roofy

106 Ridge Street

Manhattan, NY 10002BBL 1-00344-0076Map

Owner of record: 106 Ridge Street Ground Owner LLC

106 Ridge Street is a walk-up apartment building built in 1914 in Manhattan, 10002. It has 20 residential units across 6 floors. The owner of record is 106 Ridge Street Ground Owner LLC. HPD has recorded 70 housing violations here, most recently on May 7, 2026. 3 of the 50 most recent violations are still open.

HPD violations
70
DOB violations
22
ECB violations
16
HPD complaints
141

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation May 7, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 70

  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 2b, 3rd story, 1st apartment from south at west

    May 7, 2026 · Apt 2B

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at vestibule door , 1st story

    May 7, 2026

    Closed — Violation closed
  • B

    Provide adequate supply of hot water for the fixtures at wash basin. in the bathroom located at apt 2b, 3rd story, 1st apartment from south at west

    May 7, 2026 · Apt 2B

    Open — Nov sent out
  • B

    Provide and maintain a pure and wholesome water supply that was found discolored at hot water faucet at wash basin in the bathroom located at apt 2b, 3rd story, 1st apartment from south at west

    May 7, 2026 · Apt 2B

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 4d, 5th story, 2nd apartment from west at north

    May 20, 2025 · Apt 4D

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 4d, 5th story, 2nd apartment from west at north

    May 20, 2025 · Apt 4D

    Closed — Violation dismissed
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 4d, 5th story, 2nd apartment from west at north

    May 20, 2025 · Apt 4D

    Closed — Violation dismissed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 5th story balcony, front stack

    Jun 4, 2023

    Closed — Violation dismissed
  • C

    Code: arrange and make self-closing the doors ... in the entrance located at apt 1d, 2nd story, 2nd apartment from west at north

    Oct 20, 2021 · Apt 1D

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1d, 2nd story, 2nd apartment from west at north

    Oct 20, 2021 · Apt 1D

    Closed — Violation dismissed
Show 40 more ↓
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 1d, 2nd story, 2nd apartment from west at north

    Oct 20, 2021 · Apt 1D

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Oct 20, 2021

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .. at public hall, 1st story

    Oct 20, 2021

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story

    Oct 20, 2021

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Oct 20, 2021

    Closed — Violation dismissed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Oct 20, 2021

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Oct 20, 2021

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Oct 20, 2021

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Oct 20, 2021

    Closed — Violation dismissed
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1d, 2nd story, 2nd apartment from west at north

    Oct 20, 2021 · Apt 1D

    Closed — Violation dismissed
  • C

    Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 1d, 2nd story, 2nd apartment from west at north

    May 6, 2021 · Apt 1D

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ... at public hall, 1st story

    May 6, 2021

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 1, 2021

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt 5a, 5th story, 1st apartment from south at west

    Nov 19, 2020 · Apt 5A

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 5a, 5th story, 1st apartment from south at west

    Nov 19, 2020 · Apt 5A

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 1st room from north located at apt 5a, 5th story, 1st apartment from south at west

    Nov 19, 2020 · Apt 5A

    Closed — Violation dismissed
  • A

    And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all stories all balconies and all componets at building front at fire escape

    Aug 27, 2019

    Closed — Violation dismissed
  • A

    And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all stories all balconies and all componets at south stack at fire escape

    Aug 27, 2019

    Closed — Violation dismissed
  • A

    And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all stories all balconies and all componets at north stack at fire escape

    Aug 27, 2019

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of hasp and pad lock door at east wall leading to east yard at public hall, 1st story

    Aug 27, 2019

    Closed — Violation dismissed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration metal gate erected creating storage area under stairs at public hall, 1st story

    Aug 27, 2019

    Closed — Violation dismissed
  • A

    Post and maintain a street number on the front of the dwelling plainly visible from the sidewalk. at front areaway, 1st story

    Aug 20, 2019

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... at cabinet counter top in the kitchen located at apt 5b, 6th story, 1st apartment from south at west

