310 East 2 Street
Manhattan, NY 10009BBL 1-00372-0041Map
Owner of record: Alphabet Plaza LLC
310 East 2 Street is an elevator apartment building built in 2013 in Manhattan, 10009. It has 135 residential units across 12 floors. The owner of record is Alphabet Plaza LLC. HPD has recorded 22 housing violations here, most recently on August 26, 2025. 4 of the 22 most recent violations are still open. City tax records listed 135 rent-stabilized apartments here in 2024.
- HPD violations
- 22
- DOB violations
- 10
- ECB violations
- 20
- HPD complaints
- 74
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 22
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the entire apartment located at apt 10c, 10th story, 3rd apartment from west at north
Aug 26, 2025 · Apt 10C
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from north located at apt 10c, 10th story, 3rd apartment from west at north
Aug 26, 2025 · Apt 10C
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective glass at bottom sash in the 2nd room from north located at apt 10c, 10th story, 3rd apartment from west at north
Aug 26, 2025 · Apt 10C
Open — Nov sent out - ANon-hazardous
Refit closet door in the 2nd room from north located at apt 10c, 10th story, 3rd apartment from west at north
Aug 26, 2025 · Apt 10C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall in closet in the private hallway located at apt 10c, 10th story, 3rd apartment from south at west
Oct 29, 2024 · Apt 10C
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood stool window frame at west wall in the 2nd room from north located at apt 10c, 10th story, 3rd apartment from south at west
Oct 29, 2024 · Apt 10C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department bathroom vanity in the bathroom located at apt 10c, 10th story, 3rd apartment from south at west
Oct 29, 2024 · Apt 10C
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective caulking at watet closet in the bathroom located at apt 10c, 10th story, 3rd apartment from south at west
Oct 29, 2024 · Apt 10C
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 10c, 10th story, 3rd apartment from south at west
Oct 29, 2024 · Apt 10C
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective caulking at bathtub in the bathroom located at apt 10c, 10th story, 3rd apartment from south at west
Oct 29, 2024 · Apt 10C
Closed — Violation dismissed
Show 12 more ↓
- ANon-hazardous
Cleanse to the satisfaction of this department the visible evidence of mold grout at north wall in the bathroom located at apt 10c, 10th story, 3rd apartment from south at west
Oct 29, 2024 · Apt 10C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 1st room from north located at apt 10c, 10th story, 3rd apartment from south at west
Oct 29, 2024 · Apt 10C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the private hallway located at apt 10c, 10th story, 3rd apartment from south at west
Oct 29, 2024 · Apt 10C
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the kitchen located at apt 10c, 10th story, 3rd apartment from south at west
Oct 29, 2024 · Apt 10C
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 10c, 10th story, 3rd apartment from south at west
Oct 29, 2024 · Apt 10C
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set in the entrance located at apt 10c, 10th story, 3rd apartment from south at west , section ''east''
Jan 4, 2024 · Apt 10C
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at closet (east wall) approximately 2 sq.ft. in the private hallway located at apt 10c, 10th story, 3rd apartment from south at west , section ''east''
Jan 4, 2024 · Apt 10C
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at door leading to fire stairs (a) at public hall stairs, 2nd story
Jan 4, 2024
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... at closet (east wall) approximately 2 sq.ft. in the private hallway located at apt 10c, 10th story, 3rd apartment from south at west , section ''east'' original violation 16565112 issued 04-jan-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jan 4, 2024 · Apt 10C
Open — Defect letter issued - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at closet east wall. in the private hallway located at apt 10c, 10th story, 3rd apartment from south at west , section ''east''
Jan 4, 2024 · Apt 10C
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling. in the bathroom located at apt 10c, 10th story, 3rd apartment from south at west , section ''east''
Jan 4, 2024 · Apt 10C
Open — Not complied with - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Aug 31, 2017
Closed — Violation dismissed
DOB building violations · 10
- Construction other optional
Structure rendered non compliant due to vehicle impacting building at time of inspection a vehicle impacted entryway od commercial space dis placing doors
Oct 24, 2024
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 25, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 25, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 26, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 26, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 26, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 26, 2015
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2013 inspection/test
Oct 31, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2013 inspection/test
Oct 31, 2014
Dob violation - dismissed
ECB violations · 20
- Class - 2
Shorten governor cable and provide two (2) crosby clips on the cable. provide a fire rated seal around hall button greenfield inside the shaft at roof level. remove all debris from car top. properly secure toe
May 21, 2020
Resolve - Class - 2
Shorten governor cable and provide two(2) crosby clips on the cable. , repair inoperative alarm bell. properly secure toe guard. adjust/repair limits to prevent the elevator relevel
May 21, 2020 · Penalty $312
Resolve - Class - 2
2x10,99bb15,41i10-2x10)phone inoperative. 99)cat 1 tag expired. 43)motor room door damaged.
