174 Avenue A
Manhattan, NY 10009BBL 1-00405-0001Map
Owner of record: Alliance Apartmentshousing Developmant F Und Co In
174 Avenue A is an elevator apartment building built in 1998 in Manhattan, 10009. It has 46 residential units across 7 floors. The owner of record is Alliance Apartmentshousing Developmant F Und Co In. HPD has recorded 5 housing violations here, most recently on October 29, 2018. 1 of the 5 most recent violations are still open.
- HPD violations
- 5
- DOB violations
- 28
- ECB violations
- 16
- HPD complaints
- 24
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 5
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4c, 4th story, 3rd apartment from north at east
Oct 29, 2018 · Apt 4C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4c, 4th story, 3rd apartment from north at east
Oct 29, 2018 · Apt 4C
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective bell/buzzer intercom system from building entrance to the foyer located at apt 4c, 4th story, 3rd apartment from north at east
Oct 29, 2018 · Apt 4C
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 5, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 24, 2016
Closed — Violation dismissed
DOB building violations · 28
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - No report and / or late filing (facade) facade required
Cycle 8a no report filed
May 31, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 19, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 19, 2020
Dob violation - resolved - Elevator elevatorrequired
Cease use
Jun 13, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 1, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 1, 2017
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 27, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 5, 2016
Dob violation - resolved
Show 18 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
May 5, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 26, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 26, 2013
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7a technical report by 02/21/2012
Jan 31, 2013
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 28, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 28, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 31, 2008
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 9, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 9, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 2, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 2, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 2, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 2, 2004
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Elevator elevatorrequired
1p40933
Jun 21, 2000
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 21, 2000
Dob violation - active - Elevator elevatorrequired
1p40934
Jun 21, 2000
Dob violation - resolved
ECB violations · 16
- Class - 2
Failure to submit acceptable required cycle7a&8a report of critical exam documenting condition of exterior wall&appurtenances required by28-302.4 for control812770.agg2 hist of noncompliance on37019059p,3602800
Jun 1, 2021 · Penalty $6,250
Resolve - Class - 2
Failure to submit an acceptable required cycle 7a & 8a report of critical examination documenting condition of exterior wall & appurtenance required by 28-302.4 for control#812770. agg1: prior nov 36028000z und
May 20, 2020 · Penalty $1,250
Resolve - Class - 1
Partial stop work order for suspended scaffold issued pursuant to 28- 207.2 and posted at premises. work does not conform to approved construction documetns and approved amendments. failure to install equipment
Oct 18, 2018
Resolve - Class - 2
Failure to provide approved plan/documents at time of inspection. 7 story alt bldg with tenant protection plan, under construction active job site at the time of inspection gustero gonzalez (forman) was not
Oct 18, 2018 · Penalty $250
Resolve - Class - 2
No periodic inspection for sws provided (6 months) at time of inspection sidewalk shed in place was observed with no six month inspection lette rreading available. at time of inspection as required by code
Oct 18, 2018 · Penalty $620
Resolve - Class - 2
Installation inspection, all equipment is to be inspected once installation is completed. 7 story building (residential with tenant protection plan) under construction active job site at time of inspection i ob
Oct 18, 2018 · Penalty $620
Resolve - Class - 1
Bc3314.15.2 partial stop work order for suspended scaffold issued pursuant to 28-207.2 (all facade work. 7 story alt building with tenant protection plan in place under construction active job site at time of
Oct 18, 2018 · Penalty $2,500
Resolve - Class - 1
Bc 3301.1.3partial stop work order for suspended scaffold issued pursuant to 28-207.1 & posted on premises.failure to comply with manufacture specifications.noted:upon inspection i noticed motor installed on su
Oct 18, 2018
Resolve - Class - 2
Failure to submit acceptable 7th round report of critical examination documenting condition of exterior walls & appurtenances required by 28-302.4. agg2 history of noncompliance on 36028000z(agg1),36027718n.
