316 East 3 Street
Manhattan, NY 10009BBL 1-00372-0031Map
Owner of record: 318 East Associates, LLC
316 East 3 Street is an elevator apartment building built in 2012 in Manhattan, 10009. It has 33 residential units across 7 floors. The owner of record is 318 East Associates, LLC. HPD has recorded 10 housing violations here, most recently on September 27, 2026. 3 of the 10 most recent violations are still open. City tax records listed 7 rent-stabilized apartments here in 2024.
- HPD violations
- 10
- DOB violations
- 15
- ECB violations
- 22
- HPD complaints
- 44
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 10
- ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings
Sep 27, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox at public hall, 1st story
Sep 27, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Sep 27, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 10, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 5c, 5th story, 1st apartment from north at east
Jan 8, 2018 · Apt 5C
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Nov 16, 2017
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Nov 16, 2017
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Nov 16, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 1, 2015
Closed — Violation dismissed
DOB building violations · 15
- Elevator elevatorrequired
E-elevator elevatorrequired
May 21, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 21, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 8, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 7, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 26, 2016
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 31, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2013 inspection/test
Oct 31, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed
Show 5 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed
ECB violations · 22
- Class - 3
Observed 2 separate fences installed in front of the building on both sides of front entrance door. fence height is approximately 6ft high and thats exceeds the legal height of 4ft for front yard as per buildin
Oct 9, 2026 · Penalty $200
Active - Class - 1
Work without a permit. atoi i observed in apt 5e a partition (aprox 8' to 10' x 8' )has been erected without a dob permit for the scope of work. op-71-26-11293, obtain permit
Sep 3, 2026 · Penalty $2,500
Active - Class - 1
Occupancy contrary to that allowed by the certificate of occupancy or buildings department records. atoi i observed in apt 5e a partition (aprox 8' to 10' x 8' )has been erected without a dob permit for the sco
Sep 3, 2026 · Penalty $2,500
Active - Class - 1
Failure to provide unobstructed exit passageway.using the landing on staircase exit 7b as a storage for bicycles.rem:remove obstruction.
Dec 3, 2020 · Penalty $312
Resolve - Class - 2
68-b-7, 59-bb-15, 37-b-7 68 log book not up to date 59-brake maintenace tag expired 37 work light in the over head inoperative
Aug 8, 2019
Resolve - Class - 1
New building or open lot occupied without a valid certificate of occupancy. noted: expired c of o 6/28/17 120776785-08 building c of o not signed off. at time of inspection male observed living in apartment 5e.
Sep 11, 2017 · Penalty $1,000
Resolve - Class - 2
Failure to maintain bldg in code complaint manner : lack of a system of automatic sprinklers where required per bc 903.2; 27-954. failure toprovide sprinkler for garbage chute. cellar- 7th fl. remedy: provide a
Sep 22, 2014 · Penalty $2,500
Resolve - Class - 1
Filed a certificate, form, application etc., containing a material false statements. on 9/10/14 during physical inspection i observed that the suspended non-gas hotwater heaters are not properly supported from
Sep 10, 2014
Resolve - Class - 2
Use or installation of plumbing materials or equipment which do not comply with rs-16. during physical inspection i observed that the emergency drain piping for the hotwater heaters drip pans are p.v.c. piping.
Sep 10, 2014 · Penalty $250
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction - no toe board,zero cable. at time of inspection observed cable in place as guardrails;no toeboard/zero cable at perimeter at
Sep 17, 2013 · Penalty $1,000
Resolve
Show 12 more ↓
- Class - 1
Sec. 3307.6.2;3301.2 overhead protection for walkways. at time of inspection observed adjacent bldg (314 e 3 street) has rear yard that is accessible by tenants living in 1 floor apt. new bldg (316 e 3) is
Sep 17, 2013
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction - no guard rails. noted: opening in floor (roof level) approx 2 feet by 2 feet no guard rail around the opening. potential for
Sep 17, 2013
Resolve - Class - 1
Sec. 3301.2;27-1009(a) holes/opening not covered. noted: holes/openings in size from foot by foot to approx 2'feet by 4 feet not covered throughout the bldg. potential for someone to fall through.
Sep 17, 2013 · Penalty $1,600
Resolve - Class - 1
Sec. 3307.3.2 failure to provide fence as required. noted: job site fence missing at exposure 3 & 4 (rear yard). potential for someone to enter construction site at exp 3 & 4. exposure 4 leads to rear yard of
Sep 17, 2013 · Penalty $1,600
Resolve - Class - 1
Sec. 1906.6 reshores in proximity to facade w/i 10feet,not secured. noted: reshores (floors 4,5,6) in proximity to facade w/i 10feet not secured. remedy: secure reshore in proximity to facade w/i 10feet.