Jul 18, 2018
Resolve - Class - 2
97r## 97r##-illegal use of device #1p47511 being used as construction elevator,remedy file application to obtain permit to use as construction elevator as per asmea 17.1-2000.cease use lift 212-566-5542
Mar 25, 2014
Resolve - Class - 1
28-110.1. osha 10. at time of inspection observed active jobsite. upon request approx 12 workers installing floors did not have osha 10 cards as required. remedy: all workers onsite must have osha 10 training
Mar 24, 2014 · Penalty $400
Resolve - Class - 1
Failure to maintain adequate housekeeping per section rrequirement. noted from 12th flr to sub basement broken tiles on the flr and piles ofdebris on all level cut metal studs debris cardboard boxes & waste on
Nov 19, 2013 · Penalty $2,400
Resolve - Class - 1
Holes/opening not covered: noted from 12 flr to basement open holes approx 18" by 12" not covered & not secured. remedy: secure holes and openings.
Nov 19, 2013 · Penalty $2,400
Resolve - Class - 2
Sec. bc 3314.8.1. mesh installation: noted at 12 sty concrete bldg under construction has supported pipe scaffold erected at exp 1, w/masonry @ between 11th & 10th flrs & w/no mesh installed at end of scaffold
Oct 2, 2013
Resolve - Class - 2
Sec. failure to comply w/an order of the commissioner regarding concrete embedded safety strap dated on june 13, 2008. noted: at time of inspection, no individual inspection record of embedded concrete strap
Oct 2, 2013
Resolve - Class - 2
Work does not conform to approved documents and/or approved amendments. noted: at 12 sty nb has pipe scaffold erected to approx 95' has no full staircase on exterior scaffold. approved plan under permit
Oct 2, 2013
Resolve
Show 10 more ↓
- Class - 2
Sec. bc 3307.5.2 flag persons. noted: at 12 sty concrete bldg under construction has equipment on the street loading material onto site w/noflagmen, creating a hazardous condition for traffic & on site windows.
Oct 1, 2013
Resolve - Class - 2
Sec. 3303.4.5.3 materials at the edge of bldg perimeter. at time of inspection observed materials stored & stacked at edge of bldg perimeterthroughout construction site. black iron piping,debris,scaffolding
Jul 9, 2013
Resolve - Class - 1
Sec. 3308.3 vertical safety netting not per code. during time of inspection vertical netting ripped,torn or missing,at various levels throughout construction site. vertical netting missing from multiple (bays),
Jul 9, 2013 · Penalty $1,600
Resolve - Class - 1
Failure to institute/maintain safety equiptment toe boards. at time ofinspections toe boards missing through-out various areas & levels of construction site. toe boards were missing at exposures & court yard.
Jul 9, 2013 · Penalty $1,000
Resolve - Class - 2
Sec. 3307.4 warning sign & light to protect public from hazards - danger sign vehicular traffic barricade. at time of inspection 1 lane of traffic was obstructed there were no jerzy barriors or reflective light
Jul 9, 2013
Resolve - Class - 1
Holes/openings not covered. at time of inspection as noted on active construction sites holes varing in diameter at alot of areas through construction site 50-60 holes app 6"in dia. remedy: cover all openings.