    Jun 26, 2017 · Apt 5B

    Closed — Violation closed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisiting of flower pots, building front , 5th story

    Jun 26, 2017

    Closed — Violation closed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisiting of air conditioner at window,building front , 6th story

    Jun 26, 2017

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Jun 26, 2017

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system and at boiler room door at public hall, 1st story

    Jun 26, 2017

    Closed — Violation closed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Jun 26, 2017

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of household items at bulkhead public hall

    Jun 26, 2017

    Closed — Violation closed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes at south consisiting of air conditioner at window , 6th story

    Jun 26, 2017

    Closed — Violation closed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes at south consisiting of air conditioner at window , 4th story

    Jun 26, 2017

    Closed — Violation closed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes at south consisiting of air conditioner at window , 3rd story

    Jun 26, 2017

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the 3rd room from north located at apt 5b, 6th story, 1st apartment from south at west

    Jun 26, 2017 · Apt 5B

    Closed — Violation closed
  • B

    Abate the nuisance consisting of mice in the entire apartment located at apt 5b, 6th story, 1st apartment from south at west

    Jun 26, 2017 · Apt 5B

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Jun 20, 2017

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Jun 20, 2017

    Closed — Violation closed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Jun 20, 2017

    Closed — Violation closed
  • A

    Refit lower window sash in the 1st room from north located at apt 2c, 3rd story, 1st apartment from west at north

    Jun 20, 2017 · Apt 2C

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Jan 31, 2017

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jan 31, 2017

    Closed — Violation closed

DOB building violations · 22

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 24, 2011

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 24, 2011

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 1, 2011

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 15, 2010

    Dob violation - dismissed
  • Construction other optional

    Failure to maintain: exposure1 at s/elevation parapet has delaminating stucco. deteriorated lintels & stress cracks at rear yard w/cracked & delaminating stucco at parapet

    Aug 26, 2010

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jul 13, 2010

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
Show 12 more ↓
  • Construction other optional

    C-construction other optional

    Oct 31, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed
  • Electric signs none

    Es-electric signs none

    May 31, 1990

    Dob violation - dismissed
  • Electric signs none

    Es-electric signs none

    May 31, 1990

    Dob violation - dismissed

ECB violations · 16

  • Class - 2

    Failure to provide approved/accepted construction documents at the jobsite at the time of inspection.at the time of inspection,the constructor failed to have dob approved drawings on site at the time of inspect

    Sep 20, 2017 · Penalty $250

    Resolve
  • Class - 2

    Failure to post permit for work at premises.at the time of inspection,the constructor did not have a valid permit posted on the storefront where the construction work was taking place.rem:post permit.

    Sep 20, 2017 · Penalty $400

    Resolve
  • Class - 1

    Failure to comply with the commissioners order contained in summons/violation#34879780l issued on 03/09/11 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.work w/o permit noted & t

    Jul 5, 2017

    Resolve
  • Class - 1

    Failure to comply w/commissioner's to correct nov #34879780l. noted:job #120724939 to correct cied nov pertaining to work w/o permitn in apt1b was approved on 6/15/11. no permit was obtained for apt 1b.rmdy:com

    Mar 6, 2017

    Resolve
  • Class - 2

    Failure to maintain bldg walls & appurtenances. noted: at time of inspection i)spalled masonry at parapets of exp#1 & 4(rivington st)ii)step cracks at brick spandril between floors 3&4 at south section of exp#1

    Feb 7, 2017 · Penalty $500

    Resolve
  • Class - 2

    Failure to comply w/the comm's order to file a cert of correction w/the dept of bldgs noted the following conditions: ecb violations 34862213y;34879780l & 34879779y do not appear to have a c of c filed at the

    May 19, 2012 · Penalty $800

    Resolve
  • Class - 1

    Failure to maintain bldg in a compliant manner.defects noted:@ time of inspection there is missing fire rating @ cellar level & in apt 1b where pex plumbing tubing is run.1st flr staircase was loose treads,ther