Aug 11, 2016 · Penalty $800
Resolve - Class - 1
07m10,97b10,59u15,70o02. 07-door reopening device pana 40 device missing repair; 97-entire device insufficient repair; 59-machine brake device not tagged, tag device; 70-pit dirty clean
Apr 27, 2016 · Penalty $1,030
Resolve
Show 6 more ↓
- Class - 2
Failure to file an acceptable technical report in compliance w/code provisions: periodic inspection pf exterior walls & appurtenances as required by article 28.302 & the dob's rules & regulations. remedy: file
Sep 21, 2015 · Penalty $4,000
Resolve - Class - 2
Failure to maintain exterior building west elevaiton exp#1 decorative stones above window lintels are separating form bricks (loose mortar joints,east elevation exp#3 has cracking and separated mortar joints
Aug 20, 2015 · Penalty $2,500
Resolve - Class - 2
Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat
May 21, 2015 · Penalty $4,000
Resolve - Class - 2
Failure to provide required signage and inform on sdwlk shed note:permit info sign missing contractor information sign missing from sdwlk shed.rem:conform shed to code
Apr 14, 2011
Resolve - Class - 2
B254,5b,16,24b,25a,50,50a-e.(50)heating supply pipe corroded top of module#2.(50a)both air bleeders top of modules defective.(50b)#2 heating circulator leaking.(50c)modular ratting tag missing.(50d)outside fres
Aug 20, 2010 · Penalty $500
Active - Non-hazardous
Failure to carry out permitted work in accordance with applicable laws& regulations. in that construction activities are being performed other than weekdays between the hours of 7:oo am and 6:oo pm without a
May 14, 1999
Resolve
Complaints
- General
Mailbox
Mar 23, 2023 · Apt 2C
Close - Unsanitary condition
Pests
Aug 1, 2022 · Apt 1D
Close - Heat/hot water
Apartment only
Apr 7, 2020 · Apt 1D
Close - Heat/hot water
Entire building
Jan 31, 2019 · Apt 7G
Close - Heat/hot water
Apartment only
Oct 28, 2018 · Apt 4C
Close - Water leak
Slow leak
Oct 28, 2018 · Apt 4C
Close - Unsanitary condition
Pests
Oct 28, 2018 · Apt 4C
Close - Flooring/stairs
Floor
Oct 28, 2018 · Apt 4C
Close - Heat/hot water
Entire building
Jan 10, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 6, 2018 · Apt 1D
Close
Show 14 more ↓
- Unsanitary condition
Pests
Oct 19, 2016 · Apt 3D
Close - Heat/hot water
Entire building
May 1, 2016 · Apt 6E
Close - Heating
Heat related
Apr 22, 2013 · Apt 1A
Close - Heating
Heat related
Apr 18, 2013 · Apt NA
Close - Heating
Heat related
Dec 8, 2011 · Apt 2A
Close - Heating
Heat related
Mar 9, 2011 · Apt 4E
Close - Plumbing
Water supply
Dec 21, 2010 · Apt 2D
Close - Heating
Heat related
Dec 24, 2009 · Apt 1A
Close - Nonconst
Vermin
Aug 17, 2009 · Apt 2A
Close - General
Floor
Sep 18, 2006 · Apt 5B
Close - Paint/plaster
Wall
Jan 13, 2005 · Apt 2A
Close - Paint/plaster
Ceiling
Jan 13, 2005 · Apt 2A
Close - Heating
Heat related
Mar 28, 2004 · Apt 2-A
Close - Heating
Heat related
Mar 27, 2004 · Apt 2-A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1998
- Floors
- 7
- Residential units
- 46
- Building area
- 40,376 ft²
- Lot area
- 9,837 ft²
- Zoning
- R7A
- Community board
- 103
- Council district
- 2
- Block / lot
- 405 / 1
- Assessed value
- $1,815,300
- Landmark / historic district
- No
HPD registration #141868, last renewed Sep 26, 2025.
Questions about 174 Avenue A
Who owns 174 Avenue A?
The owner of record in NYC Department of City Planning PLUTO data is Alliance Apartmentshousing Developmant F Und Co In.
Does 174 Avenue A have violations?
Yes. NYC HPD has recorded 5 housing violations at this property.
Is 174 Avenue A rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 174 Avenue A built?
City records list 1998 as the year it was built.
How many apartments are in 174 Avenue A?
It has 46 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.