Sep 17, 2013
Resolve - Class - 1
Sec. 3309.10 no protection for roof,skylight & etc. noted: adjacent bldg's roof not protected (314 e 3 st (exp 4) 320 e 3 st (exp 2)) copingstone at parapet wall w/i 20feet to new bldg not protected. also
Sep 17, 2013 · Penalty $1,600
Resolve - Class - 1
3304p access excavation work in progress under nb job#120776785 exp 9/9/13 approx 50'wide by 80'length and 10'deep.however, safe means of ingress and egress not available from foundation area.approx 80%complete
Mar 11, 2013 · Penalty $1,600
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations.noted under nb job#120776785 exp 9/9/13 escavation work in progress.foundation wall erected at exposure 2,3,and 4 rear section of
Mar 11, 2013 · Penalty $2,400
Resolve - Class - 1
Failure to provide protection at sides of excavation.noted excavation work in progress under job #120776785 exp 9/9/13.2nd phse of excavation pit for elevator 10ft deep approx: in progress shear cut.no sheethin
Mar 11, 2013 · Penalty $2,400
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperations due to construction/excavation settlement & movement has occurred on adjacent structures (320 east 3rd street & 314 east 3rd st).
Dec 13, 2012 · Penalty $1,200
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments. noted: a nb under excavation has shoring in place underjob #121376493 w/steel soldier beams has wood shoring above existing
Dec 12, 2012 · Penalty $1,000
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temp construction - no guardrails. noted: at excavation, in progress, no guardrails around excavation pit measuring in depth approx 12'-15' deep at
Dec 12, 2012 · Penalty $1,200
Resolve
Complaints
- General
Signage missing
Sep 1, 2026 · Apt 4B
Close - General
Signage missing
Aug 27, 2026 · Apt BLDG
Close - Safety
Fire escape
Aug 27, 2026 · Apt BLDG
Close - Unsanitary condition
Mold
Dec 8, 2025 · Apt 6A
Close - Paint/plaster
Wall
Dec 8, 2025 · Apt 6A
Close - Water leak
Damp spot
Dec 8, 2025 · Apt 6A
Close - Unsanitary condition
Pests
May 8, 2024 · Apt 7C
Close - Heat/hot water
Apartment only
Nov 15, 2018 · Apt 6A
Close - Unsanitary condition
Mold
Oct 15, 2018 · Apt BASEME
Close - Heat/hot water
Apartment only
Jan 6, 2018 · Apt 5C
Close
Show 34 more ↓
- Heat/hot water
Apartment only
Jan 4, 2018 · Apt 5C
Close - Heat/hot water
Apartment only
Dec 27, 2017 · Apt 7C
Close - Heat/hot water
Entire building
Nov 15, 2017 · Apt 2E
Close - Unsanitary condition
Pests
Sep 22, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 14, 2017 · Apt 4C
Close - Heat/hot water
Entire building
Jan 14, 2017 · Apt 3C
Close - Heat/hot water
Entire building
Jan 14, 2017 · Apt 6E
Close - Heat/hot water
Entire building
Jan 14, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 14, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 14, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 14, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 14, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 14, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 9, 2017 · Apt 4B
Close - Unsanitary condition
Mold
Dec 21, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 23, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 23, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 22, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 22, 2016 · Apt 7A
Close - Heat/hot water
Entire building
Jan 22, 2016 · Apt 1A
Close - Heat/hot water
Entire building
Jan 22, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 22, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 22, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 22, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 22, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 22, 2016 · Apt 6C
Close - Heat/hot water
Entire building
Jan 22, 2016 · Apt 6D
Close - Heat/hot water
Entire building
Jan 22, 2016 · Apt 1A
Close - Heat/hot water
Entire building
Jan 11, 2016 · Apt BLDG
Close - Plumbing
Bathtub/shower
Nov 23, 2015 · Apt 6B
Close - Plumbing
Toilet
Nov 23, 2015 · Apt 6B
Close - Plumbing
Basin/sink
Nov 23, 2015 · Apt 6B
Close - General
Cabinet
Nov 7, 2015 · Apt 6B
Close - Plumbing
Toilet
Nov 7, 2015 · Apt 6B
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Jul 30, 2026 | $14,150,000 | Rentals - elevator apartments | 33 |
Building details
- Building type
- Elevator apartment building (D9)
- Year built
- 2012
- Floors
- 7
- Residential units
- 33
- Building area
- 27,496 ft²
- Lot area
- 5,746 ft²
- Zoning
- R8B
- Community board
- 103
- Council district
- 2
- Block / lot
- 372 / 31
- Assessed value
- $3,047,400
- Landmark / historic district
- No
HPD registration #144602, last renewed Nov 28, 2025.
Questions about 316 East 3 Street
Who owns 316 East 3 Street?
The owner of record in NYC Department of City Planning PLUTO data is 318 East Associates, LLC.
Does 316 East 3 Street have violations?
Yes. NYC HPD has recorded 10 housing violations at this property.
Is 316 East 3 Street rent stabilized?
NYC Department of Finance tax bills listed 7 rent-stabilized units here in 2024 (about 21% of its 33 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 316 East 3 Street built?
City records list 2012 as the year it was built.
How many apartments are in 316 East 3 Street?
It has 33 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.