    Mar 9, 2011 · Penalty $1,000

    Resolve
  • Class - 2

    Failure to provide unobstructed exit passageway.defects noted:@ time of inspec there is flower pot & debris on fire escape @ exp#4,obstructing safe exit on fire escape in cases of emergency.rem:remove obstructi

    Mar 9, 2011 · Penalty $400

    Resolve
  • Class - 2

    Work w/o permit.work noted:@ time of inspec full height partition walls were erected creating a 2nd bedroom in apt#1b.work included framing & electrical for switches & outlets.rem:obtain a permit or restore pre

    Mar 9, 2011 · Penalty $800

    Resolve
  • Class - 1

    Gas being supplied to bldg w/o inspection & certification by dob.basedon physical observation of gas fired boilers in cellar of above address,no inspections were performed on new boilers(functioning)installed i

    Mar 8, 2011 · Penalty $5,000

    Resolve
Show 6 more ↓
  • Class - 1

    Failure to have new or altered plumbing system tested.based on search of departmental records,no inspections were performed on gas lines(new) installed for 20 boilers installed in cellar.rem:perform test

    Mar 8, 2011 · Penalty $1,000

    Resolve
  • Class - 1

    Gas being supplied to bldg w/o inspection & certification by dob.basedon physical observation of gas fired boilers(20)in cellar of above address,no inspections were performed on new (functioning)boilers install

    Mar 8, 2011 · Penalty $1,000

    Resolve
  • Class - 1

    Fail to maintain bldg. noted: delaminating stucco at exp 1 & 3 at parapet level. stress cracks between sills & deteriorating arched lintels @ exp 3. deteriorated brick work in bulk head. remedy: obtain required

    Aug 26, 2010 · Penalty $5,000

    Resolve
  • Class - 1

    Unlawfully continuing to work while on notice of stop work order.notedat the 4th floor, building unit 3d work was stopped and stop work order 042108c0303gr.issued for work at apt 3d w/out a permit.work is now

    Jul 13, 2010

    Resolve
  • Hazardous

    Failure to maintain exterior bouilding wall.noted:concrete stairs 4ft wide(approx)with no handrail,from 1st fl to cellar level rear yard.danger of falling.broken missing bricks & doortar on rear facade at 1st f

    Mar 22, 2001 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to maintain bldg exterior. noted: at rear of bldg courtyard north side chimney brickwork broken, damaged & loose at top w/ cracked& spalling stucco throughout.

    Apr 15, 1998 · Penalty $2,500

    Resolve

Complaints

  • Heat/hot water

    Entire building

    May 6, 2026 · Apt BLDG

    Close
  • Door/window

    Window pane

    Jan 20, 2025 · Apt 5B

    Close
  • Heat/hot water

    Apartment only

    Jan 20, 2025 · Apt 5B

    Close
  • Plumbing

    Bathtub/shower

    Jan 20, 2025 · Apt 5B

    Close
  • Door/window

    Window pane

    Jan 13, 2025 · Apt 5B

    Close
  • Water leak

    Slow leak

    Jan 13, 2025 · Apt 4D

    Close
  • Plumbing

    Bathtub/shower

    Jan 13, 2025 · Apt 5B

    Close
  • Water leak

    Damp spot

    Jan 8, 2025 · Apt 5B

    Close
  • Heat/hot water

    Apartment only

    Jan 8, 2025 · Apt 5B

    Close
  • Heat/hot water

    Apartment only

    Jan 8, 2025 · Apt 5B

    Close
Show 40 more ↓
  • Safety

    Carbon monoxide detector

    Nov 1, 2023 · Apt 3C

    Close
  • Safety

    Smoke detector

    Nov 1, 2023 · Apt 3C

    Close
  • Electric

    Outlet/switch

    Nov 1, 2023 · Apt 3C

    Close
  • Door/window

    Door

    Jun 16, 2023 · Apt 4D

    Close
  • Heat/hot water

    Apartment only

    Dec 27, 2022 · Apt 2B

    Close
  • Electric

    Outlet/switch

    Jun 9, 2022 · Apt 3C

    Close
  • Door/window

    Door

    Jun 9, 2022 · Apt 3C

    Close
  • Safety

    Carbon monoxide detector

    Jun 9, 2022 · Apt 3C

    Close
  • Safety

    Smoke detector

    Jun 9, 2022 · Apt 3C

    Close
  • Heat/hot water

    Entire building

    Nov 29, 2021 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Nov 23, 2021 · Apt 3B

