inspection of 17 story new building under construction observed no roof protection at adjoining property at exp #2 & #4 posing severe hazard
Dec 21, 2021
Resolve - Class - 2
Pedestrian protection does not meet code specifications-crossbar of sws.note at time of inspection of a 16 story new building,observed at exp1 crossbars of sws not connected with steel pipe column at some place
Oct 25, 2021 · Penalty $2,400
Resolve - Class - 2
Temporary construction equipment onsite expired permit-sws.note at time of inspection,i observed that the permit for the sidewalk shed number#m00377175-i1-sh had expired on 8/11/2021.for public safety,code stip
Oct 25, 2021
Resolve - Class - 1
Failure to maintain/display onsite documents required by chapter 33.note at time of my inspection of a 16 story story building,i observed that there was no ssp of other documents on site.ssm was not there at ti
Oct 25, 2021 · Penalty $625
Resolve - Class - 2
Project information panel/constructoon sign not provided or not in compliance with section.at time of inspection observed a volt fence in place at 79 rivington street.no project information panel was provided o
Oct 21, 2021 · Penalty $625
Resolve - Class - 2
Failure to post or distribute safe construction bill of rights.note:at time of inspection observed work begun under aforementioned job number by code is required scbor should be posted or distributed-was not di
Sep 9, 2021
Resolve - Class - 1
Failure to maintain adequate housekeeping.note:at time of inspection observed excessive amounts of stored black garbage bags with debris cement times stored on roof posing safety hazard to occupants of building
Sep 9, 2021 · Penalty $625
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temp const-no handrails ato my insp i observed following conditions:-no handrailscellar to 1fl&ht@stairs was approx4'6"-missing handrail from 1-2fl-mis
Jun 4, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to maintain/display onsite docs required by bcch33.ato my inspi observed there was no wall dividing neighboring property@cellar level.i observed excavated areas in neighboring property.upon request for
Jun 4, 2021
Resolve - Class - 1
Bc 3303.9 failure to maintain an adequate and required means of egressas per code.at time of inspection on an active 16 story no construction site notice that the contractor failed to maintain on adequate means
Jun 1, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to maintain guardrails system as per code.at time of inspection on an active 16 story nb construction site notice that the contractor failed to provide guardrails and have them in place at the balcony a
Jun 1, 2021 · Penalty $2,500
Resolve - Class - 1
Bc 3303.10 failure to adequately post or distribute notice of tenant protection plan on site. at time of inspection on an active open 5 story alt construction notice in the occupied building and after speaking
May 28, 2021
Resolve - Class - 1
Bc3303.9 failure to maintain required means of egress&other elements in existing bldg under const.atoi on active open 5styalt const site notice that contractor failed to maintain an adequate means of egress fir
May 28, 2021
Resolve - Class - 1
Failure to maintain/provide guardrails on site as per code atoi on active open 5styalt const site notice@exp4@upper walkway connecting two bldgs,contractor failed to maintain/provide protection to prevent anyon
May 28, 2021
Resolve - Class - 2
Const super failed to perform duties as per code.atoi on active open 5styalt const sitenotice conditions onsite that ensure failure to perform adequate duties on part of const super on this site.(1)super failed
May 28, 2021
Resolve - Class - 1
Failure to provide site safety manager and have onsite as per code.at time of inspection on an active 16 story nb construction site notice workers and active work being conducted onsite when worker was asked if
May 28, 2021
Resolve - Class - 2
Failure to maintain building in a code compliant manner.1)north elevation,expo#1 observed vertical cracks and spalling stucco at parapet wall east corner.2)south elevation,expo#3 observed vertical cracks in mul
Apr 17, 2021 · Penalty $625
Resolve - Class - 2
Failure to comply w/commissioners order contained in summon/violation #35408787j issued on 09-11-2019 & to file a certificate of correction pursuant to 28-201.1 & 1rcny 102-01.remedy:comply w/commissioners orde
Mar 6, 2021 · Penalty $1,250
Resolve - Class - 1
Failure to maintain exterior bldg facade & appurtenances.at time of inspection observed north elevation exp.#1 cracked & spalling stucco parapet wall.south elevation exp.#3:spalled stucco cracks at stucco.expos
Mar 6, 2021
Resolve - Class - 1
Failure to provide adequate house keeping.note at time of inspection i observed sidewalk shed in place with a homeless person living under it with no access to sidewalk.rem:comply with code.