Jul 9, 2013 · Penalty $1,200
Resolve - Class - 1
3303.2.4 failure to maintain sanitary facilities.at the time of my in-spection,approx 50 workers on site erecting new bldg structure.while walking on the sidewalk going into the job site i smell feces and stale
May 9, 2013 · Penalty $400
Resolve - Class - 1
Failure to safeguard all persons and proprty affected by construction operations.at time approx 50 workers on site erecting 12 story bldg.structure up to 2-story erecting 3story new bldg adjacent to 11th avenue
May 9, 2013 · Penalty $12,000
Resolve - Class - 2
Bc3307.3.2 failure to provide required lot line construction fence.noted:at time of inspection at north exposure construction fence not installed as per site safety plans indicates approx 25'in length.differenc
Mar 1, 2013
Resolve - Class - 2
Bc280-116.2.3 failure to provide an adequate inspection program.noted:at time of inspection foundation in progress.tr2 & tr3 does not have all required signatures as required. stop all concrete placement.rmdy:
Mar 1, 2013
Resolve
Complaints
- Heat/hot water
Entire building
Feb 4, 2026 · Apt BLDG
Close - Paint/plaster
Wall
Aug 18, 2025 · Apt 89FLOO
Close - Paint/plaster
Wall
Aug 18, 2025 · Apt 89FLOO
Close - Paint/plaster
Wall
Aug 18, 2025 · Apt 89FLOO
Close - Paint/plaster
Wall
Aug 18, 2025 · Apt 89FLOO
Close - Paint/plaster
Wall
Aug 18, 2025 · Apt 10C
Close - Paint/plaster
Ceiling
Aug 18, 2025 · Apt 10C
Close - Unsanitary condition
Mold
Aug 18, 2025 · Apt 10C
Close - General
Ventilation system
Aug 18, 2025 · Apt 10C
Close - Paint/plaster
Wall
Aug 18, 2025 · Apt 10C
Close
Show 40 more ↓
- Door/window
Door frame
Aug 18, 2025 · Apt 10C
Close - Paint/plaster
Ceiling
Aug 18, 2025 · Apt 10C
Close - Plumbing
Bathtub/shower
Aug 18, 2025 · Apt 10C
Close - Plumbing
Toilet
Aug 18, 2025 · Apt 10C
Close - Paint/plaster
Ceiling
Aug 18, 2025 · Apt 10C
Close - Paint/plaster
Ceiling
Aug 18, 2025 · Apt 10C
Close - Door/window
Window frame
Aug 18, 2025 · Apt 10C
Close - Door/window
Window pane
Aug 18, 2025 · Apt 10C
Close - Electric
Wiring
Aug 18, 2025 · Apt 10C
Close - Electric
No lighting
Aug 18, 2025 · Apt 10C
Close - Electric
Lighting
Aug 18, 2025 · Apt 10C
Close - Heat/hot water
Entire building
Jan 22, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 6, 2024 · Apt BLDG
Close - Paint/plaster
Ceiling
Oct 23, 2024 · Apt 10C
Close - General
Cabinet
Oct 23, 2024 · Apt 10C
Close - Unsanitary condition
Pests
Oct 23, 2024 · Apt 10C
Close - General
Bell/buzzer/intercom
Oct 23, 2024 · Apt 10C
Close - General
Ventilation system
Oct 23, 2024 · Apt 10C
Close - Electric
Wiring
Oct 23, 2024 · Apt 10C
Close - Flooring/stairs
Floor
Oct 23, 2024 · Apt 10C
Close - Flooring/stairs
Floor
Oct 23, 2024 · Apt 10C
Close - Flooring/stairs
Floor
Oct 23, 2024 · Apt 10C
Close - Electric
No lighting
Oct 23, 2024 · Apt 10C
Close - Electric
Outlet/switch
Oct 23, 2024 · Apt 10C
Close - Plumbing
Radiator
Oct 23, 2024 · Apt 10C
Close - Appliance
Refrigerator
Oct 23, 2024 · Apt 10C
Close - Paint/plaster
Wall
Oct 23, 2024 · Apt 10C
Close - Unsanitary condition
Pests
Oct 23, 2024 · Apt 10C
Close - Flooring/stairs
Floor
Oct 23, 2024 · Apt 10C
Close - Plumbing
Bathtub/shower
Oct 23, 2024 · Apt 10C
Close - Plumbing
Bathtub/shower
Oct 23, 2024 · Apt 10C
Close - Door/window
Window frame
Oct 23, 2024 · Apt 10C
Close - Paint/plaster
Cabinet
Oct 23, 2024 · Apt 10C
Close - General
Bell/buzzer/intercom
Oct 23, 2024 · Apt 10C
Close - Paint/plaster
Wall
Oct 23, 2024 · Apt 10C
Close - Water leak
Damp spot
Oct 23, 2024 · Apt 10C
Close - Paint/plaster
Wall
Oct 23, 2024 · Apt 10C
Close - Plumbing
Toilet
Oct 23, 2024 · Apt 10C
Close - Paint/plaster
Ceiling
Oct 23, 2024 · Apt 10C
Close - Door/window
Door
Oct 23, 2024 · Apt 10C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 2013
- Floors
- 12
- Residential units
- 135
- Building area
- 131,660 ft²
- Lot area
- 13,646 ft²
- Zoning
- R8A
- Community board
- 103
- Council district
- 2
- Block / lot
- 372 / 41
- Assessed value
- $16,700,850
- Landmark / historic district
- No
HPD registration #143861, last renewed Oct 7, 2025.
Questions about 310 East 2 Street
Who owns 310 East 2 Street?
The owner of record in NYC Department of City Planning PLUTO data is Alphabet Plaza LLC.
Does 310 East 2 Street have violations?
Yes. NYC HPD has recorded 22 housing violations at this property.
Is 310 East 2 Street rent stabilized?
NYC Department of Finance tax bills listed 135 rent-stabilized units here in 2024 (about 100% of its 135 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 310 East 2 Street built?
City records list 2013 as the year it was built.
How many apartments are in 310 East 2 Street?
It has 135 residential units and 136 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.