    Close
  • Heat/hot water

    Apartment only

    Nov 16, 2021 · Apt 4B

    Close
  • General

    Cooking gas

    Sep 10, 2021 · Apt 1D

    Close
  • Appliance

    Electric/gas range

    Mar 2, 2021 · Apt 1D

    Close
  • Heat/hot water

    Apartment only

    Mar 2, 2021 · Apt 1D

    Close
  • Heat/hot water

    Apartment only

    Jan 18, 2021 · Apt 2C

    Close
  • Heat/hot water

    Apartment only

    Dec 19, 2020 · Apt 1A

    Close
  • Water leak

    Damp spot

    Dec 1, 2020 · Apt 5A

    Close
  • Water leak

    Slow leak

    Dec 1, 2020 · Apt 5A

    Close
  • Heat/hot water

    Entire building

    Nov 17, 2020 · Apt 5B

    Close
  • Water leak

    Slow leak

    Oct 29, 2020 · Apt 5A

    Close
  • Heat/hot water

    Apartment only

    Jan 22, 2019 · Apt 2D

    Close
  • Water leak

    Slow leak

    Jan 18, 2018 · Apt 5D

    Close
  • Paint/plaster

    Wall

    Jun 19, 2017 · Apt 5B

    Close
  • Unsanitary condition

    Pests

    Jun 19, 2017 · Apt 5B

    Close
  • Paint/plaster

    Wall

    Jun 19, 2017 · Apt 5B

    Close
  • Unsanitary condition

    Mold

    Jun 19, 2017 · Apt 5B

    Close
  • Unsanitary condition

    Mold

    Jun 19, 2017 · Apt 5B

    Close
  • Door/window

    Window frame

    Jun 14, 2017 · Apt 2C

    Close
  • Water leak

    Heavy flow

    Jan 26, 2017 · Apt 2C

    Close
  • Flooring/stairs

    Floor

    Jan 26, 2017 · Apt 2C

    Close
  • Paint/plaster

    Wall

    Jan 26, 2017 · Apt 2C

    Close
  • Paint/plaster

    Ceiling

    Jan 26, 2017 · Apt 2C

    Close
  • Heat/hot water

    Apartment only

    Jan 9, 2017 · Apt 1C

    Close
  • Heat/hot water

    Apartment only

    Dec 21, 2016 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Nov 21, 2016 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Sep 26, 2016 · Apt 5B

    Close
  • Unsanitary condition

    Pests

    Sep 26, 2016 · Apt 5B

    Close
  • Plumbing

    Radiator

    Sep 26, 2016 · Apt 5B

    Close
  • Plumbing

    Bathtub/shower

    Sep 26, 2016 · Apt 5B

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1914
Floors
6
Residential units
20
Building area
22,370 ft²
Lot area
4,513 ft²
Zoning
R7A
Community board
103
Council district
2
Block / lot
344 / 76
Assessed value
$3,463,200
Landmark / historic district
No

HPD registration #131912, last renewed Aug 31, 2025.

Questions about 106 Ridge Street

Who owns 106 Ridge Street?

The owner of record in NYC Department of City Planning PLUTO data is 106 Ridge Street Ground Owner LLC.

Does 106 Ridge Street have violations?

Yes. NYC HPD has recorded 70 housing violations at this property.

Is 106 Ridge Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 106 Ridge Street built?

City records list 1914 as the year it was built.

How many apartments are in 106 Ridge Street?

It has 20 residential units and 23 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.