186 Avenue A
Manhattan, NY 10009BBL 1-00405-0007Map
Owner of record: Tri-Luck Realty Corp
186 Avenue A is a walk-up apartment building built in 1920 in Manhattan, 10009. It has 8 residential units across 5 floors. The owner of record is Tri-Luck Realty Corp. HPD has recorded 47 housing violations here, most recently on May 15, 2024. 7 of the 47 most recent violations are still open. City tax records listed 4 rent-stabilized apartments here in 2024.
- HPD violations
- 47
- DOB violations
- 1
- ECB violations
- 0
- HPD complaints
- 73
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 47
- BHazardous
Abate the infestation consisting of bedbugs in the entire apartment located at apt 1b, 2nd story, 1st apartment from west at north
May 15, 2024 · Apt 1B
Closed — Violation dismissed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at , in the entrance located at apt 1b, 2nd story, 1st apartment from west at north
May 15, 2024 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2024
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Oct 4, 2023
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls in the vestibule hall , 1st story
Oct 4, 2023
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector improperly installed in the entire apartment located at apt 1b, 2nd story, 1st apartment from west at north
Oct 4, 2023 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). improperly installed in the entire apartment located at apt 1b, 2nd story, 1st apartment from west at north
Oct 4, 2023 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch in the entrance located at apt 1b, 2nd story, 1st apartment from west at north
Oct 4, 2023 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4b, 5th story, 1st apartment from west at north
Sep 27, 2023 · Apt 4B
Open — Notice of issuance sent to tenant - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Closed — Violation dismissed
Show 37 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling in the entire apartment located at apt 4b, 5th story, 1st apartment from west at north
Nov 1, 2022 · Apt 4B
Open — Not complied with - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 4b, 5th story, 1st apartment from west at north
Nov 1, 2022 · Apt 4B
Closed — Violation closed - ANon-hazardous
Replace with new the missing marble saddle at door in the entrance located at apt 4b, 4th story, 1st apartment from west at north
Nov 1, 2022 · Apt 4B
Closed — Violation closed - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door , in the entrance located at apt 4b, 4th story, 1st apartment from west at north
Nov 1, 2022 · Apt 4B
Closed — Violation closed - ANon-hazardous
Refit door in the entrance located at apt 4b, 4th story, 1st apartment from west at north
Nov 1, 2022 · Apt 4B
Closed — Violation closed - BHazardous
Properly repair the broken or defective window frame in the 1st room from east located at apt 4b, 5th story, 1st apartment from west at north
Nov 1, 2022 · Apt 4B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 5th story
Nov 1, 2022
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 5th story
Nov 1, 2022
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jun 30, 2022
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jun 30, 2022
Open — Not complied with - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 30, 2022
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jun 30, 2022
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jun 30, 2022
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 15, 2022
Closed — Violation dismissed - BHazardous
Replace the broken or defective washbasin in the 1st bathroom from north located at apt 1b, 2nd story, 1st apartment from west at north
Jun 30, 2021 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Replace with new the broken or defective door sadle in the 1st bathroom from north located at apt 1b, 2nd story, 1st apartment from west at north
Jun 30, 2021 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the 1st bathroom from north located at apt 1b, 2nd story, 1st apartment from west at north
Jun 30, 2021 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 1b, 2nd story, 1st apartment from west at north
Apr 25, 2021 · Apt 1B
Open — Not complied with - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 26, 2018
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
May 26, 2018
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 1b, 2nd story, 1st apartment from west at north
Mar 24, 2018 · Apt 1B
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing located at apt 1b, 2nd story, 1st apartment from west at north
Mar 24, 2018 · Apt 1B
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
Dec 6, 2017
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from north at west located at apt 4a, 5th story, 1st apartment from south at west
Dec 6, 2017 · Apt 4A
Open — First no access to re- inspect violation - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 4a, 5th story, 1st apartment from south at west
Dec 6, 2017 · Apt 4A
Open — First no access to re- inspect violation - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 24, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 1, 2015