Jul 10, 2020
Resolve - Class - 1
3301.1.2 stop all welding operations.note at time of inspection i observed two of facade solution workers welding without any welding certifications(welding license,watch guard and certificate of fitness)worker
Jul 10, 2020
Resolve - Class - 2
Pedestrian protection does not meet code compliant specification.note at time of inspection i observed side walk shed in place filled with homeless persons belongings fire hydrant blocked and stand pipe obstruc
Jul 10, 2020
Resolve - Class - 2
Failure to comply with commissioners order contained in summons/violation #35408787j issued on 09-11-2019, and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01(d)(2) file a certificate
Jun 29, 2020 · Penalty $1,250
Resolve - Class - 2
Pedestrian protection does not meet code specifications. at the time of my inspection of a 16 sty new bldg. i observed sidewalk shed in place at exp#1. 1)i observed a bracing for the sidewalk shed not connected
Mar 9, 2020 · Penalty $2,400
Resolve - Class - 2
Job site fence not constructed or maintained pursuant to subsection. @time of my inspection of a 16 sty new bldg,i observed construction fence in place,upon inspection i observed nails protuding from the fence
Mar 9, 2020
Resolve - Class - 1
Work without permit. at roof level of above noted property, a raised metal grating platform approximately 25'x10' with a two read metal step was constructed and secured to parapet.no anchoring details submitted
Sep 19, 2019
Resolve - Class - 1
Failure to maintain building exterior walls/facades and appurtenances.north elevation,exposure 1:loose,and bulging,cracks and spalled stuccoparapet wall. south elevation,exposure 3:spalled stucco,cracks at stuc
Sep 11, 2019 · Penalty $2,500
Resolve - Class - 2
At the time of inspection crane user of crane cd # 4523cn # 1089/18 24/7 lifting inc failed to notify the department from the job site at 138 allen st as required by law no departure notification was on
Dec 18, 2018 · Penalty $5,030
Resolve - Class - 2
Inadequate construction fence gate. at the time of my inspection of a 16 story building topped off, i observed that the construction fence gate at exp #1 swings into the sidewalk. this could hurt an unaware ped
Sep 19, 2018
Resolve - Class - 2
Housekeeping. at the time of my inspection of a 16 story building topped off, i observed several fls had construction debris on ground and rain water from previous days rain. maintain clean floors to prevent tr
Sep 19, 2018
Resolve
Complaints
- Safety
Smoke detector
Sep 17, 2026 · Apt 2C
Close - Door/window
Window frame
Sep 17, 2026 · Apt 2C
Close - Safety
Smoke detector
Sep 14, 2026 · Apt 2C
Close - Door/window
Window frame
Sep 14, 2026 · Apt 2C
Close - General
Janitor/super
Mar 10, 2026 · Apt 4A
Close - Unsanitary condition
Garbage/recycling storage
Mar 10, 2026 · Apt 4A
Close - Unsanitary condition
Garbage/recycling storage
Mar 10, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 28, 2026 · Apt 5B
Close - Water leak
Heavy flow
Jan 18, 2026 · Apt 4B
Close - Unsanitary condition
Mold
Jan 18, 2026 · Apt 4B
Close
Show 40 more ↓
- Heat/hot water
Entire building
Feb 17, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 17, 2024 · Apt 5B
Close - Heat/hot water
Apartment only
Jan 16, 2024 · Apt 2D
Close - Electric
Lighting
Nov 17, 2023 · Apt BLDNG
Close - Door/window
Door
Nov 17, 2023 · Apt BLDNG
Close - Heat/hot water
Apartment only
Nov 17, 2023 · Apt 4C
Close - Safety
Carbon monoxide detector
Nov 17, 2023 · Apt 4C
Close - Safety
Smoke detector
Nov 17, 2023 · Apt 4C
Close - Safety
Carbon monoxide detector
Nov 17, 2023 · Apt 5D
Close - Safety
Smoke detector
Nov 17, 2023 · Apt 5D
Close - Heat/hot water
Entire building
Oct 16, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 7, 2023 · Apt 3C
Close - Heat/hot water
Apartment only
Mar 4, 2023 · Apt 3C
Close - Plumbing
Water supply
Feb 6, 2023 · Apt 3A
Close - Heat/hot water
Entire building
Jan 10, 2023 · Apt 5A
Close - Plumbing
Water supply
Jan 9, 2023 · Apt 5B
Close - Heat/hot water
Entire building
Jan 9, 2023 · Apt 5A
Close - Plumbing
Water supply
Jan 9, 2023 · Apt BLDG
Close - Electric
Outlet/switch
Dec 31, 2022 · Apt 5B
Close - Heat/hot water
Apartment only
Dec 31, 2022 · Apt 5B
Close - Water leak
Heavy flow
Dec 31, 2022 · Apt 5B
Close - Heat/hot water
Entire building
Dec 27, 2022 · Apt 5A
Close - Plumbing
Water supply
Dec 27, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 27, 2022 · Apt BLDG
Close - Plumbing
Water supply
Dec 27, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 27, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 24, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 10, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 1, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 1, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 19, 2022 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Oct 20, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 14, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 7, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 23, 2022 · Apt BLDG
Close - Unsanitary condition
Mold
Oct 27, 2021 · Apt 5B
Close - Heat/hot water
Apartment only
Oct 17, 2021 · Apt 5B
Close - General
Cooking gas
Oct 17, 2021 · Apt 5B
Close - Water leak
Slow leak
Oct 17, 2021 · Apt 5B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (H9)
- Year built
- 2009
- Floors
- 17
- Residential units
- 16
- Building area
- 47,325 ft²
- Lot area
- 7,310 ft²
- Zoning
- C4-4A
- Community board
- 103
- Council district
- 1
- Block / lot
- 415 / 67
- Assessed value
- $7,420,950
- Landmark / historic district
- No
HPD registration #105980, last renewed Nov 6, 2025.
Questions about 139 Orchard Street
Who owns 139 Orchard Street?
The owner of record in NYC Department of City Planning PLUTO data is Allen Street Owner LLC.
Does 139 Orchard Street have violations?
Yes. NYC HPD has recorded 152 housing violations at this property.
Is 139 Orchard Street rent stabilized?
NYC Department of Finance tax bills listed 5 rent-stabilized units here in 2024 (about 31% of its 16 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 139 Orchard Street built?
City records list 2009 as the year it was built.
How many apartments are in 139 Orchard Street?
It has 16 residential units and 18 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.