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective intercom system from building front entrance to private hall located at apt 1b, 1st story, 1st apartment from west at north
Jul 27, 2015 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jul 27, 2015
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl-tiles floor at public hall, 1st story
Jun 30, 2015
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jun 30, 2015
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective door knob assembly in the entrance located at apt 1b, 2nd story, 1st apartment from west at north
Jun 7, 2015 · Apt 1B
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1b, 2nd story, 1st apartment from west at north
Apr 6, 2013 · Apt 1B
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1b, 2nd story, 1st apartment from west at north
Apr 6, 2013 · Apt 1B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the entire apartment located at apt 1b, 2nd story, 1st apartment from west at north
Apr 6, 2013 · Apt 1B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1b, 2nd story, 1st apartment from west at north
Apr 6, 2013 · Apt 1B
Closed — Violation closed
DOB building violations · 1
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Unsanitary condition
Garbage/recycling storage
Sep 9, 2026 · Apt 1B
Open - Unsanitary condition
Garbage/recycling storage
Aug 31, 2026 · Apt 1B
Close - General
Janitor/super
Aug 31, 2026 · Apt 1B
Close - Door/window
Door
Aug 21, 2026 · Apt 1B
Close - Unsanitary condition
Garbage/recycling storage
Aug 21, 2026 · Apt 1B
Close - General
Janitor/super
Aug 9, 2026 · Apt 1B
Close - Unsanitary condition
Mold
Jun 13, 2026 · Apt 1B
Close - Door/window
Window pane
Apr 8, 2026 · Apt 1B
Close - Unsanitary condition
Garbage/recycling storage
Sep 19, 2025 · Apt 1B
Close - Unsanitary condition
Garbage/recycling storage
Apr 3, 2025 · Apt 1B
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Oct 16, 2024 · Apt 1B
Close - Electric
Power outage
Aug 22, 2024 · Apt UNIT1B
Close - Unsanitary condition
Pests
May 4, 2024 · Apt 1B
Close - Door/window
Door frame
Oct 25, 2022 · Apt 4B
Close - Door/window
Window frame
Oct 25, 2022 · Apt 4B
Close - Door/window
Door
Oct 8, 2022 · Apt 1B
Close - Unsanitary condition
Pests
Jul 5, 2022 · Apt 1B
Close - Unsanitary condition
Pests
Jun 24, 2022 · Apt 1B
Close - Door/window
Door
Jun 15, 2022 · Apt 1B
Close - Heat/hot water
Apartment only
Dec 29, 2021 · Apt 1B
Close - Unsanitary condition
Garbage/recycling storage
Jul 14, 2021 · Apt 1FLOOR
Close - Plumbing
Basin/sink
Jun 24, 2021 · Apt 1B
Close - Plumbing
Basin/sink
Jun 24, 2021 · Apt 1B
Close - Plumbing
Basin/sink
Jun 18, 2021 · Apt 1B
Close - Plumbing
Basin/sink
May 29, 2021 · Apt 1B
Close - Plumbing
Basin/sink
May 14, 2021 · Apt 1B
Close - General
Cabinet
May 14, 2021 · Apt 1B
Close - Heat/hot water
Apartment only
Apr 25, 2021 · Apt B
Close - Heat/hot water
Apartment only
Apr 24, 2021 · Apt 1B
Close - Heat/hot water
Entire building
Mar 10, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 10, 2021 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 4, 2021 · Apt 1B
Close - Heat/hot water
Apartment only
Jan 2, 2021 · Apt 1B
Close - Heat/hot water
Apartment only
Mar 2, 2019 · Apt 1B
Close - Unsanitary condition
Garbage/recycling storage
May 22, 2018 · Apt 1B
Close - Unsanitary condition
Pests
Mar 16, 2018 · Apt 1B
Close - Safety
Fire escape
Mar 16, 2018 · Apt 1B
Close - Heat/hot water
Apartment only
Dec 3, 2017 · Apt 4A
Close - Heat/hot water
Apartment only
Dec 3, 2017 · Apt 4A
Close - Heat/hot water
Apartment only
Nov 1, 2017 · Apt 1B
Close - Appliance
Electric/gas range
Oct 20, 2015 · Apt 1B
Close - Appliance
Electric/gas range
Oct 5, 2015 · Apt 1B
Close - Appliance
Electric/gas range
Jun 4, 2015 · Apt 1B
Close - Appliance
Electric/gas range
May 27, 2015 · Apt 1B
Close - Heat/hot water
Entire building
Feb 22, 2015 · Apt 1B
Close - Paint/plaster
Wall
Mar 28, 2013 · Apt 1B
Close - Paint/plaster
Wall
Mar 28, 2013 · Apt 1B
Close - Plumbing
Basin/sink
Mar 28, 2013 · Apt 1B
Close - General
Ventilation system
Mar 28, 2013 · Apt 1B
Close - Paint/plaster
Ceiling
Mar 28, 2013 · Apt 1B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1920
- Floors
- 5
- Residential units
- 8
- Building area
- 6,050 ft²
- Lot area
- 1,738 ft²
- Zoning
- R7A
- Community board
- 103
- Council district
- 2
- Block / lot
- 405 / 7
- Assessed value
- $3,031,200
- Landmark / historic district
- No
HPD registration #136300, last renewed Oct 17, 2025.
Questions about 186 Avenue A
Who owns 186 Avenue A?
The owner of record in NYC Department of City Planning PLUTO data is Tri-Luck Realty Corp.
Does 186 Avenue A have violations?
Yes. NYC HPD has recorded 47 housing violations at this property.
Is 186 Avenue A rent stabilized?
NYC Department of Finance tax bills listed 4 rent-stabilized units here in 2024 (about 50% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 186 Avenue A built?
City records list 1920 as the year it was built.
How many apartments are in 186 Avenue A?
It has 8 residential units and 9 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.